Forwards IE Insp Repts 50-338/80-03 & 50-339/80-03 on 800212-15,notice of Violation & Notice of Deviation
ML19323B746
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 03/12/1980
From: Bryant J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Ferguson J
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML19323B737 List:
References
NUDOCS 8005140183
Download: ML19323B746 (2)


See also: IR 05000338/1980003

Text

_ _ - _ _

_ _ _ ___ _ ___________

-

.

O

a t'-

8005140 W 5

'

-

uaiTeo = tat's

s

NUCLEAR REGULATORY COMMISSION

o

$

E

REGION li

r

o

101 MARIETTA ST., N.W SUITE 3100

Y

ATLANTA, GEORGIA 30303

g*****

MAR 121980

In Reply Refer To:

RII:WHM

50-338/80-03

50-339/80-03

Virginia Electric and Power Company

ATTN:

J. H. Ferguson

Executive Vice President-Power

P. O. Box 26666

Richmond, VA 23261

Gentlemen:

This refers to the inspection conducted by W. H. Hiller, Jr., of this office on

February 12-15, 1980 of activities authorized by NRC License No. NPF-4 and Con-

struction Permit No. CPPR-79 for the North Anna facility, and to the discussion

of our findings held with W. R. Cartwright at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

j

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. These items and references

to pertinent requirements are listed in the Notice of Violation enclosed herewith

as Appendix A.

This notice is sent to you pursuant to the provisions of Section

2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-

tions. Section 2.201 requires you to submit to this office, within 20 days of

your receipt of this notice, a written statement or explanation in reply including:

(1) corrective steps which have been taken by you and the results achieved; (2)

corrective steps which will be taken to avoid further noncomplianc.e; and (3) the

,

,

date when full compliance will be achieved.

During the inspection it was found that certain activities under your license

appear to deviate from commitments to the Commission and have safety significance.

These items are identified in the Notice of Deviation enclosed herewith as

Appendix B.

Please provide us in writing within 20 days of your receipt of this

letter your comments including a description of corrective actions that have

been or will be taken, corrective actions which will be taken to avoid further

deviations, and the date corrective actions were or will be completed.

- y

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

8

._

. _

- -

. . - -

_ _ _ .

_

. - - _ -

-

.

e

Virginia Electric and

-2-

MAR 12 ggg

,

Power Company

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary infor-

mation identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we wila' be glad to discuss

them with you.

Sincerely,

.

J. C. Bryant, Acting Chief

Reactor Construction and Engineering

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

i

2.

Appendix B, Notice of Deviation

3.

Inspection Report Nos. 50-338/80-03

,

and 50-339/80-03

cc w/ encl:

W. R. Cartwright, Station Manage;

Box 402

Mineral, VA 23117

P. G. Perry

Senior Resident Engineer

P. O. Box 38

Mineral, VA 23117

.