ML17053C957

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EPP-2 Re Fire fighting,EPP-3 Re Search & Rescue & EPP-4 Re Personnel Injury & Illness
ML17053C957
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 11/18/1981
From: Dise D
NIAGARA MOHAWK POWER CORP.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML17053C956 List:
References
NUDOCS 8112040301
Download: ML17053C957 (2)


Text

V NIAGARA NIAGARA MOHAWK POWER CORPORATION/300 ERIE BOULEVARD WEST. SYRACUSE. N.Y. 13202/TELEPHONE (315) 474-1$ 11 si November 18, 1981;- -..j.-i ~,~

Il,q, ~aj~ -8' Mr. H. R. Denton, Director Office of Nuclear Reactor Regulations 'w'=::

U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Re: Nine Mile Point Unit 1 Docket No. 50-220 DPR-63

Dear Mr. Denton:

Enclosed are ten (10) uncontrolled copies of the following Nine Mile Point Nuclear Station emergency plan implementing procedures:

Procedure Number Tit1e EPP-2, Revision 6 Fire Fighting EPP-3, Revision 3 Search and Rescue EPP-4, Revision 4 Personnel Injury and Illness EPP-13, Revision 8 Onsite Emergency Facility Operations EPP-23, Revision 0 Emergency Operations Facility These revised procedures are provided as required by Section V to Appendix E of 10 CFR Part 50. Controlled copies of these procedures have been provided to the Inspection and Enforcement Branch, Region I.

Very truly yours, MOHA!IK POWER CORPORATION i'IAGARA j4t'6 -'~

D. P. Disc Vice President Engineering GJG:ja Enclosures 8112040301 821127&

pd' PDR ADOCK 05000220I F PDR

I O.

I x~,-If Ifhxe'VtllJ W4 l A V 1A