ML24191A280

From kanterella
Jump to navigation Jump to search
Final Safety Analysis Report Rev. OL-27 and Technical Specification Bases Rev. 25, Chapter 18, Response to NUREG-0737, Clarification of TMI Action Plan Requirements
ML24191A280
Person / Time
Site: Callaway Ameren icon.png
Issue date: 05/06/2024
From:
Ameren Missouri, Union Electric Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML24191A265 List: ... further results
References
ULNRC-06877
Download: ML24191A280 (1)


Text

CALLAWAY - SA 18.0-i Rev. OL-13 5/03 18.0 RESPONSE TO NUREG-0737, 'CLARIFICATION OF TMI ACTION PLAN REQUIREMENTS The discussion of the Union Electric response to NUREG-0737 is subdivided into three sections: 18.1, Operational Safety; 18.2, Siting and Design; and 18.3, Emergency Preparations and Radiation Protection. The subsections presenting the NRC guidance are verbatim quotes from NRC documents.

These sections are discussed in their entirety in the Standard Plant.