10/3/13 Summary of Meeting with Duke Energy Carolinas, LLC to Discuss the Protected Service Water System Operation - Oconee Nuclear Station Units 1, 2, and 3
ML13281A697
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 10/21/2013
From: Richard Guzman
Plant Licensing Branch II
To:
Guzman R
Shared Package
ML13281A565 List:
References
TAC ME7737, TAC ME7738, TAC ME7739, TAC ME7746, TAC ME7747, TAC ME7748
Download: ML13281A697 (3)


Text

...~" REGui UNITED STATES

~.§,'>,;

<<7"'01\\

NUCLEAR REGULATORY COMMISSION

~

WASHINGTON, D.C. 20555-0001 0

Iii

~

~

October 21, 2013 V';.

~

1-1}

,..0 LICENSEE:

Duke Energy Carolinas, LLC FACILITY:

Oconee Nuclear Station, Units 1,2, and 3

SUBJECT:

SUMMARY

OF OCTOBER 3, MEETING WITH DUKE ENERGY CAROLINAS, LLC, TO DISCUSS THE PROPOSED LICENSE AMENDMENT REQUEST REGARDING THE PROTECTED SERVICE WATER SYSTEM OPERATION FOR THE OCONEE NUCLEAR STATION, UNITS 1,2, AND 3 (TAC NOS.

ME7737, ME7738, ME7739, ME7746, ME7747, AND ME7748)

On October 3, 2013, a Category 1 public meeting was held among staff from the U.S. Nuclear Regulatory Commission (NRC) and representatives of Duke Energy Carolinas, LLC (Duke or the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. A list of attendees is enclosed. The purpose of the meeting was to allow the licensee to discuss their analyses performed and proposed alternate means of providing cooling to the reactor building and auxiliary building associated with the operation of the Protected Water System (PSW) in support of its response to the NRC staff's request for additional information (RAI-170) dated June 28,2013, Agencywide Documents Access and Management System (ADAMS) Accession No. ML13190A016. RAI-170 concerns the effects of the increased heat loads associated with the operation of the PSW system and the licensees proposed response to address the resulting temperature increases.

There were no members of the public in attendance, and no public meeting feedback forms were received. A list of attendees is enclosed. The licensee's meeting slides is available in ADAMS at Accession No. ML13275A269.

Please direct any inquiries to me at 301-415-1030, or by email to Richard.Guzman@nrc.gov.

Richard V. Guzman, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287

Enclosure:

List of Attendees cc w/encls: Distribution via Listserv

LIST OF ATTENDEES OCTOBER 3,2013, 10:00 AM TO 11 :30 AM MEETING WITH DUKE ENERGY CAROLINAS, LLC PROTECTED SERVICE WATER SYSTEM OPERATION ALTERNATE COOLING OCONEE NUCLEAR STATION, UNITS 1,2, AND 3 DOCKET NOS, 50-269, 50-270, AND 50-287 NAME ORGANIZATION John Monninger U.S. Nuclear Regulatory Commission (NRC)

Jake Zimmerman NRC Robert Pascarelli NRC Richard Guzman

!\\IRC Alexander TSirigotis NRC Swagata Som NRC Matthew Hamm NRC Evan Davidson NRC Edward Smith NRC Kamishan Martin NRC Dave Baxter Duke Energy Carolinas, LLC (Duke)

Rich Freudenberger Duke Jason Patterson Duke Timothy Brown Duke B.J. Gatten*

Duke

  • Participated via conference line Enclosure

October 21,2013 LICENSEE:

Duke Energy Carolinas, LLC FACILITY:

Oconee Nuclear Station, Units 1, 2, and 3

SUBJECT:

SUMMARY

OF OCTOBER 3, MEETING WITH DUKE ENERGY CAROLINAS, LLC, TO DISCUSS THE PROPOSED LICENSE AMENDMENT REQUEST REGARDING THE PROTECTED SERVICE WATER SYSTEM OPERATION FOR THE OCONEE NUCLEAR STATION, UNITS 1,2, AND 3 (TAC NOS.

ME7737, ME7738, ME7739, ME7746, ME7747, AND ME7748)

On October 3,2013, a Category 1 public meeting was held among staff from the U.S. Nuclear Regulatory Commission (NRC) and representatives of Duke Energy Carolinas, LLC (Duke or the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. A list of attendees is enclosed. The purpose of the meeting was to allow the licensee to discuss their analyses performed and proposed alternate means of providing cooling to the reactor building and auxiliary building associated with the operation of the Protected Water System (PSW) in support of its response to the NRC staff's request for additional information (RAI-170) dated June 28,2013, Agencywide Documents Access and Management System (ADAMS) Accession No. ML13190A016. RAI-170 concerns the effects of the increased heat loads associated with the operation of the PSW system and the licensees proposed response to address the resulting temperature increases.

There were no members of the public in attendance, and no public meeting feedback forms were received. A list of attendees is enclosed. The licensee's meeting slides is available in ADAMS at Accession No. ML13275A269.

Please direct any inquiries to me at 301-415-1030, or by email to Richard.Guzman@nrc.gov.

IRA!

Richard V. Guzman, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287

Enclosure:

List of Attendees cc w/encls: Distribution via Listserv DISTRIBUTION:

PUBLIC RPascarelli, NRR JMonninger, NRR ESmith NRR LPL2-1 r/f RidsNrrDorl ATsirigotis, NRR JZimmerman, NRR RidsNrrDorlLpl2-1 Resource SSom, NRR MHamm, NRR KMartin, NRR EDavidson, NRR RidsNrrLASFigueroa RidsNrrPMOconee RidsRgn2MailCenter ADAMS Accession Nos.: PKG: ML13281A565 Notice: ML13262A343 srd ML13275A269 Summary: ML13281A697 I es:

OFFICE DORULPL2-1/PM DORULPL2-1/LA DORULPL2-1/BC DORULPL2-1/PM NAME RGuzman SFigueroa RPascarelli RGuzman

DATE 10/9/13 10/9/13 10/18/13 10/21/13 OFFICIAL RECORD COpy