NRC Generic Letter 1984-02

From kanterella
Revision as of 13:26, 4 March 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
NRC Generic Letter 1984-002: Notice of Meeting Regarding Facility Staffing
ML031150521
Person / Time
Site: Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, 05000000, Zimmer, Fort Saint Vrain, Shoreham, Satsop, Trojan, Atlantic Nuclear Power Plant, Skagit, Marble Hill, Crane
Issue date: 01/06/1984
From: Eisenhut D G
Office of Nuclear Reactor Regulation
To:
References
GL-84-002, NUDOCS 8401090221
Download: ML031150521 (2)


J anuary 6, ~984TO ALL APPLICANTS FOR OPERATING LICENSES AND FULL-POWER AUTHORIZATIONSGentlemen:Subject: Notice of Meeting Regarding Facility Staffing(Generic Letter 84-02)We have completed a preliminary analysis of the data submitted in responseto a survey that was initiated in early December 1983. One of the concernsthat emerges from a review of the data is the potential for a limited amountof commercial nuclear power plant operating experience among members of theoperating staff at the time of licensing. This concern has prompted us toarrange a meeting with you where we can discuss the issue in general and giveyou our views on what needs to be done to deal with the various problem areas.The meeting is scheduled for 10:00 AM on January 25, 1984 in the PhillipsBuilding, Room P-118, 7920 Norfolk Ave., Bethesda, Md. 20014. We requestthat at least one, but not more than two individuals, from each utility attendthe meeting. A senior officer responsible for staffing and, if desired, themanager of training would be appropriate representatives.The purpose of the meeting is to inform you of our concern and to share withyou our present thinking on acceptable experience profiles for licensing newplants. We would welcome a general discussion of the issues; no plant-specificpresentations are requested. Follow-on meetings with individual applicantsmay be necessary to discuss plant-specific issues and their resolution.Please advise the NRR Project Manager by January 20, 1984 if you will not beable to attend.Darrell G. Eisenhut, DirectorDivision of LicensingOffice of Nuclear Reactor RegulationJHan :cs HLThompson f ut1/ /84 1/ 4 /84 1 ] /8484010902210o/1- IcUNITED STATESNUCLEAR REGULATORY COMMISSIONX iWASHINGTON, D. C. 20555January 6, 1984TO ALL APPLICANTS FOR OPERATING LICENSES AND FULL-POWER AUTHORIZATIONSGentlemen:Subject: Notice of Meeting Regarding Facility Staffing(Generic Letter 84-02)We have completed a preliminary analysis of the data submitted in responseto a survey that was initiated in early December 1983. One of the concernsthat emerges from a review of the data is the potential for a limited amountof commercial nuclear power plant operating experience among members of theoperating staff at the time of licensing. This concern has prompted us toarrange a meeting with you where we can discuss the issue in general and giveyou our views on what needs to be done to deal with the various problem areas.The meeting is scheduled for 10:00 AM on January 25, 1984 in the PhillipsBuilding, Room P-118, 7920 Norfolk Ave., Bethesda, Md. 20014. We requestthat at least one, but not more than two individuals, from each utility attendthe meeting. A senior officer responsible for staffing and, if desired, themanager of training would be appropriate representatives.The purpose of the meeting is to inform you of our concern and to share withyou our present thinking on acceptable experience profiles for licensing newplants. We would welcome a general discussion of the issues; no plant-specificpresentations are requested. Follow-on meetings with individual applicantsmay be necessary to discuss plant-specific issues and their resolution.Please advise the NRR Project Manager by January 20, 1984 if you will not beable to attend.Darrell G. Eisenhut, DirectorDivision of Licensing.Office of Nuclear Reactor RegulationJAW,. /.- ;,S )Ac)~ \ S / D '

Template:GL-Nav