ML19323C986

From kanterella
Jump to navigation Jump to search
Forwards LER 80-062/03L-0
Date released: 12/03/2019 Download: ML19323C986


LER 80-062/03L-0:on 800419,w/reactor in Cold Shutdown,During Primary Containment Isolation Sys Operability Test,Vacuum Breaker Valve 2T48-F323E Failed to Open When Control Switch Was Actuated
ML19323C996
Person / Time
Site: Hatch 
Issue date: 05/06/1980
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19323C996 (2)
Forwards LER 80-062/03L-0
ML19323C985
Person / Time
Site: Hatch 
Issue date: 05/06/1980
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19323C985 (1)