05000336/LER-1999-001, Forwards LER 99-001-00 Re Thermal Reactor Power Limit That Was Exceeded.Commitments Made by Util Encl
| ML20212E762 | |
| Person / Time | |
|---|---|
| Site: | |
| Issue date: | 09/20/1999 |
| From: | Schwarz C NORTHEAST NUCLEAR ENERGY CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20212E765 | List: |
| References | |
| B17875, NUDOCS 9909270140 | |
| Download: ML20212E762 (5) | |
| Event date: | |
|---|---|
| Report date: | |
| Reporting criterion: | 10 CFR 50.73(a)(2)(i) |
| 3361999001R00 - NRC Website | |
text
r Northeast Rose Feny Rd. (Rouw 15, Waford, CM6385 Nuclear Energy wiii. tone Nociear po.er siatio.
g Northeast Nuclear Energy Company P.O. Box 128
- ~.
,,.~
Taterford, CT 06385-0128 z
(860) 447 1791 Faz (860) 444-4277 The Northeast Utilities System SEP 2 01999 Docket No 50-336 B17875 Re: 10 CFR 50.73(a)(2)(i)
U.S. Nuclear Regulatory Commission Attn: Document Control Desk' Washington, DC 20555 Millstone Nuclear Power Station, Unit No. 2 Licensee Event Report 99-011-00 Exceedness of Thermal Reactor Power Limit This letter forwards Licensee' Event Report (LER) 99-011-00, documenting an event that occurred at Millstone Nuclear Power Station, Unit No. 2, on August 23,1999. This LER is being submitted pursuant to 10 CFR 50.73(a)(2)(i).
- - The Northeast Nuclear Energy Company's (NNECO's) commitments made within this letter are included in Attachment 1.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY l
ban CJ. Schwarz Q 4tation Director Qy '
cc: see page 2 9909270140 990920 ADOCK 0 Q POR S
05i34224 RIT. t2-05
U.S. Nuclear Regulatory Commission
B17875\\Page 2 Attachments:
- 1. List of Regulatory Commitments
- 2. LER 99-011-00 cc:
H. J. Miller, Region 1 Administrator R. B. Eaton, NRC Senior Project Manager, Millstone Unit No. 2 D. P. Beaulieu, Senior Resident inspector, Millstone Unit No. 2 i
i l
Docket No. 50-336 B17875 Millstone Nuclear Power Station, Unit No. 2
Commitments
September 1999 l
l
.l
1 4
U.S. Nuclear Reguictory Commission B17875%ttachment 1\\Page 1 Regulatory Commitment Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document.
REGULATORY COMMITMENT COMMITTED DATE OR OUTAGE B17875.01: Guidance to the licensed operators Complete for maintaining the reactor thermal power below the licensed limit has been provided.
B17875.02: Operating procedures shall be October 29,1999 revised to incorporate new guidance on maintaining reactor thermal power below allowable limits.
B17875.03: Revised alarm setpoints for the October 1, '999 calorimetric calculated values on the plant process computer shall be investigated and appropriate corrective actions shall be implemented.
B17875.04: Training shall be provided to plant November 1,1999 operators on the changes made to procedures and alarm setpoints.
'g i
Docket No. 50-336 B17675 i
l Millstone Nuclear Power Station, Unit No. 2 LER 99-011-00
=
i I
i l
September 1999