Enclosure(s) transmitted herewith contain(s) SUNSI. When separated from enclosure(s), this
transmittal document is decontrolled.
LIMITED INTERNAL
DISTRIBUTION PERMITTED
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
SAM NUNN ATLANTA FEDERAL CENTER
61 FORSYTH STREET, SW, SUITE 23T85
ATLANTA, GEORGIA 30303-8931
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
July 3, 2008
Carolina Power and Light Company
ATTN: Mr. Robert J. Duncan, II
Vice President - Harris Plant
Shearon Harris Nuclear Power Plant
P. O. Box 165, Mail Code: Zone 1
New Hill, North Carolina 27562-0165
SUBJECT:
NRC OFFICE OF INVESTIGATION REPORT 2-2007-031, HARRIS NUCLEAR
PLANT INSPECTION REPORT 05000400/2008402, AND NOTICE OF
VIOLATION
Dear Mr. Duncan:
This refers to the investigation completed on March 10, 2008, at Shearon Harris Nuclear Power
Plant. The purpose of the investigation was to review the facts and circumstances associated
with a security related issue. The results of the investigation were discussed on July 3, 2008
with Mr. D. Corlett and other members of your staff.
Based on the results of the investigation, the NRC has determined that a Severity Level IV
violation of NRC requirements occurred. The violation was evaluated in accordance with the
NRC Enforcement Policy. The current Enforcement Policy is located on the NRC=s Web site at
http://www.nrc.gov/about-nrc/regulatory/enforcement/enforce-pol.html. The violation is
documented in the enclosed Notice of Violation (Notice). For administrative purposes, this letter
is issued as Inspection Report 05000400/2008402, and the NOV is designated as05000400/2008402-01.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS
is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public
Electronic Reading Room). However, because of the security-related concerns contained in the
enclosure, and in accordance with 10 CFR 2.390 a copy of this letters enclosure will not be
available for public inspection.
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
2
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
You are required to respond to this letter and should follow the instructions specified in the
enclosed Notice when preparing your response. The NRC will use your response, in part, to
determine whether further enforcement action is necessary to ensure compliance with
regulatory requirements.
If you contest the violation or significance of the NOV, you should provide a response within 30
days of the date of this inspection report, with the basis for your denial, to the Nuclear
Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001, with
copies to the Regional Administrator, Region II, and the Director, Office of Enforcement, United
States Nuclear Regulatory Commission, Washington, DC 20555-0001, and the NRC Resident
Inspector at the Shearon Harris facility.
Because this issue involves security-related information, your response will not be made
available electronically for public inspection in the NRC Public Document Room or from the
NRCs document system (ADAMS), accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html. If Safeguards Information is necessary to provide
an acceptable response, please provide the level of protection described in 10 CFR 73.21.
Sincerely,
/RA/
Joel T. Munday, Chief
Plant Support Branch 2
Division of Reactor Safety
Docket No. 50-400
License No. NPF-63
cc w/Encl: See Page 3
Enclosures:
1. Factual Summary of OI Investigation 2-2007-031
2. Results of OI Investigation 2-2007-031
4. List of Items Opened, Closed and Discussed
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
cc w/encl:
Paul Fulford, Manager
Performance Evaluation and Regulatory Affairs PEB5
Progress Energy Carolinas, Inc.
P.O. Box 1551
Raleigh, NC 27602-1551
Chris L. Burton
Director Site Operations
Progress Energy Carolinas, Inc.
Shearon Harris Nuclear Power Plant
P.O. Box 165, Zone 1
New Hill, NC 27562-0165
David H. Corlett, Supervisor
Licensing/Regualtory Programs
Progress Energy Carolinas, Inc.
Shearon Harris Nuclear Power Plant
P.O. Box 165, Zone 1
New Hill, NC 27562-0165
David T. Conley
Associate General Counsel-Legal Dept.
Progress Energy Service Company, LLC
P.O. Box 1551
Raleigh, NC 27602-1551
Kelvin Henderson
Plant General Manager-Harris Plant
Progress Energy Carolinas, Inc.
Shearon Harris Nuclear Power Plant
P. O. Box 165, Mail Zone 3
New Hill, NC 27562-0165
Phyllis H. Mentel, (Acting)Manager
Support Services
Progress Energy Carolinas, Inc.
Shearon Harris Nuclear Power Plant
P.O. Box 165, Mail Zone 1
New Hill, NC 27562-0165