A-1 APPENDIX A CHRONOLOGY This appendix contains a chronological listing of routine licensing correspondence between the U.S. Nuclear Regulatory Commission (NRC) staff and Duke Energy Corporation (Duke). This appendix also contains other correspondence regarding the NRC staffs review of the McGuire Nuclear Station, Units 1 and 2, (under docket Nos. 50-369 and 50-370), and Catawba Nuclear Station, Units 1 and 2, (under docket Nos. 50-413 and 50-414).
May 8, 2001 In a letter (signed by S. Hoffman), the NRC issued a notice for a public meeting on May 21, 2001. In this meeting, Duke planned to discuss schedules for planned license renewals for McGuire and Catawba Nuclear Stations. ACN: ML011290008 June 5, 2001 In a letter (signed by C. Araguas), the NRC issued a notice for a public meeting on June 20, 2001, between the NRC, Duke, Virginia Electric Power Company (VEPCo), and Exelon. In this meeting, the licensees planned to continue discussions from a prior meeting on May 21, 2001, on the review schedules for their planned license renewal applications.
ACN: ML011560744 June 6, 2001 In a letter (signed by S. Hoffman), the NRC published a summary of a public meeting that was held on May 21, 2001, between the NRC, Duke, VEPCo, and Exelon regarding the review schedules for their planned license renewal applications. ACN: ML011590263 June 7, 2001 In a letter (signed by R. Prato), the summary of a telecommunication between the NRC, VEPCo, and Duke was published and documented.
The telecommunication was held on June 6, 2001. Duke discussed an integrated inspection schedule for the license renewal inspection activities planned for McGuire and Catawba Nuclear Stations.
ACN: ML011590499 June 13, 2001 In a letter (signed by M.S. Tuckman), Duke submitted its form and content of License Renewal Application (LRA) and Appendices for McGuire and Catawba Nuclear Stations, Units 1 and 2. ACN:
ML011660301 June 13, 2001 In a letter (signed by M.S. Tuckman), Duke submitted its intent to apply for renewal of the operating licenses of McGuire and Catawba power stations. In its submittal, Duke provided fourteen copies of the application. ACN: ML011660138 June 13, 2001 In a letter (signed by M.S. Tuckman), Duke submitted two sets of marked flow drawings to aid the NRC in its review of Application to Renew the Operating Licenses of McGuire Nuclear Station, Units 1 and 2 and Catawba Nuclear Station, Units 1 and 2. ACN: ML011660168
A-2 June 28, 2001 In a letter (signed by M.S. Tuckman), Duke submitted its applications to renew the operating licenses of McGuire and Catawba power stations. In its submittal, Duke provided one hard copy of the applications and 40 copies of the applications on CD ROM. ACN: ML011840032 June 28, 2001 In a letter (signed by R. Franovich), the NRC issued a notice for a public meeting on July 12, 2001. In this meeting, Duke planned to provide the NRC staff with a review of the license renewal applications for McGuire and Catawba Nuclear Stations, and to clarify the organization of the license renewal applications. ACN: ML011800037 July 10, 2001 In a letter (signed by R. Franovich), the NRC published a summary of a public meeting that was held on June 20, 2001, between the NRC, Duke, VEPCo, and Exelon. This meeting was held to continue discussions from the prior meeting on May 21, 2001, on the review schedules for their planned license renewal applications. ACN: L011930405 July 24, 2001 In a letter (signed by R. Franovich), the summary of a telecommunication between the staff and Duke was published and documented. The telecommunication was held on July 19, 2001, to clarify technical information provided by Duke in LRA Table 3.2-4. ACN: ML012070063 July 26, 2001 In a letter (signed by R. Franovich), the NRC published a summary of a public meeting that was held on July 12, 2001, between the NRC and Duke to provide an orientation for the staff on the McGuire and Catawba LRA. ACN: ML012080051 August 31, 2001 In a letter (signed by S. Hoffman), the NRC issued a notice for a public meeting on September 19, 2001, between the NRC, the Nuclear Energy Institute (the NEI), Southern Nuclear Oporation Company (SNC), Hatch Nuclear Plant, Units 1 and 2 (HNP), Florida Power and Light Company (FPL), Duke, VEPCo, and Exelon. In this meeting, the licensees planned to discuss the review status of their LRAs. ACN: ML012430275 September 10, 2001 In a letter (signed by R. Franovich), the summary of a telecommunication between the staff and Duke was published and documented. The telecommunication was held on August 21, 2001, to clarify information provided by Duke on the Boraflex Monitoring Program in LRA Appendix B. ACN: ML012530283 October 3, 2001 In a letter (signed by R. Franovich), the NRC issued a notice for a public meeting on October 18, 2001, between the NRC and Duke to discuss a scoping methodology audit in support of license renewal application review for McGuire and Catawba Nuclear Stations, Units 1 and 2.
ACN: ML012770008
A-3 October 10, 2001 In a letter (signed by R. Franovich), the summary of a telecommunication between the staff and Duke was published and documented. The telecommunication was held on September 12, 2001, to clarify information provided by Duke in its LRA on several waste treatment and disposal systems. ACN: ML012830102 October 15, 2001 In a letter (signed by R. Franovich), the summary of two telecommunications between the staff and Duke was published and documented. These telecommunications were held on September 18 and 20, 2001, to clarify information provided by Duke in its McGuire and Catawba LRA regarding scoping of structures and components in the fire protection systems. ACN: ML012880370 October 21, 2001 In a letter (signed by S. Hoffman), the NRC issued a summary of a public meeting that was held on September 19, 2001, between the NRC, the NEI, SNC, FPL, VEPCo, Duke, and Exelon regarding the status of license renewal activities. ACN: ML012840369 November 2, 2001 In a letter (signed by R. Franovich), the summary of a telecommunication between the staff and Duke was published and documented. The telecommunication was held on October 3, 2001, to clarify information provided by Duke in its McGuire and Catawba LRA regarding scoping of structures and components in the fire protection systems.
ACN: ML013060438 November 14, 2001 In a letter (signed by R. Franovich), the summary of a telecommunication between the staff and Duke was published and documented. The telecommunication was held on October 11, 2001, to clarify information provided by Duke in its McGuire and Catawba LRA regarding containment systems. ACN: ML013190029 November 14, 2001 In a letter (signed by C. Grimes), the NRC provided the NEI, the Union of Concerned Scientists (the UCS), and current license renewal applicants with their proposed staff guidance on station blackout scoping for comments. ACN: ML013180508 November 15, 2001 In a letter (signed by R. Franovich), the NRC issued a summary of a public exit meeting that was held on October 19, 2001, between the NRC and Duke regarding the scoping methodology audit in support of license renewal application review for McGuire and Catawba Nuclear Stations, Units 1 and 2. ACN: ML013190507 November 23, 2001 In a letter (signed by R. Franovich), the summary of a telecommunication between the staff and Duke was published and documented. The telecommunication was held on October 11, 2001, to clarify information presented in the LRA pertaining to aging management programs for structures. ACN: ML013310117
A-4 November 23, 2001 In a letter (signed by C. Grimes), the NRC provided the NEI, the UCS, and current license renewal applicants with proposed changes to the Generic Aging Lessons Learned (GALL) report for comments on the aging management of concrete. ACN: ML013300426 November 23, 2001 In a letter (signed by R. Franovich), the summary of a telecommunication between the staff and Duke was published and documented. The telecommunication was held on October 15, 2001, to clarify information presented by Duke in its McGuire and Catawba LRA, Appendix B, Inservice Inspection Plan. ACN: ML013300361 November 30, 2001 In a letter (signed by R. Franovich), the summary of a telecommunication between the staff and Duke was published and documented. The telecommunication was held on October 25, 2001, to clarify information presented by Duke in its McGuire and Catawba LRA, Section 3.5. ACN:
ML013370544 November 30, 2001 In a letter (signed by R. Prato), the NRC issued a notice for a public meeting on December 12, 2001, between the NRC, VEPCo, Duke, Exelon, and the NEI to discuss license renewal emerging issues.
ACN: ML013370001 December 3, 2001 In a letter (signed by C. Grimes), the NRC provided the NEI, the UCS, and current license renewal applicants with the staffs characterization of the license renewal issue pertaining to scoping of seismic II/I piping for comments. ACN: ML013380013 December 11, 2001 In a letter (signed by R. Franovich), the summary of a telecommunication between the staff and Duke was published and documented. The telecommunication was held on October 30, 2001, to clarify information presented in the LRA pertaining to aging management programs for mechanical systems and components. ACN: ML013460154 December 11, 2001 In a letter (signed by R. Franovich), the summary of a telecommunication between the staff and Duke was published and documented. The telecommunication was held on November 8, 2001, to clarify information presented by Duke in its McGuire and Catawba LRA, Section B.3.12, Fire Protection Program. ACN: ML013460269 December 12, 2001 In a letter (signed by R. Franovich), the summary of a telecommunication between the staff and Duke was published and documented. The telecommunication was held on October 25, 2001, to clarify information presented by Duke in its McGuire and Catawba LRA, Appendix B.
ACN: ML013460417
A-5 December 13, 2001 In a letter (signed by R. Franovich), the summary of a telecommunication between the staff and Duke was published and documented. The telecommunication was held on November 5, 2001, to clarify information presented by Duke in its McGuire and Catawba LRA, Appendix B, on aging management programs for mechanical systems and components.
ACN: ML013470364 December 14, 2001 In a letter (signed by R. Franovich), the summary of a telecommunication between the staff and Duke was published and documented. The telecommunication was held on December 3, 2001, to clarify information presented by Duke on its McGuire and Catawba LRA, Section B.3.6.
ACN: ML013520129 December 14, 2001 In a letter (signed by S. Hoffman), the NRC issued a notice for a public meeting on January 8, 2002, between the NRC, SNC, FPL, VEPCo, Duke, and Exelon to discuss the review status and other activities associated with LRAs. ACN: ML013510294 December 18, 2001 In a letter (signed by R. Prato), the NRC issued a notice for a public meeting on January 10, 2002, between the NRC, VEPCo, Duke, Exelon, and the NEI to discuss license renewal station blackout issues.
ACN: ML013600335 December 27, 2001 In a letter (signed by R. Franovich), the summary of a telecommunication between the staff and Duke was published and documented. The telecommunication was held on November 13, 2001, to clarify information presented by Duke in its McGuire and Catawba LRA, Sections 2.5, 3.6, and B.3.19. ACN: ML013650428 January 10, 2002 In a letter (signed by R. Franovich), the summary of a telecommunication between the staff and Duke was published and documented. The telecommunication was held on November 20, 2001, to clarify information presented by Duke in its McGuire and Catawba LRA, Section 4.6.
ACN: ML020110099 January 11, 2002 In a letter (signed by D. Solorio), the NRC issued a notice for a public meeting on January 15, 2002, during which the NEI and current license renewal applicants planned to follow up on the January 10, 2002, meeting regarding the license renewal station blackout issue.
ACN: ML020110589 January 15, 2002 In a letter (signed by R. Franovich), the summary of a telecommunication between the staff and Duke was published and documented. The telecommunication was held on November 28, 2001, to clarify information presented by Duke in its McGuire and Catawba LRA, Sections 2.3.2 and 2.3.3. ACN: ML020170132
A-6 January 15, 2002 In a letter (signed by R. Franovich), the summary of a telecommunication between the staff and Duke was published and documented. The telecommunication was held on November 27, 2001, to clarify information presented by Duke in its McGuire and Catawba LRA, Sections 2.3.4, 2.3.3.27, 2.3.3.34, and 2.3.3.36. ACN: ML020160418 January 17, 2002 In a letter (signed by R. Franovich), the NRC staff requested additional information (RAI) regarding Sections 2.5, 3.6, and B.3.19 of the McGuire and Catawba LRA. ACN: ML020180061 January 17, 2002 In a letter (signed by R. Franovich), the NRC staff requested additional information (RAI) regarding Sections 2.1 and B.2 of the McGuire and Catawba LRA. ACN: ML020220034 January 17, 2002 In a letter (signed by P. Kang), the NRC issued a notice for a public meeting on February 14, 2002, between the NRC, the NEI, and current license renewal applicants to discuss revised sections of Chapters II and III of the GALL report on aging management of concrete elements.
ACN: ML020220005 January 17, 2002 In a letter (signed by R. Prato), the NRC issued a summary of a public meeting that was held on December 12, 2001, between the NRC, VEPCo, Duke, Exelon, and the NEI regarding license renewal emerging issues. ACN: ML020300004 January 22, 2002 In a letter (signed by R. Prato), the NRC published a summary of a public meeting that was held on January 10, 2002, between the NRC, VEPCo, Duke, Exelon, the NEI, and the Nuclear Information and Resource Service regarding the scope of station blackout specific to license renewal. ACN: ML020220351 January 23, 2002 In a letter (signed by R. Franovich), the NRC staff requested additional information (RAI) regarding Section 2.2 of the McGuire and Catawba LRA. ACN: ML020290102 January 23, 2002 In a letter (signed by R. Franovich), the NRC staff requested additional information (RAI) regarding Section 2.3.2 of the McGuire and Catawba LRA. ACN: ML020240249 January 24, 2002 In a letter (signed by R. Franovich), the NRC staff requested additional information (RAI) regarding Section 3.3 of the McGuire and Catawba LRA. ACN: ML020240265 January 28, 2002 In a letter (signed by R. Franovich), the NRC staff requested additional information (RAI) regarding Section 2.3.3 of the McGuire and Catawba LRA. ACN: ML020320212
A-7 January 28, 2002 In a letter (signed by C. Grimes), the NRC provided the NEI, the UCS, and current license renewal applicants with their proposed guidance on aging management of fire protection systems comments. ACN:
ML020320437 January 28, 2002 In a letter (signed by C. Grimes), the NRC requested comments from the NEI, the UCS, and current license renewal applicants on the revised proposed guidance on station blackout scoping. ACN: ML020300294 January 28, 2002 In a letter (signed by R. Franovich), the NRC staff requested additional information (RAI) regarding Section 3.2 of the McGuire and Catawba LRA. ACN: ML020320010 January 28, 2002 In a letter (signed by R. Franovich), the NRC staff requested additional information (RAI) regarding Appendix B, Aging Management Programs (Mechanical Systems), of the McGuire and Catawba LRA. ACN:
ML020310200 January 28, 2002 In a letter (signed by R. Franovich), the NRC staff requested additional information (RAI) regarding Sections 2.3.1, 3.1, 4.2, 4.3, 4.7.1, and Appendix B of the McGuire and Catawba LRA. ACN: ML020310255 January 28, 2002 In a letter (signed by R. Franovich), the NRC staff requested additional information (RAI) regarding Sections 2.4, 3.5, 4.6, 4.7.3, and Appendix B of the McGuire and Catawba LRA. ACN: ML020320165 January 30, 2002 In a letter (signed by R. Franovich), the NRC staff requested additional information (RAI) regarding Section 3.1 and Appendix B, Section B.3.27 of the McGuire and Catawba LRA. ACN: ML020350542 January 31, 2002 In a letter (signed by P. Kang), the NRC issued a notice for a public meeting on February 14, 2002, between the NRC, the NEI, and current license renewal applicants in order to discuss station blackout issues related to license renewal. This meeting follows discussions initiated in a public meeting held on January 10 and 15, 2002. ACN: ML020320079 February 5, 2002 In a letter (signed by P. Kang), the NRC published a summary of a public meeting that was held on January 15, 2002, between the NRC, the NEI, and current license renewal applicants. This meeting was held to continue the discussion that began with the January 10, 2002, meeting on station blackout issues related to license renewal. ACN:
ML020380195 February 11, 2002 In a letter (signed by R. Franovich), the summary of a telecommunication between the staff and Duke was published and documented. The telecommunication was held on January 9, 2002, to clarify information presented by Duke in its McGuire and Catawba LRA, Sections 3.1, B.3.1, B.3.26, B.3.27, B.3.31, and 4.2.1. ACN: ML020420453
A-8 February 13, 2002 In a letter (signed by D. Solorio), the NRC published a notice for a public meeting on February 25, 2002, between the NRC, the NEI, and current license renewal applicants to discuss implementation details of the license renewal interim staff guidance process. ACN: ML020460082 February 21, 2002 In a letter (signed by S. Hoffman), the NRC published a summary of a public meeting that was held on January 8, 2002, between the NRC, SNC, FPL, VEPCo, Duke, and Exelon regarding the progress of license renewal application reviews. ACN: ML020560022 March 1, 2002 In a letter (signed by M.S. Tuckman), Duke submitted its response to the NRC staffs RAIs dated January 17 and 23, 2002, regarding the scoping and screening methodology of the McGuire and Catawba LRA. ACN:
ML020640428 March 1, 2002 In a letter (signed by M.S. Tuckman), Duke responded to RAIs on scoping and screening methodology and plant level scoping results.
ACN: ML020640428 March 1, 2002 In a letter (signed by C. Grimes), the NRC requested comments from the NEI, the UCS, and current license renewal applicants on the revised proposed guidance on station blackout scoping. ACN: ML020600100 March 6, 2002 In a letter (signed by R. Franovich), the summary of a telecommunication between the staff and Duke was published and documented. The telecommunication was held on February 21, 2002, to clarify information presented by Duke in its McGuire and Catawba LRA, Section 2.4.2.
ACN: ML020660073 March 7, 2002 In a letter (signed by P. Kang), the NRC published a summary of a public meeting that was held on February 14, 2002, between the NRC, the NEI, and current license renewal applicants regarding revised guidance on station blackout scoping. ACN: ML020700212 March 8, 2002 In a letter (signed by M.S. Tuckman), Duke submitted its response to the NRC staffs RAIs dated January 17, 2002, regarding Sections 2.5, 3.6, and Appendix B Section B.3.19 of the McGuire and Catawba LRA. ACN:
ML020740025 March 11, 2002 In a letter (signed by M.S. Tuckman), Duke submitted its response to the NRC staffs RAIs dated January 28, 2002, regarding Sections 2.4, 3.5, 4.6, 4.7.3, and Appendix B of the McGuire and Catawba LRA. ACN:
ML020770266 March 13, 2002 In a letter (signed by S. Hoffman), the NRC published a notice for a public meeting on April 8, 2002, between the NRC, the NEI, and current license renewal applicants to discuss the status of the renewal applications and generic license renewal activities. ACN: ML020720270
A-9 March 15, 2002 In a letter (signed by K. S. Canady), Duke submitted its response to the NRC staffs RAIs dated January 23 and 28, 2002, regarding aging management review of auxiliary systems and of engineered safety features, including aging management programs for mechanical systems for McGuire and Catawba LRA. ACN: ML020810451 March 15, 2002 In a letter (signed by C. Grimes), the NRC requested comments from the NEI, the UCS, and current license renewal applicants on the license renewal issue guidance pertaining to 10 CFR 54.4 (a)(2) Scoping. ACN:
ML020770026 March 22, 2002 In a letter (signed by P. Kang), the NRC published a notice for a public meeting on April 10, 2002, between the NRC, the NEI, and current license renewal applicants to discuss revised sections of Chapters II and III of the GALL report on the aging management of concrete elements and other currently emerging issues related to license renewal. ACN:
ML020840411 March 22, 2002 In a letter (signed by P. Kang), the NRC published a notice for a public meeting on April 10, 2002, between the NRC, the NEI, and current license renewal applicants to discuss the staff proposed guidance for aging management of fire protection systems in the GALL report. ACN:
ML020840444 April 1, 2002 In a letter (signed by D. Matthews), the NRC submitted a copy of the revised staff position on scoping station blackout equipment for license renewal and clarified the use of alternate ac power sources. ACN:
ML020920464 April 4, 2002 In a letter (signed by P. Kang), the NRC published a summary of a public meeting that was held on February 14, 2002, between the NRC, the NEI, and current license renewal applicants regarding revisions to GALL Chapters II and III. ACN: ML020940312 April 5, 2002 In a letter (signed by C. Grimes), the NRC informed the NEI and current license renewal applicants of its Staffs Response to Industrys Proposed Changes to GALL Chapters II and III on Aging Management of Concrete Elements. ACN: ML020980194 April 15, 2002 In a letter (signed by M.S. Tuckman), Duke submitted its response to the NRC staffs RAIs dated January 23 and 28, 2002, and March 1, 8, and 15, 2002, regarding Sections 2.1-2a, 2.1-2b, 2.3.1, 2.3.2, 2.3.3, 3.1, 3.2-1, 3.3-1, 3.3-2, 4.2, 4.3, 4.7.1, B.3.19-1, B.3.19-2, and several sections of Appendix B of the McGuire and Catawba LRA. ACN: ML021120015 April 22, 2002 In a letter (signed by P. Kang), the NRC published a summary of a public meeting that was held on April 10, 2002, between the NRC, the NEI, and current license renewal applicants regarding staff guidance on license renewal issues. ACN: ML021120407
A-10 April 22, 2002 In a letter (signed by N. Dudley), the NRC published a summary of a public meeting that was held on April 8, 2002, between the NRC, Omaha Public Power District (OPPD), FPL, VEPCo, Duke, and Exelon regarding the progress of license renewal application reviews. ACN:
ML021130114 May 5, 2002 In a letter (signed by V. McCree), the NRC sent Duke its scoping and screening inspection report. ACN: ML021280003 June 7, 2002 In a letter (signed by R. Franovich), the summary of a telecommunication between the staff and Duke was published and documented. The telecommunication was held on May 24, 2002, to clarify information provided by Duke in LRA Section 2.1. ACN: ML021620457 June 7, 2002 In a letter (signed by R. Franovich), the summary of a telecommunication between the staff and Duke was published and documented. The telecommunication was held on May 28, 2002, to clarify information provided by Duke in LRA Section 3.5. ACN: ML021700648 June 19, 2002 In a letter (signed by R. Franovich), the summary of a telecommunication between the staff and Duke was published and documented. The telecommunication was held on June 5, 2002, to clarify information provided by Duke in LRA Section B.3.26. ACN: ML021700621 June 19, 2002 In a letter (signed by R. Franovich), the summary of a telecommunication between the staff and Duke was published and documented. The telecommunication was held on June 4, 2002, to clarify information provided by Duke in LRA Section 4.3. ACN: ML021750433 June 24, 2002 In a letter (signed by R. Franovich), the summary of a telecommunication between the staff and Duke was published and documented. The telecommunication was held on May 29, 2002, to clarify information provided by Duke in LRA Sections 3.6 and B.3.19. ACN: ML021620496 June 25, 2002 In a letter (signed by M.S. Tuckman), Duke submitted Amendment I to the application to renew the facility operating licenses of McGuire and Catawba Nuclear Stations, Units 1 and 2. ACN: ML021840126 June 25, 2002 In a letter (signed by M.S. Tuckman), Duke submitted drawing MCFD 01 which is part of Amendment I to the application to renew the facility operating licenses of McGuire and Catawba Nuclear Stations, Units 1 and
- 2. ACN: ML021920158 June 26, 2002 In a letter (signed by M.S. Tuckman), Duke submitted its response to the NRC staffs RAIs dated January 17, 2002, regarding Sections 2.5-1 and 2.5-2 of the McGuire and Catawba LRA. ACN: ML021840103
A-11 June 26, 2002 In a letter (signed by R. Franovich), the NRC provided Duke potential safety evaluation report open items regarding the license renewal application for McGuire and Catawba Nuclear Stations, Units 1 and 2.
ACN: ML021770454 July 9, 2002 In a letter (signed by M.S. Tuckman), Duke submitted its response to the NRC staffs letter dated June 26, 2002, regarding 29 potential open items and 10 confirmatory items identified during the staffs preparation of its safety evaluation report on the McGuire and Catawba LRA. ACN:
ML021960467 August 29, 2002 In a letter (signed by R. Franovich), the NRC provided Duke a revised schedule for the review of the license renewal application for McGuire and Catawba Nuclear Stations, Units 1 and 2. ACN: ML022410304 September 4, 2002 In a letter (signed by R. Franovich), the NRC issued a notice for a public meeting on September 17-19, 2002, between the NRC and Duke. In this meeting the staff and applicant planned to discuss open and confirmatory items identified in the SER issued August 14, 2002. ACN:
ML022470378 September 6, 2002 In a letter (signed by R. Franovich), the NRC issued a notice for a public meeting on October 1, 2002, between the NRC and Duke. In this meeting the staff and applicant planned to discuss open items pertaining to scoping and screening of fire protection equipment that were identified in the SER issued August 14, 2002. ACN: ML022520227 September 9, 2002 In a letter (signed by L. Plisco for V. McCree), the NRC sent Duke its aging management review inspection report. ACN: ML022540009 September 12, 2002 In a letter (signed by R. Franovich), the NRC issued a notice for a public meeting on October 1, 2002, between the NRC and Duke. In this meeting the staff and applicant planned to discuss open items pertaining to scoping and screening of fire protection equipment that were identified in the SER issued August 14, 2002. ACN: ML022560227 September 13, 2002 In a letter (signed by R. Franovich), the NRC issued a request of revised time-limited aging analyses associated with reactor vessel neutron embrittlement for the staffs review of the license renewal application for McGuire 1. ACN:ML022590100 October 2, 2002 In a letter (signed by M.S. Tuckman), Duke submitted its interim response to the NRC staffs safety evaluation report with open items issued August 14, 2002, on the McGuire and Catawba LRA.
ACN:ML022830191
A-12 October 19, 2002 In a letter (signed by R. Franovich), the NRC issued a revised excerpt from the safety evaluation report with open items and request for additional information to complete the staffs review of the McGuire and Catawba LRA. ACN:ML022940260 October 28, 2002 In a letter (signed by M.S. Tuckman), Duke submitted its second response to the NRC staffs safety evaluation report with open items issued August 14, 2002, on the McGuire and Catawba LRA.
ACN:ML023090324 November 5, 2002 In a letter (signed by M.S. Tuckman), Duke submitted its response to the NRC staffs letter dated October 19, 2002, regarding a revised excerpt from the safety evaluation report with open items and request for additional information to complete the staffs review of the McGuire and Catawba LRA. ACN:ML023180047 November 7, 2002 In a letter (signed by R. Franovich), the NRC requested the applicant to address its treatment of fuse holders within the scope of license renewal as long-lived, passive components subject to an aging management review in the McGuire and Catawba LRA. ACN:ML023120413 November 13, 2002 In a letter (signed by P.T. Kuo), the NRC apprized the applicant of the status of the NRC staffs review of the McGuire and Catawba LRA and safety evaluation report open items that remained unresolved.
ACN:ML023170631 November 14, 2002 In a letter (signed by M.S. Tuckman), Duke submitted its response to the NRC staffs letter dated November 13, 2002, regarding safety evaluation report open items that remained unresolved. ACN:ML023300321 November 18, 2002 In a letter (signed by M.S. Tuckman), Duke submitted a supplemental response to the NRC staffs letter dated November 13, 2002, regarding safety evaluation report open items that remained unresolved.
ACN:ML023300288 November 18, 2002 In a letter (signed by R. Franovich), the NRC issued a summary of the public meetings held September 17-19, 2002, between the NRC and Duke. In this meeting the staff and applicant discussed open and confirmatory items identified in the SER issued August 14, 2002. ACN:
ML023220127 November 21, 2002 In a letter (signed by M.S. Tuckman), Duke submitted a third response to the NRC staffs letter dated November 13, 2002, regarding safety evaluation report open items that remained unresolved. ACN:
A-13 November 26, 2002 In a letter (signed by R. Franovich), the NRC issued a summary of the public meeting held October 1, 2002, between the NRC and Duke. In this meeting the staff and applicant discussed open items pertaining to scoping and screening of fire protection equipment that were identified in the SER issued August 14, 2002. ACN: ML023330429 December 16, 2002 In a letter (signed by M.S. Tuckman), Duke submitted revised FSAR supplements and a table of license renewal commitments. ACN:
B-1 APPENDIX B REFERENCES This appendix contains a listing of references used in the preparation of the Safety Evaluation Report prepared during the review of the license renewal application for McGuire 1 and 2, Docket Numbers 50-369 and 50-370, and Catawba 1 and 2, Docket Numbers 50-413 and 50-414.
American Concrete Institute (ACI)
ACI 349.3, Evaluation of Existing Nuclear Safety-Related Concrete Structures.
ACI 224.1, Causes, Evaluation, and Repairs of Cracks in Concrete Structures.
ACI 201, Guide for Making a Condition Survey of Concrete in Service.
American National Standards Institute (ANSI)
ANSI B30.2.0, Overhead and Gantry Cranes, Section 2-2, Safety Standards for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings, American National Standard.
ANSI B30.16, Overhead Hoists (Underhung), American National Standard.
American Society of Mechanical Engineers (ASME)
ASME Boiler and Pressure Vessel Code,Section III, Subsection NB, Class 1 Components.
ASME Boiler and Pressure Vessel Code,Section III, Subsection NG, Core Support Structures.
ASME Boiler and Pressure Vessel Code,Section III, Class 2 and 3 Piping Failures.
ASME Boiler and Pressure Vessel Code,Section III, Subsection ND, Class 3 Rules for Construction of Nuclear Power Plant Components.
ASME Boiler and Pressure Vessel Code,Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components, 1992 Edition.
ASME Boiler and Pressure Vessel Code,Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components, 1989 Edition.
ASME Boiler and Pressure Vessel Code,Section XI, Subsection IWB, Requirements for Class 1 Components of Light-Water Cooled Power Plants.
ASME Boiler and Pressure Vessel Code,Section XI, Subsection IWC, Requirements for Class 2 Components of Light-Water Cooled Power Plants.
B-2 ASME Boiler and Pressure Vessel Code,Section XI, Subsection IWE, Requirements for Class MC and Metallic Liners of Class CC Components of Light-Water Cooled Power Plants.
ASME Boiler and Pressure Vessel Code,Section XI, Subsection IWF, Requirements for Class 1, 2, 3, and MC Component Supports of Light Water Cooled Plants.
ASME Boiler and Pressure Vessel Code,Section XI, Appendix G, Fracture Toughness Criteria for Protection Against Failure.
ASME Boiler and Pressure Vessel Code, Code Case N-481, Alternative Examination Requirements for Cast Austenitic Pump Casings,Section XI, Division 1.
Department of Energy - National Laboratories Sandia Contractor Report SAND 96-0344, Aging Management Guideline for Commercial Nuclear Power Plants - Electrical Cable and Terminations, prepared by Ogden Environmental and Energy Services, Inc., September 1996.
SAND 93-7069, Aging Management Guideline for Commercial Nuclear Power Plants - Motor Control Centers, February 1994.
SAND 93-7027, Aging Management Guideline for Commercial Nuclear Power Plants - Electrical Switchgear, July 1993.
Duke Energy Corporation Correspondence Letter from W. R. McCollum (Duke) to the U.S. Nuclear Regulatory Commission Document Control Desk,... Response to NRC Bulletin 2001-01: Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles, August 28, 2001.
Reports McGuire Nuclear Station Updated Final Safety Analysis Report, issued April 13, 2001.
Catawba Nuclear Station Updated Final Safety Analysis Report, issued October 8, 2000.
Submittal Application to Renew the Operating Licenses of McGuire Nuclear Station, Units 1 and 2, and Catawba Nuclear Station, Units 1 and 2, dated June 13, 2001.
Technical Document Specifications DPS-1274.00-00-001, Revision 2, License Renewal Technical Information Development Guide, September 3, 2000.
B-3 CNS-1274.00-00-001, Revision 2, License Renewal Technical Information Development Guide, September 3, 2000.
MCS-1274.00-00-001, Revision 2, License Renewal Technical Information Development Guide, September 3, 2000.
CNS-1274.00-00-0002, Revision 5, Systems and Structures Scoping for License Renewal, Catawba Nuclear Station, Units 1 & 2, September 12, 2001.
MCS-1274.00-00-0002, Revision 5, Systems and Structures Scoping for License Renewal, McGuire Nuclear Station, Units 1 & 2, September 12, 2001.
CNS-1274.00-00-0003, Revision 1, Mechanical component Screening and Aging Management Review Methodology for License Renewal, Catawba Nuclear Station, Units 1 & 2, June 1, 2000.
MCS-1274.00-00-0003, Revision 1, Mechanical component Screening and Aging Management Review Methodology for License Renewal, McGuire Nuclear Station, Units 1 & 2, June 1, 2000.
CNS-1274-00-00-0006, Revision 1, Electrical Component Integrated Plant Assessment and Evaluation of Time-Limited Aging Analysis for License Renewal, Catawba Nuclear Station, Units 1 & 2, June 12, 2001.
MCS-1274-00-00-0006, Revision 1, Electrical Component Integrated Plant Assessment and Evaluation of Time-Limited Aging Analysis for License Renewal, McGuire Nuclear Station, Units 1 & 2, June 12, 2001.
CNS-1274.00-00-0007, Revision 1, Structures and Structural Components Screening and Aging Management Review for License Renewal, Catawba Nuclear Station, Units 1 & 2, June 8, 2001.
MCS-1274.00-00-0007, Revision 1, Structures and Structural Components Screening and Aging Management Review for License Renewal, McGuire Nuclear Station, Units 1 & 2, June 8, 2001.
CNS-1274.CF-00-0001, Revision 2, Feedwater System Component Screening and Aging Management Review for License Renewal, Catawba Nuclear Station, Units 1 & 2, April 23, 2001.
CNS-1274.NI-00-0001, Revision 2, Safety Injection System Component Screening and Aging Management Review for License Renewal, Catawba Nuclear Station, Units 1 & 2, April 19, 2001.
Electric Power Research Institute (EPRI) and Materials Reliability Program (MRP)
EPRI Report TR-105714, Volume 1, Revision 4, and Volume 2, Revision 4, PWR Primary Water Chemistry Guidelines, January 1999.
B-4 EPRI Report TR-102134, Revision 5, PWR Secondary Water Chemistry Guidelines, December 1999.
EPRI Report TR 107621, Revision 1, Steam Generator Examination Guidelines, September 1997.
EPRI Report NSAC-202L, Revision 2, Recommendations for an Effective Flow Accelerated Corrosion Program, December 1998.
EPRI Report TR-103834-P1-2, Effects of Moisture on the Life of Power Plant Cables, Part 1:
Medium-Voltage Cables, Part 2: Low-Voltage Cables, prepared by Ogden Environmental and Energy Services Company, Final Report, August 1994.
EPRI Report TR-10003057, License Renewal Electrical Handbook, November 2001.
EPRI Report TR-107396, Closed Cooling Water Chemistry Guidelines, October 1997.
EPRI Report TR-109619, Guideline for the Management of Adverse Localized Equipment Environment, June 1999.
EPRI Report TR-1003083, Materials Reliability Program Guidelines for Addressing Fatigue Environmental Effects in a License Renewal Application (MRP-47), October 2001.
MRP Topical Report TP-1001491, Part 2, PWR Materials Reliability Program Interim Alloy 600 Safety Assessment for U.S. Power Plants (MRP-44), May 2001.
Miscellaneous Shah, V.N. and P.E. MacDonald, editors, Aging and Life Extension of Major Light Water Reactor Components, Elsevier Science Publishers, 1993.
Nuclear Energy Institute (NEI)
NEI 95-10, Revision 2, Industry Guideline for Implementing the Requirements of 10 CFR Part 54 - The License Renewal Rule, August 2000.
NEI 95-10, Revision 3, Industry Guideline for Implementing the Requirements of 10 CFR Part 54 - The License Renewal Rule, March 2001.
NEI 97-06, Steam Generator Program Guidelines, 1997.
NEI 96-03, Industry Guideline for Monitoring Structures.
Nuclear Management and Resources Council (NUMARC)
NUMARC Report Number 87-00, Guidelines and Technical Bases for NUMARC Initiatives Addressing Station Blackout at Light Water Reactors, November 1987.
B-5 NUMARC Report Number 90-01, Pressurized Water Reactor Containment Structures License Renewal Industry Report, Revision 1, September 1991.
NUMARC Report Number 90-06, Class I Structures License Renewal Industry Report, Revision 1, December 1991.
US Nuclear Regulatory Commission (NRC)
Bulletins (BL)
BL 82-02, Degradation of Threaded Fasteners in the Reactor Coolant Pressure Boundary of PWR Plants, June 2, 1982.
BL 88-09, Thimble Tube Thinning in Westinghouse Reactors, July 26, 1988.
BL 88-11, Pressurizer Surge Line Thermal Stratification, December 20, 1988.
BL 2001-001, Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles, August 3, 2001.
BL 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity, March 18, 2002.
BL 2002-02, Reactor Pressure Vessel Head and Vessel Head Penetration Nozzle Inspection Programs, August 9, 2002.
Code of Federal Regulations (10 CFR) 10 CFR 50.36, Technical Specifications, U.S. Nuclear Regulatory Commission.
10 CFR 50.48, Fire Protection, U.S. Nuclear Regulatory Commission.
10 CFR 50.49, Environmental Qualification of Electric Equipment Important to Safety for Nuclear Power Plants, U.S. Nuclear Regulatory Commission.
10 CFR 50.55a, Codes and Standards, U.S. Nuclear Regulatory Commission.
10 CFR 50.61, Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events, U.S. Nuclear Regulatory Commission.
10 CFR 50.62, Requirements for Reduction of Risk from Anticipated Transients Without Scram (ATWS) Events for Light-Water-Cooled Nuclear Power Plants, U.S. Nuclear Regulatory Commission.
10 CFR 50.63, Loss of All Alternating Current Power, U.S. Nuclear Regulatory Commission.
10 CFR 50.90, Application for Amendment of License or Construction Permit, U.S. Nuclear Regulatory Commission.
B-6 10 CFR 50 Domestic Licensing of Production and Utilization Facilities, U.S. Nuclear Regulatory Commission.
10 CFR Part 50, Appendix G, Fracture Toughness Requirements, U.S. Nuclear Regulatory Commission.
10 CFR Part 50, Appendix H, Reactor Vessel Material Surveillance Program Requirements, U.S. Nuclear Regulatory Commission.
10 CFR Part 51, Environmental Protection Regulation for Domestic Licensing and Related Regulatory Functions, U.S. Nuclear Regulatory Commission.
10 CFR Part 54, Requirements for Renewal of Operating Licenses for Nuclear Power Plants, U.S. Nuclear Regulatory Commission.
10 CFR Part 100, Reactor Site Criteria, U.S. Nuclear Regulatory Commission.
10 CFR Part 100, Appendix A, Seismic and Geological Siting Criteria for Nuclear Power Plants, U.S. Nuclear Regulatory Commission.
29 CFR Chapter XVII, 1910.179, Overhead and Gantry Cranes, Occupational Safety and Health Administration.
Correspondence Letter from C.I. Grimes (NRC) to D.J. Walters (NEI), License Renewal Issue No. 98-0030, Thermal Aging Embrittlement of Cast Austenitic Stainless Steel Components, May 19, 2000.
Letter from W.T. Russell (NRC) to W. Rasin (NUMARC, [NEI]), Safety Evaluation for Potential Reactor Vessel Head Adaptor Tube Cracking, November 19, 1993.
Letter from C.I. Grimes (NRC) to D.J. Walters (NEI), License Renewal Issue No. 98-0012, Consumables, April 20, 1999.
Inspection Reports McGuire Nuclear Station - NRC Inspection Report No. 50-369/01-06, February 26, 2002.
McGuire and Catawba Nuclear Stations - NRC Inspection Report No. 50-369/02-05, 50-370/02-05, 50-413/02-05, and 50-414/02-05, May 6, 2002.
McGuire and Catawba Nuclear Stations - NRC Inspection Report No. 50-369/02-06, 50-370/02-06, 50-413/02-06, and 50-414/02-06, September 9, 2002.
National Fire Codes National Fire Protection Association (NFPA), Standard for Installation of Centrifugal Fire Pumps, June 1978.
B-7 National Fire Protection Association (NFPA), Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems, 1998.
Generic Letters (GL)
GL 88-05, Boric Acid Corrosion of Carbon Steel Reactor Pressure Boundary Components In PWR Plants, March 17, 1988.
GL 97-01, Degradation of Control Rod Drive Mechanism Nozzle and Other Vessel Closure Head Penetrations, April 1, 1997.
GL 97-06, Degradation of Steam Generator Internals, December 30, 1997.
GL 89-13, Service Water System Problems Affecting Safety-Related Equipment, July 18, 1989.
GL 96-04, Boraflex Degradation in Spent Fuel Pool Storage Racks, June 26, 1996.
Information Notices (IN)
IN 87-44, Thimble Tube Thinning in Westinghouse Reactors, September 16, 1987.
IN 2001-05, Through-Wall Circumferential Cracking of Reactor Pressure Vessel Head Control Rod Drive Mechanism Penetration Nozzles at Oconee Nuclear Station, Unit 3, April 30, 2001.
IN 87-49, Deficiencies in Outside Containment Flooding Protection, October 9, 1987.
IN 97-45, Supplement 1: Environmental Qualification Deficiency for Cables and Containment Penetration Pigtails, February 17, 1998.
Miscellaneous NRC Inspection Procedure 62002, Inspection of Structure, Passive Components, and Civil Engineering Features at Power Plants, December 1996.
NRC SECY 96-080, Issuance of Final Amendment to 10 CFR 50.55a to Incorporate by Reference the ASME Boiler and Pressure Vessel Code (ASME CODE),Section XI, Division 1, Subsection IWE and Subsection IWL, April 17, 1996.
Technical Reports NUREG/CR-0422, Operation of McGuire Nuclear Station Units 1 and 2, March 1978.
NUREG/CR-0422, Supplement 6, Safety Evaluation Report McGuire Nuclear Station Units 1 and 2, March 1983.
NUREG/CR-0933, Supplement 20, A Prioritization of Generic Safety Issues, July 1996.
NUREG/CR-0954, Supplement 2, Catawba Nuclear Station, Units 1 and 2, June 1984.
B-8 NUREG/CR-0954, Supplement 3, Catawba Nuclear Station, Units 1 and 2, July 1984.
NUREG/CR-1436, Supplement 8, Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding McGuire Nuclear Station, Units 1 and 2, May 2002.
NUREG/CR-1436, Supplement 9, Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Catawba Nuclear Station, Units 1 and 2, May 2002.
NUREG-1522, Assessment of In-Service Conditions of Safety-Related Nuclear Power Plant Structures.
NUREG/CR-1557, Summary of Technical Information and Agreements From Nuclear Management and Resources Council Industry Reports Addressing License Renewal, October 1996.
NUREG-1611, Aging Management of Nuclear Power Plant Containments for License Renewal, September 1997.
NUREG/CR-1723, Safety Evaluation Report Related to the License Renewal of Oconee Nuclear Station, Units 1, 2 and 3, March 2000.
NUREG/CR-1739, Analysis of Public Comment on the Improved License Renewal Guidance Documents, July 2001.
NUREG-1760, Aging Assessment of Safety-Related Fuses Used in Low-and Medium-Voltage Applications in Nuclear Power Plants, May 2002.
NUREG/CR-1800, Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants, July 2001.
NUREG/CR-1801, Generic Aging Lessons Learned (GALL) Report, July 2001.
NUREG/CR-4652, Report on Aging of Nuclear Power Plant Reinforced Concrete Structures.
NUREG/CR-4715, An Aging Assessment of Relay and Circuit Breakers and System Interactions, June 1987.
NUREG/CR-5576, Survey of Boric Acid Corrosion of Carbon Steel Components in Nuclear Plants, June 1990.
NUREG/CR-5704, Curves of Austenitic Stainless Steel, April 1999.
NUREG/CR-6048, Pressurized-Water Reactor Internals Aging Degradation Study, September 1993.
NUREG/CR-6177, Assessment of Thermal Embrittlement of Cast Stainless Steels.
NUREG/CR-6260, Application of NUREG/CR-5999 Interim Fatigue Curves to Selected Nuclear Power Plant Components, March 1995.
B-9 NUREG/CR-6424, Report on Aging of Nuclear Power Plant Reinforced Concrete Structures.
NUREG/CR-6583, Effects of LWR Coolant Environment on Fatigue Design Curves of Carbon and Low Alloy Steel, March 1998.
NUREG/CR-6679, Assessment of Age-Related Degradation of Structures and Passive Components for U.S. Nuclear Power Plants, August 2000.
NUREG/CR-6754, Review of Industry Responses to NRC Generic Letter 97-06 on Degradation of Steam Generator Internals, December 2001.
Regulatory Guides (RG)
RG 1.26, Quality Group Classifications and Standards for Water-, Steam-, and Radioactive-Waste-Containing Components of Nuclear Power Plants, Rev. 3, February 1976.
RG 1.29, Seismic Design Classification, Rev. 3, June 1984.
RG 1.43, Control of Stainless Steel Weld Cladding of Low-Alloy Steel Components, May 1973.
RG 1.44, Control of the Use of Sensitized Stainless Steel, May 1973.
RG 1.45, Reactor Coolant Pressure Boundary Leakage Detection Systems, May 1973.
RG 1.52, Design Testing and Maintenance Criteria for Post Accident Engineered-Safety-Feature Atmosphere Cleanup System Air Filtration and Adsorption Units of Light-Water-Cooled Nuclear Power Plants, July 1978.
RG 1.89, Environmental Qualification of Certain Electrical Equipment Important to Safety for Nuclear Power Plants, June 1984.
RG 1.99, Revision 2, Radiation Embrittlement of Reactor Pressure Vessel Materials, May 1988.
RG 1.127, Inspection of Water Control Structures Associated with Nuclear Power Plants, March 1978.
RG 1.147, Inservice Inspection Code Case Acceptability, ASME Section XI, Division 1, May 1999.
RG 1.155, Station Blackout, August 1988.
RG 1.160, Monitoring the Effectiveness of Maintenance at Nuclear Power Plants, Revision 2, March 1997.
RG 1.163, Performance-Based Containment Leak-Test Program, September 1995.
RG 1.188, Standard Format and Content for Applications to Renew Nuclear Power Plant Operating Licenses, July 2001.
B-10 RG 1.190, Calculational and Dosimetry Methods for Determining Pressure Vessel Neutron Fluence, March 2001.
Westinghouse Topical Reports (WCAP)
WCAP-10456, The Effects of Thermal Aging on Structural Integrity of Cast Stainless Steel Piping for Westinghouse Nuclear Steam Supply Systems, November 1983.
WCAP-10585, Technical Basis For Eliminating Large Primary Loop Pipe Rupture as the Structural Design Basis for McGuire Units 1 and 2, June 1984.
WCAP-10546, Technical Basis For Eliminating Large Primary Loop Pipe Rupture as the Structural Design Basis for Catawba Units 1 and 2, June 1984.
WCAP-12866, Bottom Mounted Instrumentation Flux Thimble Wear, 1991.
WCAP-14535A, Topical Report on Reactor Coolant Pump Flywheel Inspection Elimination, November 1996.
WCAP-14574, License Renewal Evaluation: Aging Management Evaluation for Pressurizers.
WCAP-14574-A, License Renewal Application: Aging Management Evaluation for Pressurizers, December 2000.
WCAP-14575-A, Aging Management Evaluation for Class 1 Piping and Associated Pressure Boundary Components, August 1996.
WCAP-14577, Revision 1-A, License Renewal Application: Aging Management Evaluation for Reactor Internals, March 2001.
WCAP-14901, Revision 0, Background and Methodology for Evaluation of Reactor Vessel Closure Head Penetration Integrity for the Westinghouse Owners Group, July 1997.
WCAP-15117, Analysis of Capsule V and the Dosimeters from Capsules U and X from the Duke Power Company Catawba Unit 1 Reactor Vessel Surveillance Program, October 1998.
WCAP-15243, Analysis of Capsule V and the Capsule Y Dosimeters from the Duke Energy Catawba Unit 2 Reactor Vessel Radiation Surveillance Program, September 1999.
WCAP-15253, Duke Power Company Reactor Cavity Neutron Measurement Program for William B. McGuire Unit 1 Cycle 12, July 1999.
WCAP-15334, Duke Power Company Reactor Cavity Neutron Measurement Program for William B. McGuire Unit 2 Cycle 12, November 1999.
C-1 APPENDIX C PRINCIPAL CONTRIBUTORS NAME RESPONSIBILITY C. Araguas Technical Support R. Architzel Plant Systems H. Ashar Structural Engineering G. Bagchi Technical Support S. Baily Technical Support A. Baltazar Technical Support N. Barnett Administrative Support E. Barnhill Administrative Support R. Barrett Management Supervision W. Bateman Management Supervision L. Bell Administrative Support S. Black Management Supervision B. Boger Management Supervision W. Burton Technical Support J. Calvo Management Supervision R. Caruso Management Supervision C. Casto Management Supervision P.Y. Chen Mechanical Engineering S. Chey Administrative Support S. Coffin Management Supervision B. Crowley Region II Inspector D. Cullison Plant Systems J. Cushing Technical Support J. Davis Materials Engineering W. Dean Management Supervision C. Dorsey Administrative Support N. Dudley Technical Support T. Eaton Plant Systems B. Elliot Reactor Systems R. Elliott Plant Systems J. Fair Mechanical Engineering R. Franovich Project Manager Z. Fu Technical Support G. Galletti Technical Support A. Gill Electrical Engineering G. Georgiev Structural Engineering F. Gillespie Management Supervision J. Golla Plant Systems C. Grimes Management Supervision J. Guo Plant Systems
C-2 J. Hannon Management Supervision M. Hartzman Technical Support G. Hatchett Plant Systems A. Henry Technical Support S. Hoffman Technical Support G. Holahan Management Supervision C. Holden Management Supervision C. Julian Region II Inspector P. Kang Technical Support M. Khanna Materials Engineering V. Klco Technical Support P. Kleene Technical Editing J. Knox Electrical Engineering S. Koenick Technical Support P.T. Kuo Management Supervision C. Lauron Structural Engineering J. Lazevnick Electrical Engineering A. Lee Management Supervision S. Lee Technical Support J. Lehning Technical Support C. Li Plant Systems Y. Li Technical Support L. Lund Management Supervision K. Manoly Management Supervision D. Matthews Management Supervision J. Medoff Materials Engineering L. Moore Region II Inspector C. Munson Structural Engineering J. Nakoski Management Supervision D. Nguyen Electrical Engineering D. Oudinot Plant Systems K. Parczewski Chemical Engineering J. Peralta Technical Support R. Prato Backup Project Manager T. Quay Management Supervision K. Rico Backup Project Manager J. Rajan Mechanical Engineering M. Razzaque Reactor Systems B. Rogers Technical Support S. Saba Electrical Engineering P. Shemanski Electrical Engineering S. Sheng Mechanical Engineering A. Smith Materials Engineering D. Solorio Technical Support J. Strosnider Management Supervision O. Tabatabai Backup Project Manager D. Thatcher Management Supervision B. Thomas Management Supervision J. Tsao Mechanical Engineering
C-3 P.K. VanDoorn Region II Inspector H. Walker Technical Support H. Wang Technical Support S. Weerakkody Management Supervision J. Wermiel Management Supervision A. Williamson Technical Support CONTRACTORS Contractor Technical Area Brookhaven National Laboratory Aging Management Reviews Pacific Northwest National Laboratory Aging Management Reviews
D-1 APPENDIX D LIST OF APPLICANT COMMITTMENTS