gPS RE0IJ,
tp0
Cy
- Q
/g
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION V
1990 N. CALIFORNIABOULEVARD
SUITE 202, WALNUTCREEK PLAZA
WALNUTCREEK, CALIFORNIA94596
March 26,
1981
Docket Nos. 50-275,
50-323
Pacific
Gas
and Electric Company
P. 0.
Box 7442
San Francisco,
94106
Attention:
Mr. Philip A. Crane, Jr.
Assistant
General
Counsel
Gentlemen:
Subject:
NRC Inspection at Diablo Canyon Units
1 and
2
This refers to the inspection
conducted
by Mr. D. F. Kirsch of this office
on March 10-13,
1981 of activities authorized
by
NRC Construction Permit
Nos.
CPPR-39
and
CPPR-69,
and to the discussions
of our findings held with
Mr. R.
D. Etzler
and other members of your staff at the conclusion of the
inspection.
Areas examined during this inspection are described
in the enclosed
inspection
report.
Within these
areas,
the inspection consisted of selective
examinations
of procedures
and representative
records,
interviews with personnel,
and
.observations
by the inspector.
No items of noncompliance with NRC requirements
were identified within the
scope of this inspection.
In accordance
with Section 2.790 of the
HRC's "Rules of Practice," Part 2,
Title 10,
Code of Federal
Regulations,
a copy of this letter and the enclosed
inspection report will be placed in the HRC's Public Document
Room. If this
report contains
any information that you believe to be proprietary, it is
,necessary
that you submit
a written application to this office, within 20
days of the date of this letter, requesting that such, information be withheld
from public disclosure.
The application must include
a full statement of
the reasons
why it is claimed that the information is proprietary.
The application
should
be prepared
so that any proprietary information identified is contained
in an enclosure to the application, since the application without the enclosure
will also
be placed in the Public Document
Room. If we do not hear
from
you in this regard within the specified period, the report will be placed
in the Public Document
Room.
8104900/g(F
ll
h
A
Pacific
Gas
and Electric Company
~
~
-2-
March 26,
1981
Should you have
any questions
concerning this inspection,
we will be glad
to discuss
them with you.
Sincerely,
Enclosure:
IE Inspection
Report
Nos. 50-275/81-04
50-323/81-04
cc w/enclosure:
R.
D. Etzler,
PGSE (Diablo Canyon)
J.
B. Hoch, Project Engineer,
PGSE
cc w/o enclosure:
ll. A. Raymond,
PG8E
E.
B. Langley, Jr.,
PGRE
R.
C. Thornberry,
PG&E (Avila Beach)
B.
H. Faulkenb
y, Chief
Reactor
Constru 'ects
Branch