IR 05000400-08-402, on 03/10/2008, Shearon Harris Nuclear Plant, Notice of Violation
ML081890064
Person / Time
Site: Harris 
Issue date: 07/03/2008
From: Joel Munday
NRC/RGN-II/DRS/PSB2
To: Duncan R
Carolina Power & Light Co
References
2-2007-031, EA-08-181, NOV-08-402-01 IR-08-402
Download: ML081890064 (3)


See also: IR 05000400/2008402

Text

Enclosure(s) transmitted herewith contain(s) SUNSI. When separated from enclosure(s), this

transmittal document is decontrolled.

LIMITED INTERNAL

DISTRIBUTION PERMITTED

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

SAM NUNN ATLANTA FEDERAL CENTER

61 FORSYTH STREET, SW, SUITE 23T85

ATLANTA, GEORGIA 30303-8931

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

July 3, 2008

EA-08-181

Carolina Power and Light Company

ATTN: Mr. Robert J. Duncan, II

Vice President - Harris Plant

Shearon Harris Nuclear Power Plant

P. O. Box 165, Mail Code: Zone 1

New Hill, North Carolina 27562-0165

SUBJECT:

NRC OFFICE OF INVESTIGATION REPORT 2-2007-031, HARRIS NUCLEAR

PLANT INSPECTION REPORT 05000400/2008402, AND NOTICE OF

VIOLATION

Dear Mr. Duncan:

This refers to the investigation completed on March 10, 2008, at Shearon Harris Nuclear Power

Plant. The purpose of the investigation was to review the facts and circumstances associated

with a security related issue. The results of the investigation were discussed on July 3, 2008

with Mr. D. Corlett and other members of your staff.

Based on the results of the investigation, the NRC has determined that a Severity Level IV

violation of NRC requirements occurred. The violation was evaluated in accordance with the

NRC Enforcement Policy. The current Enforcement Policy is located on the NRC=s Web site at

http://www.nrc.gov/about-nrc/regulatory/enforcement/enforce-pol.html. The violation is

documented in the enclosed Notice of Violation (Notice). For administrative purposes, this letter

is issued as Inspection Report 05000400/2008402, and the NOV is designated as05000400/2008402-01.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS

is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public

Electronic Reading Room). However, because of the security-related concerns contained in the

enclosure, and in accordance with 10 CFR 2.390 a copy of this letters enclosure will not be

available for public inspection.

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

CP&L

2

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

You are required to respond to this letter and should follow the instructions specified in the

enclosed Notice when preparing your response. The NRC will use your response, in part, to

determine whether further enforcement action is necessary to ensure compliance with

regulatory requirements.

If you contest the violation or significance of the NOV, you should provide a response within 30

days of the date of this inspection report, with the basis for your denial, to the Nuclear

Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001, with

copies to the Regional Administrator, Region II, and the Director, Office of Enforcement, United

States Nuclear Regulatory Commission, Washington, DC 20555-0001, and the NRC Resident

Inspector at the Shearon Harris facility.

Because this issue involves security-related information, your response will not be made

available electronically for public inspection in the NRC Public Document Room or from the

NRCs document system (ADAMS), accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html. If Safeguards Information is necessary to provide

an acceptable response, please provide the level of protection described in 10 CFR 73.21.

Sincerely,

/RA/

Joel T. Munday, Chief

Plant Support Branch 2

Division of Reactor Safety

Docket No. 50-400

License No. NPF-63

cc w/Encl: See Page 3

Enclosures:

1. Factual Summary of OI Investigation 2-2007-031

2. Results of OI Investigation 2-2007-031

3. Notice of Violation

4. List of Items Opened, Closed and Discussed

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

cc w/encl:

Paul Fulford, Manager

Performance Evaluation and Regulatory Affairs PEB5

Progress Energy Carolinas, Inc.

P.O. Box 1551

Raleigh, NC 27602-1551

Chris L. Burton

Director Site Operations

Progress Energy Carolinas, Inc.

Shearon Harris Nuclear Power Plant

P.O. Box 165, Zone 1

New Hill, NC 27562-0165

David H. Corlett, Supervisor

Licensing/Regualtory Programs

Progress Energy Carolinas, Inc.

Shearon Harris Nuclear Power Plant

P.O. Box 165, Zone 1

New Hill, NC 27562-0165

David T. Conley

Associate General Counsel-Legal Dept.

Progress Energy Service Company, LLC

P.O. Box 1551

Raleigh, NC 27602-1551

Kelvin Henderson

Plant General Manager-Harris Plant

Progress Energy Carolinas, Inc.

Shearon Harris Nuclear Power Plant

P. O. Box 165, Mail Zone 3

New Hill, NC 27562-0165

Phyllis H. Mentel, (Acting)Manager

Support Services

Progress Energy Carolinas, Inc.

Shearon Harris Nuclear Power Plant

P.O. Box 165, Mail Zone 1

New Hill, NC 27562-0165