05000318/LER-1980-023-03, /03L-0:on 800416,while 21 Diesel Generator Was Being Taken Off 24 4 Kv Bus Following Test,Two 15 Vdc Power Supplies Had No Output.Caused by Tripped Overvoltage Protection Modules

From kanterella
Revision as of 05:15, 2 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
/03L-0:on 800416,while 21 Diesel Generator Was Being Taken Off 24 4 Kv Bus Following Test,Two 15 Vdc Power Supplies Had No Output.Caused by Tripped Overvoltage Protection Modules
ML19305E820
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 05/16/1980
From: Davis S
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19305E814 List:
References
LER-80-023-03L, LER-80-23-3L, NUDOCS 8005200473
Download: ML19305E820 (2)


LER-1980-023, /03L-0:on 800416,while 21 Diesel Generator Was Being Taken Off 24 4 Kv Bus Following Test,Two 15 Vdc Power Supplies Had No Output.Caused by Tripped Overvoltage Protection Modules
Event date:
Report date:
3181980023R03 - NRC Website

text

So a5.2D 0 t(73 (7 77)

LICENSEE EVENT REPORT

/%

O CONTROL BLOCK: l l

l l

l l

lh (PLEASE PRINT OR TYPE ALL REQUIRED 6NFORMAT10N) lo lil IM ID IC IC IN l2 l@l Ol Ol l Ol 01 Ol Ol 01 l 01 Ol@l 4l 1111 Il il@l l

l@

7 8 9 LICENSEE COOK to 16 UCENSE NUMBER 25 26 LICENSE TYPE JO 57 CAT 58 CON r IoIi1 S$ ice l L l@l015 10 10 10 13 11 18 l@ l 0I 4l 1l 6l RI n @ l nI gI 1 I 6 IeIgl@

7 8

60 61 DOCK ET NUMBER 68 69 EVENT OATE 74 75 REPOR T OATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h I o 12 I l AT 1045 WHILE 21 DIESEL GENERATOR WAS BEING TAKEN 0FF 24 4 KV BUS FOLLOWING A I

Io Ia l l TEST, STEAM GENERATOR ISOLATION SIGNAL (SGIS) B BLOCK PERMITTED. SGIS B BLOCKED I

i o 14 i l AND LOCI SEQUENCER INITI ATED WENT INTO ALARM.

AN INVESTIGATION REVEALED THAT I

I o I s 1 l 'IVO 15 VDC POWER SUPPLIES HAD NO OUTPUT. THEY SUPPLY ESFAS LOGIC B CABINET I

I O ls 1 I SGIS/ RAS /CRS/CSAS, LOCI AND SHUTDOWN SE0VENCER FUNCTIONS.

(T.S. 3.3.2.1) 1 [O l 7 l l THE 15 VDC POWER SUPPLIES WERE RESET AND ESFAS LOGIC B CABINET WAS RETURNED I

ioIai i SERVICE AT 1340.

LER 79-31 (U-1) DESCRIBES A SIMILAR EVENT.

1 OE CODE SUSC E COMPONENT CODE S BCOO'E S

E lolol i Il Bl@ [XJ@ l Z lO il l N l 5 l T I R I U lh l_P_J@ LIJ @

7 8

9 10 11 12 13 18 19 20 VENT YEAR REPORT O COOE N

LE R /RC O Rtg 1810]

l-l 1012l31 l/l 10 13 l lLl l--J l 01 yu

_ 21 22 23 24 26 27 28 29 30 31 32 TAK N ACTO ON PL NT MET HOURS SB if FOR B.

SUPPLI R MANUFACTURER lXl@lXl@

lZI@

LZ_j@

l01010101 W@

l NI@

lAl@

l V l1 13 12 l@

33 34 JS 36 37 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS li 101 l BOTH POWER SUPPLIES' OVERV0LTAGE PROTELTION MODULES HAD TRIPPED. REDUCING THFIR I

li t i l ! OUTPUTS TO NEAR 'O' VDC. THE ALARMS DESCRIBED AB0VE WERF RFCFIVFD COTNCTDFNT I

I li i 21 1 WITH THE OPENING OF N0. 21 EMERGENCY DIESEL GENERATOR OUTPUT BREAKER WHICH WAS i,i3i l CARRYING INSIGNIFICANT LOAD AT THE TIME. A PROCEDURE IS BEING DEVELOPED TO I

l ii141 l TROUBLESHOOT THE PROBLEM.

7 8 9

$7A $

% POWER OTHE R ST ATUS SO Y

DISCOVERY DESCRIPTION NA l

l B l@l OPERATOR OBSERVATION l

Ii I 5 l Lfj@ l 1 l 0 l 0 l@l ACTIVITY CO TENT AELE AsEO OF RELE ASE AMOUNT OF ACTIVITY LOCATION OF RELE AsE I1 Is 1 LZ_J @ LZJ@l NA l

l NA I

,EpsONNEt ExPOSMES OESCRiPTiON@

NuveER TvPE l

I t 171 1 01 01 Ol@l Zl@l NA

,ERsONNEoby' lits OEsCRiPTiON@

l NuvsER li la l I 0101 Ol@l NA 20 7

8 9 11 12

'n5 ' 9 ESC %P%'N ' " " @

I E

liI9IL7J@l NA 90 1

8 9 10 I

I 1 1 1 1 I l l l l l I I I,I DE CHipfiON iggg[g@l L

Na 2 o 68 69 23 5 S. M. DAVIS /P. G. RIZZO PsO :E. h01 Wo.a m /am NA.*f. OF PREPARER L

LER N0.

80-23/3L DOCKET N0.

50-318 EVENT DATE 04/16/80 REPORT DATE 05/16/80 ATTACHMENT CAUSE DESCRIPTION ArlD CORRECTIVE ACTIONS:

IMMEDI ATELY AFTER RESETTING THE +15 VDC POWER SUPPLIES, THE OVERV0LTAGE PROTECTION TRIP P0INTS WERE MEASURED AT +16.5 VDC. BOTH POWER SUPPLIES WERE FOUND TO BE OPERATING AT +15.1 VDC. AN OSCILLOSCOPE DISPLAYED N0 NOISE OR AC RIPPLE ON EITHER OUTPUT.

THERE IS NO APPARENT REASON FOR A TRANSIENT ON A 4 KV VITAL BUS TO INDUCE A TRANSIENT WITHIN THE ESFAS CIRCUITRY. THE ESFAS IS POWERED BY VITAL INVERTERS, WHICH ARE IN TURN POWERED FROM VITAL BATTERIES; THEREFORE, A PROCEDURE IS BEING DEVELOPED FOR TROUBLESHOOTING THE APPARENT CAUSE AND EFFECT.

SINCE SUBMITTAL OF LER 79-31 (U-1), MEASUREMENTS BY INDUCING 4 KV TRANSIENTS WHILE MONITORING VARIOUS POINTS WITHIN THE VITAL POWER TRAIN MADE ON THE VITAL AC POWER TRAINS IN UNIT 1 HAVE REVEALED N0 UNUSUAL DISTORTIONS NOR COMMON MODE NOISE PATTERNS. BENCH TESTS OF A REPRESENTATIVE ESFAS +15 VDC POWER SUPPLY REVEALED NO REGULATION PROBLEMS IN RESPONSE TO VARIATIONS IN SUPPLIED VOLTAGE OR FREQUENCY WITHIN ITS DESIGN SPECIFICATIONS.

FURTHER TESTING, EMPLOYING A NEWLY PROCURED TRANSIENT-RECORDING DEVICE IS EXPECTED TO BE COMPLETED BY JUNE 30, 1980.

i i