ML17053C957

From kanterella
Revision as of 13:55, 9 January 2025 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EPP-2 Re Fire fighting,EPP-3 Re Search & Rescue & EPP-4 Re Personnel Injury & Illness
ML17053C957
Person / Time
Site: Nine Mile Point 
Issue date: 11/18/1981
From: Dise D
NIAGARA MOHAWK POWER CORP.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML17053C956 List:
References
NUDOCS 8112040301
Download: ML17053C957 (2)


Text

V NIAGARA NIAGARAMOHAWKPOWER CORPORATION/300 ERIE BOULEVARDWEST. SYRACUSE. N.Y. 13202/TELEPHONE (315) 474-1$ 11 Mr. H. R. Denton, Director

. Office of Nuclear Reactor Regulations U. S. Nuclear Regulatory Commission Washington, D. C. 20555 si November 18, 1981;- -..j.-i ~,~

Il,q,

~aj~ -8'

'w'=::

Re: Nine Mile Point Unit 1

Docket No. 50-220 DPR-63

Dear Mr. Denton:

Enclosed are ten (10) uncontrolled copies of the following Nine Mile Point Nuclear Station emergency plan implementing procedures:

Procedure Number Tit1e EPP-2, Revision 6

EPP-3, Revision 3

EPP-4, Revision 4

EPP-13, Revision 8

EPP-23, Revision 0

Fire Fighting Search and Rescue Personnel Injury and Illness Onsite Emergency Facility Operations Emergency Operations Facility These revised procedures are provided as required by Section V to Appendix E of 10 CFR Part 50.

Controlled copies of these procedures have been provided to the Inspection and Enforcement

Branch, Region I.

Very truly yours, GJG:ja Enclosures 8112040301 821127&

PDR ADOCK 05000220I F

PDR i'IAGARA MOHA!IK POWER CORPORATION j4t'6 -'~

D. P. Disc Vice President Engineering pd'

O.

I If Ifh tllJ l 1 A I

x~,-

xe'V W4 V A