Forwards IE Insp Repts 50-275/81-04 & 50-323/81-04,on 810310-13.No Noncompliance Noted
ML17083A852
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 03/26/1981
From: Faulkenberry, Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Crane P
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML17083A853 List:
References
NUDOCS 8104300126
Download: ML17083A852 (4)


See also: IR 05000275/1981004

Text

gPS RE0IJ,

tp0

Cy

Q

/g

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1990 N. CALIFORNIABOULEVARD

SUITE 202, WALNUTCREEK PLAZA

WALNUTCREEK, CALIFORNIA94596

March 26,

1981

Docket Nos. 50-275,

50-323

Pacific

Gas

and Electric Company

P. 0.

Box 7442

San Francisco,

California

94106

Attention:

Mr. Philip A. Crane, Jr.

Assistant

General

Counsel

Gentlemen:

Subject:

NRC Inspection at Diablo Canyon Units

1 and

2

This refers to the inspection

conducted

by Mr. D. F. Kirsch of this office

on March 10-13,

1981 of activities authorized

by

NRC Construction Permit

Nos.

CPPR-39

and

CPPR-69,

and to the discussions

of our findings held with

Mr. R.

D. Etzler

and other members of your staff at the conclusion of the

inspection.

Areas examined during this inspection are described

in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examinations

of procedures

and representative

records,

interviews with personnel,

and

.observations

by the inspector.

No items of noncompliance with NRC requirements

were identified within the

scope of this inspection.

In accordance

with Section 2.790 of the

HRC's "Rules of Practice," Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and the enclosed

inspection report will be placed in the HRC's Public Document

Room. If this

report contains

any information that you believe to be proprietary, it is

,necessary

that you submit

a written application to this office, within 20

days of the date of this letter, requesting that such, information be withheld

from public disclosure.

The application must include

a full statement of

the reasons

why it is claimed that the information is proprietary.

The application

should

be prepared

so that any proprietary information identified is contained

in an enclosure to the application, since the application without the enclosure

will also

be placed in the Public Document

Room. If we do not hear

from

you in this regard within the specified period, the report will be placed

in the Public Document

Room.

8104900/g(F

ll

h

A

Pacific

Gas

and Electric Company

~

~

-2-

March 26,

1981

Should you have

any questions

concerning this inspection,

we will be glad

to discuss

them with you.

Sincerely,

Enclosure:

IE Inspection

Report

Nos. 50-275/81-04

50-323/81-04

cc w/enclosure:

R.

D. Etzler,

PGSE (Diablo Canyon)

J.

B. Hoch, Project Engineer,

PGSE

cc w/o enclosure:

ll. A. Raymond,

PG8E

E.

B. Langley, Jr.,

PGRE

R.

C. Thornberry,

PG&E (Avila Beach)

B.

H. Faulkenb

y, Chief

Reactor

Constru 'ects

Branch