05000368/LER-1980-070-03, /03L-0:on 801005,control Room Emergency Chiller, 2VE-1B,was Found to Be Inoperable.Caused by Improper Pressure Switch Setting (80 Psig Rather than 150 Psig). Pressure Switch Calibr

From kanterella
Revision as of 18:41, 24 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
/03L-0:on 801005,control Room Emergency Chiller, 2VE-1B,was Found to Be Inoperable.Caused by Improper Pressure Switch Setting (80 Psig Rather than 150 Psig). Pressure Switch Calibr
ML19340B560
Person / Time
Site: Arkansas Nuclear 
Issue date: 11/04/1980
From: Pendergraft R
ARKANSAS POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19340B558 List:
References
LER-80-070-03L, LER-80-70-3L, NUDOCS 8011110289
Download: ML19340B560 (1)


LER-1980-070, /03L-0:on 801005,control Room Emergency Chiller, 2VE-1B,was Found to Be Inoperable.Caused by Improper Pressure Switch Setting (80 Psig Rather than 150 Psig). Pressure Switch Calibr
Event date:
Report date:
3681980070R03 - NRC Website

text

<

l NmC FORM 3C6 U. S. NUCLE An REGULATORY COMMISSION LICENSEE EVENT REPORT EXfilBIT A CoNinot eLoCK: l l l l l l l@

tettAsE entNT on TYPE ALL aEcuinto iNro,1uAtioNi

@ l AlR l Al Nl012 l@isl 0 l0 l -l0 l0 l 0l Oj 0 l-l 0 ]O lgt l1 l 1l1pgl l lg 8 3 uciusas coot u

ucissa =uu*ta 2>

26 uc,-a n,( u se car se COPrT lolil

"$'$ [Lj@l0 l 5 p l01013 l 6181@l1101015 l810 )@l1111014 I 810 l@

s I

8 60 65 DoCaLET Nt.rM6tR tid GJ (VENT DmTE 34 75

  1. 4Po8tl oaf t 80 EVENT DESCRIPitON AND PRO 9ADLE CONSEOUENCES h o 2 l During Mode 1 operation, the control room emergency chiller (2VE-1B) was i iciaii found to be inoperable.

The redundant chiller (2VE-1A) was started and 1 ITTT1 I verified to function properly. This occurrence is similar to LER 50-368/1 o s i 80-054.

Reportable per Tech. Spec. 6.9.1.9.b 1o 1s 11 I

o i I l

o a l I

'ess"

    • ia' sfe^c"$.

su'nUu.

s"Er tc u,ven=tur coot l AI Al@ LE @ LBJ@ l HITIE IX I C]H I@ [CJ@ [Zj@

J 8

O,a,',;,g.,o F vi~,,[..

Li%';'a[

"EN""

kW'

"'"a' "

Lisi0i t_;

10 i7i0i if_;

i 0i si ty t_;

t0; as n

n 2

26 2,

2 n

ao 2

n

' F,n' of3"If"t?,'

novas 6h ^s'J.'=la'

,"Ot*,, '"J"(Ajg l C l'l j8 ), [g O'.," 'n'#"4 J!'!!;r

'"4'e2*o" i 01010 i't)I LNj g

@ g LAJ@LZ_J@ Lzj@

[zj@

3J 34 3h 36 33 4J 41 4) 43 44 gp CAUSE DESCRIPTION AND CORRECilVE ACTIONS h 1 Investication revealed the cooler service water control valve to be i

i o i inoperable due to an imaroper pressure switch setting (80 psig rather i

i i i than 150 psig).

The pressure switch was calibrated and the cooler i

i 2 g i returned to operable status, meeting the requirements of Tech. Spec.

1 3.7.6.1.

i i

'd'.'W!s' or,.c sierus @

~

T,fsst??'

[Aj@l Control Room Indication @

uo.ca o.scovin<orsco,,no.,

LEj@ 1110101@l Power Ops.

1 l

i s

's a

' maim, co'0Timr auovur o, crimv @ l t oca no. o,,,c ti e, @

arte.sto or orte.s.

l NA l

LZ_] @ LZ_J l

NA

' ', aso.~.,,'d n@ossis i o

=

ocsco. r.o,@

,,uo.

1010i Ol@[Zj@l NA l

i 7

,r nso~~r'a~,u'Ars a

oisc.n,iio-@

~wn.

101 0101@l NA

.l i

oF 08t D AG TOFAGIUfV Lzj@l NA l

i o NRC USE ONLY

(

Re, Tion tsuff81 NA 1 llllllll[]lll llL 2 o I

8 8 4

68 s.9 30 Rex Pendergraf t 501/968-2519 NauE or rREeAnEn

\\

i 801111'O 2g7 Q