05000366/LER-1980-062-03, /03L-0:on 800419,w/reactor in Cold Shutdown,During Primary Containment Isolation Sys Operability Test,Vacuum Breaker Valve 2T48-F323E Failed to Open When Control Switch Was Actuated

From kanterella
Revision as of 22:15, 31 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
/03L-0:on 800419,w/reactor in Cold Shutdown,During Primary Containment Isolation Sys Operability Test,Vacuum Breaker Valve 2T48-F323E Failed to Open When Control Switch Was Actuated
ML19323C996
Person / Time
Site: Hatch 
Issue date: 05/06/1980
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19323C986 List:
References
LER-80-062-03L, LER-80-62-3L, NUDOCS 8005190508
Download: ML19323C996 (2)


LER-1980-062, /03L-0:on 800419,w/reactor in Cold Shutdown,During Primary Containment Isolation Sys Operability Test,Vacuum Breaker Valve 2T48-F323E Failed to Open When Control Switch Was Actuated
Event date:
Report date:
3661980062R03 - NRC Website

text

-.

LICENSEE EVENT REPORT 800519050g 3

Cot!IIIOL CLOCK: l l

l l

l l

l (PLEASE PfitMT On TYPE ALL ntoUinED lbrOMMATIOPJ) i c

lo lij IG I A I E lI l11 l2 l@l 0l 0l -l 0l 0,l 0l 0l 0l -l0 l0 j@l 4 l 1l 1l 1l1 l@[

[

l@

7 0 9 LittN0tf Corat 14 lb t ect r.it t.uvutn 2b at, LectNSE 1Yrt JO bi CAs ba CL ITITl "l'O I Ll@l 01 5101010[ 31616]@[ 014I 1 L91810j@l 015 l Ol 61810 l@

7 8

f,0 61 DOCKE T f.UM'lLH W

6')

EVENT DATE

_#4 7b f tEPOR T DATE C0 EVENT DFSCntPTION AND PHODABLE CONSEoUENCES h lo la j [

liith the reactor in cold shutdown, while performing Primary Containment -

,j o a [

Isolation System Operability Test, the Drywell was vented thru the Drywell l

[o [4 l [

to Torus Vacuum Breakers.

When Vacuum Breaker 2T48-F323E was give a i

l _

signal to test, it did not respond and was declared inoperable.

Public 1

o s [g pr] l health and safety were not affected by this incident.

This event is l

IllL1 L_

repetitive as last reported by Reportable Occurrence !!o. 50-366/1980-018.

[

FUTirlI l

7 8 9 80

( OE COOL SU Jf.

C COMPONErlT CODE SUHCbOE

'SU C

L Sl Al@ LA_1@ Lc j@ Le i i i e I t i x I x l@ g@ Iz I @

o 9 7

8 9

to I t.

12 13 18 l 'J 20 SEOl'f fdT I AL OCCURRENCE HEFORT DEVISIOfJ g g g no IVENT YEAH REFonif.O.

CODC TYPE N O.

@,gg [218 l 0_j

[---j l0l6l2l M

[013 l lL l l-l [0j 21 2J 24 2G 27 23 23 30 31 32 kK E fd A C J PL/ dl fi k)

HOUHS SUL 11 1 F

b G.

S tt MAf FACT iTD LAJ@lz___J@ Iz l@

[lj@

101010101 LYj@

lYl@

I tl l@

lxl919191@

33 34 Ja 3 r, 3/

43 43 4y 43 44 4y CAUSE DESCnlPTION AND CennECTIVC AC NONS h lilo l l Upon investigation it was discovered that the air supply line for the I

lilil I actuating cylinder was loose.

Further investigation rovealed that follow-I gil2; [

ing the leak rate test, personnel had failed'to observe the swaoe-lock l

l I

ag) [

ferrul was missing when the air line was reconnected.

'A new fitting i

l l i.12 l 1 was installed and th_e valve tested and declared operable.

1 i

8 9 so

's'6'!U*

f%

DISCOVERY D03CnsPTION @

uOwr n oTHtH$ LATUS CJ/

II lb l 'jl J@ l 0l 0 l Ol@[ _

L_

NA l

lBl@l Operator Observation l

ACTIVITY CO I C P.T Rt t t A!(D OF PE tt AS C' AP.tOUNT OF ACTIVITY LOCATION Or HELEASE [TF1 LZ ] O Lz_.181_.

NA l

HA l

7 8 9 10 ti 44 15 NHSONNEL E FPOSURES 80 NUfMuf f t TYFC DESCnir TION li l 7! 101010 l@Lz j@l nA i

n nsOwa',mu'Ifia ouCniPiiON@

uof,n<n 7 In l l_01010 l@l l

?

6 9 _

NA l

In 12 LO*.S OF Oil O^ttef;C TO FACit ii V CO I

TWC 000Citik flON l

lujLzJ@l nA l

r P

H 9,_

IJ 00 w I nl Udf( @[1r Gittrif0N s qr.t nA i

i ii i iiiiiiiI; s o io os c9 so ::

NAYC Of PHFI'AnLH

~

PHON E:-

L

'1

NARRATIVE

REPORT Georgia power Company Plant E. 1. Hatch Baxley, Georgia 31513 Reportabic Occurrence Report No. 50-366/1980-062.

On April 19,1980, while performing the primary Containsent Isolation System Operability Test, the Drywell was vented thru the 2T48-F323 Torus Vacuum Breaker Valves.

Vacuum Breaker Valve, 2T48-F323E, failed to open when the

/

control switch was actuated.

Tech Spec requirements uere not applicable as' the reactor was in cold shutdown. The failure of a Torus Yacuum Breaker was repetitive, reference Reportable Occurrence No. 50-366/1980-018.

.During this outgge, the air cylinders on the vacuum breater valves, 2T48-F323A thru II, were disassembled and inspected.

They were reastembled using new seals and gaskets. New limit switches were also installed.

Following maintenance on the vacuum breaker valves, a leak rate test was performed on each valve.

prior to performing the leak rate test, personnel disconnected the air supply lines to prevent actuation with the test switch.

When personnel reconnected the 2T48-F323E valve, the Svage-Lock ferrul was not reinstalled. This allowed the air line to come loose and caused the O

valve to fail when acutated from the control room.

The fitting was replaced and the valve was tested satisfactorily.

Public health and safety acre not affected as the reactor was in cold shut-down and the valve would have actuated had a differential existed between the Suppression Chamber and Drywell.

No inherent problems were discovered.during the generic review.