ML15259A022

From kanterella
Revision as of 13:15, 15 March 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search

Donald C. Cook Nuclear Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Relief Request REL-PP1 (TAC Nos. MF6548 and MF6549)
ML15259A022
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 09/17/2015
From: Dietrich A W
Plant Licensing Branch III
To: Weber L J
Indiana Michigan Power Co
Dietrich A W
References
TAC MF6548, TAC MF6549
Download: ML15259A022 (3)


Text

Mr. Lawrence Senior Vice President and Chief Nuclear Officer September 17, 2015 Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, Ml 49106

SUBJECT: DONALD C. COOK NUCLEAR PLANT, UNITS 1 AND 2 -ACCEPTANCE OF REQUESTED LICENSING ACTION RE: RELIEF REQUEST REL-PP1 (TAC NOS. MF6548 AND MF6549)

Dear Mr. Weber:

By letter dated July 31, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15216A121), Indiana Michigan Power Company (l&M, the licensee) submitted, under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a(z)(1 ), a request for approval of a proposed alternative for the Donald C. Cook Nuclear Plant, Units 1 and 2, lnservice Testing Program. The proposed alternative would allow measurement of axial vibration of boric acid pumps from the outboard motor bearing. The U.S. Nuclear Regulatory Commission (NRC) staff requested supplemental information by letter dated September 2, 2015 (ADAMS Accession No. ML 15239B033), to complete the acceptance review of the subject request. The licensee provided the requested supplemental information by letter dated September 11, 2015 (ADAMS Accession No. ML 15258A024). In the supplement, the licensee stated that the alternative is now being requested under 1 O CFR Section 50.55a(z)(2). The purpose of this letter is to provide the results of the NRC staff's acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. Pursuant to 10 CFR Section 50.55a(z)(2), the applicant shall demonstrate that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed alternative in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence. If you have any questions, please contact me at (301) 415-2846. Docket Nos. 50-315 and 50-316 cc: Distribution via Listserv Allison W. Dietrich, Project Manager Plant Licensing Branch 3-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence. If you have any questions, please contact me at (301) 415-2846. Docket Nos. 50-315 and 50-316 cc: Distribution via Listserv DISTRIBUTION: PUBLIC Branch Reading File RidsAcrsAcnw_MailCTR Resource RidsNrrEpnb Resource RidsNrrDorl Resource RidsNrrDorlDpr Resource RidsNrrDorllpl3-1 Resource RidsNrrLAMHenderson Resource RidsNrrLIC109 Resouirce RidsNrrPMDCCook Resource RidsRgn3MailCenter Resource ADAMS Accession No. ML 15259A022

Sincerely,/RAJ Allison W. Dietrich, Project Manager Plant Licensing Branch 3-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation OFFICE NRR/DORL/LPL3-1 /PM NRR/DORL/LPL3-1 /LA NRR/DORL/LPL3-1/BC NRR/DORL/LPL3-1 /PM NAME ADietrich MHenderson DPelton ADietrich DATE 9/15/2015 9/17/2015 9/17/2015 9/17/2015 OFFICIAL RECORD COPY