ML18018B944

From kanterella
Revision as of 05:11, 7 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Ack Receipt of 850410 & 11 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-400/85-04
ML18018B944
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/23/1985
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
Shared Package
ML18018B945 List:
References
NUDOCS 8505210495
Download: ML18018B944 (1)


See also: IR 05000400/1985004

Text

APR 23 t985

Carolina

Power and Light Company

ATTN:

Mr. E.

ED Utley

Executive Vice President

Power Supply and Engineering

and Construction

411 Fayetteville Street

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

REPORT

NO. 50-400/85-04

Thank

you for your

responses

of April 10

and ll,

1985,

to

our Notice of

Violations

issued

on

March 12,

1985,

concerning

activities

conducted

at your

Harris facility.

We have evaluated your responses

and

found that they

meet

the

requirements

of

10 CFR 2.201.

We will examine

the

implementation

of your

corrective

actions during future inspections.

We appreciate

your cooperation

in this matter.

Sincerely,

cc:

R. A. Watson,

Vice President

Harris Nuclear Project

R.

M. Parsons,

Project General

Manager

bcc:

NRC Resident

Inspector

Document Control

Desk

State of South Carolina

David M. Verrelli, Chief

Reactor Projects

Branch

1

Division of Reactor Projects

RII

OK'Hardin:dr

4/R8/85

RI~

PFredrickson

4/ G/85

8505210M'5 850423

PDR