05000334/LER-1979-020-01, /01T-0 on 790724:during Insp,Inoperable Pipe Hanger Baseplate Observed.Caused by Improper Installation of Concrete Expansion Anchors in Baseplate Due to Lack of Formal Procedures During Initial Installation

From kanterella
Revision as of 13:15, 4 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
/01T-0 on 790724:during Insp,Inoperable Pipe Hanger Baseplate Observed.Caused by Improper Installation of Concrete Expansion Anchors in Baseplate Due to Lack of Formal Procedures During Initial Installation
ML19242D265
Person / Time
Site: Beaver Valley
Issue date: 08/07/1979
From: Werling J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19242D250 List:
References
BVPS:JAW:700, LER-79-020-01T, LER-79-20-1T, NUDOCS 7908140768
Download: ML19242D265 (1)


LER-1979-020, /01T-0 on 790724:during Insp,Inoperable Pipe Hanger Baseplate Observed.Caused by Improper Installation of Concrete Expansion Anchors in Baseplate Due to Lack of Formal Procedures During Initial Installation
Event date:
Report date:
3341979020R01 - NRC Website

text

N HC F UMM ' bts U.b. NUULk AM MtGULAlUHY COMMlWlVN J

nm.>.

LICENSEE EVENT REPORT-CONTROL BLOCK: l l

l l

l lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATIONI l

6 [T[Il l P l A l 3 l V l S l 1 l@l 0 l0 l-l 0 l0 l 0 l 0 l 0 l-l0 l 0 l@l4 l1 l1 l1 l 1 l@l l

l@

P S 9 LICENSEE CODE 14 IS ULENSE NUMBER 25 26 LICENSE TYPE JJ Si CATE8 CON'T EuRC I L hl 0 l. 5 l 0 l 0 l 0 l 3 [ 3 l 4 @l 0 l 7 l 2 l 4 l 7 l 9 l@l0 l8 l0 l7 l7 19 l@

o i

i 8

6J 61 DOCKET NuvFnR 63 69 EVENT DATE 14 it f:iEPORT DAT E SJ EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h

['o TT1 I During performance of the baseplate inspection procedure developed to comply with IE l

g l Bulletin 79-02, an inoperable baseplate was observed.

The pipe hanger baseplate was l

ITTT1i H-208 which is on the three inch charging line near the regenerative heat exchanger in ITTTl I c ntainment. The concrete expansion anchors in the baseplate were improperly installed l l and f ailed during the pullout. test because of oversized holes.

l o s ITITl i I

o a I l

7 8 9 00 SYSTE M CAUSs

CAUSE

COMP.

VALVE CODE CODE SUSCODE COMPONENT CODE SUSCOOE SU8 CODE l Pl Cl@ y@

Z l@ l S l U l P l 0 l R l T l@ ]@ l Z l @

O 9 7

8 9

to 11 12 13 is 19 20 S E QUE NTI AL OCCURRENCE R2 PORT REVISloN LE R/RO EVENT YE A R R EPOR T NO.

COOE TYPE No.

OU,A l7 l9 l l-l l 0l 2 0l l 0l 1 lTl l-l W

_ 21 22 23 24 26 27 78 29 Ju 31 32 TAKEN A T ON ON PLANT YE 4 e4OURS S B IT E FOR1 8.

S PPLIE MAN FACT a[R lFl@!Zl@

lZl@

l Zl@

l 0l 0l 0l 0]

W@

lNl@

lZ l@

l Zj 9l 9l 9l@

33 34 3b 36 3/

40 43 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h l The failure was attributed to the lack of a formal installation procedure uring the l

i o

l initial installation. The hanger has been repaired bv installine :ew' anchors. A l

i i l complete report of inspection results and repairs will be made in the response to IE l

7 l Bulletin 79-02.

l i

3 mI l

7 8 9 80 STA $

% POWER OTHER STATUS ISCOV RY DISCOVERY DESCRIPTION lCl@ lJl0l0l@l N/A l

l C l@l IE Bulletin 79-02 inspection l

i s

CO$ TENT ACTivlTY RELEASED OF RELE ASE AMOUNT OF ACTivlTY LOCATION OF RELEASE

@ ! Zl l

N/A l

l N/A l

1 6

7 8 9 10 11 44 45 80 PERSONNEL EXPOSURES NUV8E R TYPE D E SCRIPTION 10l010l@lZl@l N/A l

i 7

EnSONNELiN J ES P

cESCniPTiON@

Nuv8ER 10l0101@l N/A l

i 4

7908140 76c?

f LCSS OF CR O 1 AGE TO FACluTY 43 TYPE D E SCRIP TION

[_Z_J@

N/A l

i 9

7 8 9 10 60 iSSuf @l DESCRIPTION

'N/A

~ ()

l2 o

lIlllll [lIiIII I

8 9 10 68 E9 20.;

UE NAME OF PREPARER PHONT