ML24191A304
Jump to navigation
Jump to search
| ML24191A304 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 05/06/2024 |
| From: | Ameren Missouri, Union Electric Co |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML24191A265 | List:
|
| References | |
| ULNRC-06877 | |
| Download: ML24191A304 (1) | |
Text
CALLAWAY - SA 17.0-i TABLE OF CONTENTS CHAPTER 17.0 QUALITY ASSURANCE Section Page 17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE.................. 17.2-1
CALLAWAY - SA 17.2-1 Rev. OL-13 5/03 17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE The Operational Quality Assurance Program for the Union Electric Company Callaway Plant is described in the Operating Quality Assurance Manual (OQAM). The Quality Assurance Program description, formerly also maintained in this section of the FSAR, is now maintained solely in the OQAM as a separate licensing document. The OQAM will be maintained in accordance with the requirements of 10 CFR 50.54.