05000316/LER-1979-011-03, /03L-0 on 790327:outer Door Seal of Lower Containment Air Lock Found Leaking.Caused by Force Placed on Seal During Installation of Security Gate at Air Lock Entrance.Seal Tightened & Outer Seal Retested

From kanterella
Revision as of 16:59, 7 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
/03L-0 on 790327:outer Door Seal of Lower Containment Air Lock Found Leaking.Caused by Force Placed on Seal During Installation of Security Gate at Air Lock Entrance.Seal Tightened & Outer Seal Retested
ML17317B118
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 04/17/1979
From: Rischling J
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML17317B117 List:
References
LER-79-011-03L-01, LER-79-11-3L-1, NUDOCS 7904240414
Download: ML17317B118 (3)


LER-1979-011, /03L-0 on 790327:outer Door Seal of Lower Containment Air Lock Found Leaking.Caused by Force Placed on Seal During Installation of Security Gate at Air Lock Entrance.Seal Tightened & Outer Seal Retested
Event date:
Report date:
3161979011R03 - NRC Website

text

U. S. NUCLEAR REGULATORYCOMMISSION ICENSEE fVENT REPORT Q1 IPLEASE PRINT OR TYPE ALLREQUIRED INFORMATION) 6 0 Q'>>

I I Qo~ Qo LICENSE NUMBER 25 26 LICENSE TYPE 30 57 CAT 58 NRC FORM 366

]7.77)

~

CONTROL BLOCK:

I M

I D

C C

2Q20 9

LICENSEE CODE 14 15 [os 7

8 CON'T

~o QB

~LQB 0

5 0

0 0

3 1

6Q7 0

3 2

7 7

9QB 0

4 60 o

61 DOCKET NUMBER 68 69 EVENT DATE 74 75 REPORT DATE EVENT DESCRIPTION AND PROBABLE CONSEQUENCES Q10 DURING A SURVEILLANCE TEST ON THE LOWER CONTAINMENT AIR LOCK THE OUTER D

R 80 7

8 SEAL LEAKAGE WAS FOUND TO BE 458 SCCM.

THIS EXCEEDED THE LIMIT OF.0005 L

SCCM

~O4 t pe AS SPECIFIED BY T.S. 4.6.1.3.b.

PREVIOUS OCCURRENCES INCLUDE: 315 78-23 37'43 316/78-82.

~OB

~O7

~os 80 7

8 7

8 LOCK DOOR SEALS WAS LOOSENED DURING THE INSTALLATION OF A SECURITY GATE AT THE 9

SYSTEM

CAUSE

CAUSE COMP.

VALVE CODE CODE SUBCODE COMPONENT CODE SUBCODE SUBCODE 0>>

I Q>>

LJQ>>

E E

T R

Q4

~AQio

~ZQlo 9

10 11 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION LER(RP EVENT YEAR REPORT NO.

CODE TYPE NO.

Pn oooo'1 22 23 24 26 27 28 29 30 31 32 ACTION FUTURE EFFECT SHUTDOWN ATTACHMENT NPRDQ PRIME COMP.

COMPONENT TAKEN ACTION ON PLANT METHOD HOURS Q22 SUBMITTED FORM SUB.

SUPPLIER MANUFACTURER MBQ&ZQlo MZQoo

~ZQ>>

0 0

0

~Qo3 I

IQo4

~AS W

3 0

E Qoo 33 34 35 36 37 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS Q27 o

INVESTIGATION REVEALED THAT THE SEAL ON A TEST LINE ENTERING BETWEEN THE AIR AIR LOCK ENTRANCE.

THIS GATE WAS INSTALLED DURING THE FIRST WEEK OF JANUARY 3

4 OF THIS YEAR BY CONSTRUCTION PERSONNEL.

APPARENTLY, WHILE INSTALLING THE FRAMEWORK FOR THE NEW SECURITY GATE A SIZEABLE AMOUNT OF FORCE (SEE SUPPLEMENT)

CO ACTIVITY CONTENT RELEASED OF RELEASE AMOUNTOF ACTIVITYQ OZa W Q33 WZQ34 NA 7

8 9

10 11 44 PERSONNEL EXPOSURES 7

8 9

11 12 13 PERSONNEL INJURIES a ~0~

0 Qoo NA LOCATION OF RELEASE 45 g yC3 '(2-'(0 Y ( V 7

8 9

FACILITY

~3P METHOD OF STATUS

% POWER OTHER STATUS ~

DISCOVERY DISCOVERY DESCRIPTION Q32 o

E Qoo '3Q 0

Qoo NA

~BQoi SURVEILLANCE TEST 8

9 10 12 13 44 45 46 80 80 80 80 7

8 7

8 o

8 NAIVIEOF PREPARER J.

L. Rischling 9

11 12 LOSS OF OR DAMAGETO FACILITY~43 TYJE

DESCRIPTION

'Q NA 9

10 PUBLICITY ISSUED DESCRIPTION ~4 9

10 NRC USE ONLY 616-465-5901 80 80 ooO 80 oo 0L0

II e

4:s II

SUPPLEMENT'TO LER'f79-Oll/03L-0 SUPPLEMENT TO CAUSE DESCRIPTION WAS PLACED ON THIS PIPE LOOSENING THE PIPE SEAL.

THE ROUTINE SURVEILLANCE CHECKS OF THE AIR LOCK, AS REQUIRED BY T.S. 4.6.1.3.a WERE COMPLETED AS REQUIRED WITH NO DISCREPANCIES.

ONLY THE MORE SENSITIVE TESTING REQUIRED BY T.S, 4.6.1.3.b DETECTED THE EX-CESSIVE LEAKAGE.

THE PIPE SEAL WAS TIGHTENED AND THE OUTER DOOR SEAL WAS RETESTED WITH AN ACCEPTABLE LEAK RATE, THESE SECURITY GATE MODIFICATIONS HAVE BEEN COMPLETED ON ALL THE OTHER AIR LOCK ENTRANCES, AND ALL HAVE ADEQUATELY PASSED THE MORE SENSI'TIVE LEAK RATE TEST.

NO FURTHER ACTION IS PLANNED AT THIS