TSTF-497, Revision 0, Limit Inservice Testing Program SR 3.0.2 Application to Frequencies of 2 Years or Less
ML061930221
Person / Time
Issue date: 07/12/2006
From: Crowthers M, Infanger P, Sparkman W, Woods B
BWR Owners Group, PWR Owners Group, Technical Specifications Task Force
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
TSTF-06-14 TSTF-497, Rev 0, WOG-184, Rev 0
Download: ML061930221 (9)


Text

11921 Rockville Pike, Suite 100, Rockville, MD 20852 Phone: 301-984-4400, Fax: 301-984-7600 Email: tstf@excelservices.com Administered by EXCEL Services Corporation TECHNICAL SPECIFICATIONS TASK FORCE A JOINT OWNERS GROUP ACTIVITY TSTF July 12, 2006 TSTF-06-14 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

SUBJECT:

TSTF-497, Revision 0, "Limit Inservice Testing Program SR 3.0.2 Application to Frequencies of 2 Years or Less"

Dear Sir or Madam:

On December 2, 2004, the TSTF submitted to the NRC TSTF-479, Revision 0, "Changes to Reflect Revision of 10 CFR 50.55a." The proposed change revised the Inservice Testing Program located in Chapter 5 of the Improved Standard Technical Specifications (ISTS) to reflect the latest NRC-approved version of the ASME Code. In a letter dated December 6, 2005, the NRC approved TSTF-479 as an administrative change to the ISTS NUREGs. TSTF-479 was incorporated into Revision 3.1 of the ISTS NUREGs.

At the February 23, 2006 meeting between the TSTF and the NRC, the NRC stated that they did not agree with a portion of TSTF-479 and would not approve plant-specific amendments incorporating that portion of TSTF-479.

This Traveler is an administrative change to the ISTS NUREGs to reflect the revised NRC position. We recommend that this Traveler be incorporated into the next revision of the ISTS NUREGs in order for the Improved Standard Technical Specifications to be consistent with the plant-specific Technical Specifications being approved by the NRC.

Should you have any questions, please do not hesitate to contact us.

Wesley Sparkman (PWROG/W)

Michael Crowthers (BWROG)

Brian Woods (PWROG/CE)

Paul Infanger (PWROG/B&W)

Enclosure cc:

Tim Kobetz, Technical Specifications Section, NRC David E. Roth, Technical Specifications Section, NRC

TSTF-497, Rev. 0 WOG-184, Rev. 0 NUREGs Affected:

Limit Inservice Testing Program SR 3.0.2 Application to Frequencies of 2 Years or Less Technical Specification Task Force Improved Standard Technical Specifications Change Traveler 1430 1431 1432 1433 1434 Classification: 1) Technical Change Recommended for CLIIP?:

Industry

Contact:

Wes Sparkman, (205) 992-5061, wasparkm@southernco.com No Correction or Improvement:

Correction NRC Fee Status:

Benefit:

Increase Consistency with Standard or Writer's 1.0 Description This Traveler is an administrative change to the ISTS NUREGs to revise paragraph b of the Inservice Testing Program in the ISTS to state, "The provisions of SR 3.0.2 are applicable to the above required Frequencies and to other normal and accelerated Frequencies specified as 2 years or less in the Inservice Testing Program for performing inservice testing activities."

2.0 Proposed Change NUREG-1430, 1431, and 1432, Specification 5.5.8, and NUREG-1433 and 1434, Specification 5.5.7, both titled "Inservice Testing Proram," paragraph b is revised from:

"The provisions of SR 3.0.2 are applicable to the above required Frequencies and other normal and accelerated Frequencies specified in the Inservice Testing Program for performing inservice testing activities."

to "The provisions of SR 3.0.2 are applicable to the above required Frequencies and to other normal and accelerated Frequencies specified as 2 years or less in the Inservice Testing Program for performing inservice testing activities."

The changes are underlined.

12-Jul-06 Traveler Rev. 3. Copyright (C) 2006, EXCEL Services Corporation. Use by EXCEL Services associates, utility clients, and the U.S. Nuclear Regulatory Commission is granted. All other use without written permission is prohibited.

TSTF-497, Rev. 0 WOG-184, Rev. 0 3.0 Background On December 2, 2004, the TSTF submitted to the NRC TSTF-479, Revision 0, "Changes to Reflect Revision of 10 CFR 50.55a." The proposed change revised the Inservice Testing Program located in Chapter 5 of the ISTS to reflect the latest NRC-approved version of the ASME Code. TSTF-479 also revised paragraph b of the Inservice Testing Program to state, "The provisions of SR 3.0.2 are applicable to the above required Frequencies and other normal and accelerated Frequencies specified in the Inservice Testing Program for performing inservice testing activities."

In a letter dated December 6, 2005, the NRC approved TSTF-479 as an administrative change to the ISTS NUREGs. TSTF-479 was incorporated into Revision 3.1 of the ISTS NUREGs.

At the February 23, 2006 meeting between the NRC and the TSTF, members of the Component Branch of the NRC stated that TSTF-479 did not provide an adequate justification for applying SR 3.0.2 to Frequencies specified in the Inservice Testing Program as greater than 2 years and the NRC would not approve plant-specific amendments based on TSTF-479 incorporating this change without further justification. The NRC stated that they would accept applying SR 3.0.2 to IST Frequencies not listed in the Inservice Testing Program table provided that those Frequencies are specified in the Inservice Testing Program as 2 years or less.

This Traveler is an administrative change to the ISTS NUREGs to reflect the NRC position. It revises paragraph b of the Inservice Testing Program in the ISTS to state, "The provisions of SR 3.0.2 are applicable to the above required Frequencies and to other normal and accelerated Frequencies specified as 2 years or less in the Inservice Testing Program for performing inservice testing activities."

4.0 Technical Analysis At the February 23, 2006 meeting between the NRC and the TSTF, members of the Component Branch of the NRC stated that TSTF-479 did not provide an adequate justification for applying SR 3.0.2 to Frequencies specified in the Inservice Testing Program as greater than 2 years and the NRC would not approve plant-specific amendments based on TSTF-479 incorporating this change without further justification. After consideration, the TSTF declined to develop a technical justification for applying SR 3.0.2 to IST Frequencies specified as greater than 2 years at this time due to inadequate cost benefit.

Therefore, this Traveler is an administrative change to the ISTS NUREGs which modifies the Inservice Testing Program, paragraph b, to remove the provisions that were not deemed by the NRC to be adequately justified in TSTF-479.

5.0 Regulatory Analysis This Traveler is considered an administrative change to the ISTS NUREGs. Therefore, a regulatory analysis is not provided.

12-Jul-06 Traveler Rev. 3. Copyright (C) 2006, EXCEL Services Corporation. Use by EXCEL Services associates, utility clients, and the U.S. Nuclear Regulatory Commission is granted. All other use without written permission is prohibited.

TSTF-497, Rev. 0 WOG-184, Rev. 0 6.0 Environmental Consideration This Traveler is considered an administrative change to the ISTS NUREGs. Therefore, an environmental consideration is not provided.

7.0 References 1.

TSTF Letter 04-15, "TSTF-479, Revision 0, 'Changes to Reflect Revision of 10 CFR 50.55a',"

dated December 2, 2004.

2.

Letter from Thomas H. Boyce (NRC) to Technical Specification Task Force, "Status of TSTF 343, 479, 482, 485," dated December 6, 2005.

Revision History Affected Technical Specifications OG Revision 0 Revision Status: Active Original Issue Revision

Description:

Revision Proposed by:

TSTF TSTF Review Information TSTF Received Date:

07-Jul-06 Date Distributed for Review 07-Jul-06 TSTF Comments:

(No Comments)

Date: 12-Jul-06 TSTF Resolution:

Approved OG Review Completed:

BWOG CEOG WOG BWROG NRC Review Information NRC Received Date:

12-Jul-06 5.5.8 NUREG(s)- 1430 1431 1432 Only Inservice Testing Program 5.5.7 NUREG(s)- 1433 1434 Only Inservice Testing Program 12-Jul-06 Traveler Rev. 3. Copyright (C) 2006, EXCEL Services Corporation. Use by EXCEL Services associates, utility clients, and the U.S. Nuclear Regulatory Commission is granted. All other use without written permission is prohibited.

Programs and Manuals 5.5 BWOG STS 5.5-5 Rev. 3.1, 12/01/05 5.5 Programs and Manuals 5.5.8 Inservice Testing Program (continued)

ASME OM Code and applicable Addenda terminology for inservice testing activities Required Frequencies for performing inservice testing activities Weekly At least once per 7 days Monthly At least once per 31 days Quarterly or every 3 months At least once per 92 days Semiannually or every 6 months At least once per 184 days Every 9 months At least once per 276 days Yearly or annually At least once per 366 days Biennially or every 2 years At least once per 731 days

b.

The provisions of SR 3.0.2 are applicable to the above required Frequencies and to other normal and accelerated Frequencies specified as 2 years or less in the Inservice Testing Program for performing inservice testing activities,

c.

The provisions of SR 3.0.3 are applicable to inservice testing activities, and

d.

Nothing in the ASME OM Code shall be construed to supersede the requirements of any TS.

5.5.9 Steam Generator (SG) Program A Steam Generator Program shall be established and implemented to ensure that SG tube integrity is maintained. In addition, the Steam Generator Program shall include the following provisions:

a.

Provisions for condition monitoring assessments. Condition monitoring assessment means an evaluation of the "as found" condition of the tubing with respect to the performance criteria for structural integrity and accident induced leakage. The "as found" condition refers to the condition of the tubing during an SG inspection outage, as determined from the inservice inspection results or by other means, prior to the plugging [or repair] of tubes. Condition monitoring assessments shall be conducted during each outage during which the SG tubes are inspected, plugged, [or repaired] to confirm that the performance criteria are being met.

TSTF-497, Rev. 0

Programs and Manuals 5.5 WOG STS 5.5-5 Rev. 3.1, 12/01/05 5.5 Programs and Manuals 5.5.7 Reactor Coolant Pump Flywheel Inspection Program (continued)


REVIEWER'S NOTE----------------------------------------

The inspection interval and scope for RCP flywheels stated above can be applied to plants that satisfy the requirements in WCAP-15666, "Extension of Reactor Coolant Pump Motor Flywheel Examination."

5.5.8 Inservice Testing Program This program provides controls for inservice testing of ASME Code Class 1, 2, and 3 components. The program shall include the following:

a.

Testing frequencies applicable to the ASME Code for Operations and Maintenance of Nuclear Power Plants (ASME OM Code) and applicable Addenda as follows:

ASME OM Code and applicable Addenda terminology for inservice testing activities Required Frequencies for performing inservice testing activities Weekly At least once per 7 days Monthly At least once per 31 days Quarterly or every 3 months At least once per 92 days Semiannually or every 6 months At least once per 184 days Every 9 months At least once per 276 days Yearly or annually At least once per 366 days Biennially or every 2 years At least once per 731 days

b.

The provisions of SR 3.0.2 are applicable to the above required Frequencies and to other normal and accelerated Frequencies specified as 2 years or less in the Inservice Testing Program for performing inservice testing activities,

c.

The provisions of SR 3.0.3 are applicable to inservice testing activities, and

d.

Nothing in the ASME OM Code shall be construed to supersede the requirements of any TS.

TSTF-497, Rev. 0

Programs and Manuals 5.5 CEOG STS 5.5-5 Rev. 3.1, 12/01/05 5.5 Programs and Manuals 5.5.8 Inservice Testing Program (continued)

ASME OM Code and applicable Addenda terminology for inservice testing activities Required Frequencies for performing inservice testing activities Weekly At least once per 7 days Monthly At least once per 31 days Quarterly or every 3 months At least once per 92 days Semiannually or every 6 months At least once per 184 days Every 9 months At least once per 276 days Yearly or annually At least once per 366 days Biennially or every 2 years At least once per 731 days

b.

The provisions of SR 3.0.2 are applicable to the above required Frequencies and to other normal and accelerated Frequencies specified as 2 years or less in the Inservice Testing Program for performing inservice testing activities,

c.

The provisions of SR 3.0.3 are applicable to inservice testing activities, and

d.

Nothing in the ASME OM Code shall be construed to supersede the requirements of any TS.

5.5.9 Steam Generator (SG) Program A Steam Generator Program shall be established and implemented to ensure that SG tube integrity is maintained. In addition, the Steam Generator Program shall include the following provisions:

a.

Provisions for condition monitoring assessments. Condition monitoring assessment means an evaluation of the "as found" condition of the tubing with respect to the performance criteria for structural integrity and accident induced leakage. The "as found" condition refers to the condition of the tubing during an SG inspection outage, as determined from the inservice inspection results or by other means, prior to the plugging [or repair] of tubes. Condition monitoring assessments shall be conducted during each outage during which the SG tubes are inspected, plugged, [or repaired] to confirm that the performance criteria are being met.

b.

Performance criteria for SG tube integrity. SG tube integrity shall be maintained by meeting the performance criteria for tube structural integrity, accident induced leakage, and operational LEAKAGE.

TSTF-497, Rev. 0

Programs and Manuals 5.5 BWR/4 STS 5.5-5 Rev. 3.1, 12/01/05 5.5 Programs and Manuals 5.5.7 Inservice Testing Program (continued)

a.

Testing frequencies applicable to the ASME Code for Operations and Maintenance of Nuclear Power Plans (ASME OM Code) and applicable Addenda as follows:

ASME OM Code and applicable Addenda terminology for inservice testing activities Required Frequencies for performing inservice testing activities Weekly At least once per 7 days Monthly At least once per 31 days Quarterly or every 3 months At least once per 92 days Semiannually or every 6 months At least once per 184 days Every 9 months At least once per 276 days Yearly or annually At least once per 366 days Biennially or every 2 years At least once per 731 days

b.

The provisions of SR 3.0.2 are applicable to the above required Frequencies and to other normal and accelerated Frequencies specified as 2 years or less in the Inservice Testing Program for performing inservice testing activities,

c.

The provisions of SR 3.0.3 are applicable to inservice testing activities, and

d.

Nothing in the ASME OM Code shall be construed to supersede the requirements of any TS.

5.5.8 Ventilation Filter Testing Program (VFTP)

A program shall be established to implement the following required testing of Engineered Safety Feature (ESF) filter ventilation systems at the frequencies specified in [Regulatory Guide ], and in accordance with [Regulatory Guide 1.52, Revision 2, ASME N510-1989, and AG-1].

a.

Demonstrate for each of the ESF systems that an inplace test of the high efficiency particulate air (HEPA) filters shows a penetration and system bypass < [0.05]% when tested in accordance with [Regulatory Guide 1.52, Revision 2, and ASME N510-1989] at the system flowrate specified below

[+/- 10%].

ESF Ventilation System Flowrate

[ ]

[ ]

TSTF-497, Rev. 0

Programs and Manuals 5.5 BWR/6 STS 5.5-5 Rev. 3.1, 12/01/05 5.5 Programs and Manuals 5.5.7 Inservice Testing Program (continued)

ASME OM Code and applicable Addenda terminology for inservice testing activities Required Frequencies for performing inservice testing activities Weekly At least once per 7 days Monthly At least once per 31 days Quarterly or every 3 months At least once per 92 days Semiannually or every 6 months At least once per 184 days Every 9 months At least once per 276 days Yearly or annually At least once per 366 days Biennially or every 2 years At least once per 731 days

b.

The provisions of SR 3.0.2 are applicable to the above required Frequencies and to other normal and accelerated Frequencies specified as 2 years or less in the Inservice Testing Program for performing inservice testing activities,

c.

The provisions of SR 3.0.3 are applicable to inservice testing activities, and

d.

Nothing in the ASME OM Code shall be construed to supersede the requirements of any TS.

5.5.8 Ventilation Filter Testing Program (VFTP)

A program shall be established to implement the following required testing of Engineered Safety Feature (ESF) filter ventilation systems at the frequencies specified in [Regulatory Guide ], and in accordance with [Regulatory Guide 1.52, Revision 2; ASME N510-1989; and AG-1].

a.

Demonstrate for each of the ESF systems that an inplace test of the high efficiency particulate air (HEPA) filters shows a penetration and system bypass < [0.05]% when tested in accordance with [Regulatory Guide 1.52, Revision 2, and ASME N510-1989] at the system flowrate specified below

[+/- 10%]:

ESF Ventilation System Flowrate

[ ]

[ ]

b.

Demonstrate for each of the ESF systems that an inplace test of the charcoal adsorber shows a penetration and system bypass < [0.05]% when tested in accordance with [Regulatory Guide 1.52, Revision 2, and ASME N510-1989] at the system flowrate specified below [+/- 10%]:

TSTF-497, Rev. 0