05000334/LER-1980-088-01, /01T-0:on 801126,IE Bulletin 79-14 Review Revealed Low Head Safety Injection Pumps Discharge Relief Lines Overstressed.Cause Unknown.Temporary Mods to Remove Restrictions on Pipe Thermal Expansion Completed

From kanterella
Revision as of 09:38, 24 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
/01T-0:on 801126,IE Bulletin 79-14 Review Revealed Low Head Safety Injection Pumps Discharge Relief Lines Overstressed.Cause Unknown.Temporary Mods to Remove Restrictions on Pipe Thermal Expansion Completed
ML19345D697
Person / Time
Site: Beaver Valley
Issue date: 12/10/1980
From: Lacey W
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19345D690 List:
References
IEB-79-14, LER-80-088-01T, LER-80-88-1T, NUDOCS 8012160488
Download: ML19345D697 (2)


LER-1980-088, /01T-0:on 801126,IE Bulletin 79-14 Review Revealed Low Head Safety Injection Pumps Discharge Relief Lines Overstressed.Cause Unknown.Temporary Mods to Remove Restrictions on Pipe Thermal Expansion Completed
Event date:
Report date:
3341980088R01 - NRC Website

text

U. S. NUCLEA7. REGULAT3RY COMMIS$12N NRC FOR,M 354 (7 778 LICENSEE EVENT REPORT CONTROL 8 LOCK: l l

l l

l l lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATIONI i

loj.tj I P l A I B 17 l s I i [gl o lo l-1 o lo lo l o lo l-lo lo lgp 11 l t i t i t Igl l

Ig I

8 9 UCEhsEE CODE 14 18 UCENSE NuuSER al 29 UCENSE TYPE Jo Si GAf $4 CON-T E

[RCE l L l@l o l 5 l o l o lo l 3 l 3 l4 @l 11 1l 216l 8l 0l@l1 l 2 l1 l 0 l 810 l@

so i

e ao si ooCxty muusER a

es eve %roArE

  1. 4 iS REroRr, oar E EVENT DESCRIPTION AND PR06A8LE CONSEQUENCES h 1a 121 l At 1120 hours0.013 days <br />0.311 hours <br />0.00185 weeks <br />4.2616e-4 months <br /> on November 26 a special investigation being conducted in response col IE Bulletin 79-14 found that an overstressed condition existed on the Low Head

[

pml ITT"Ill Safety Inlection (LHSI) pumps discharge relief lines.

It was determined that a l

Io t si i modification was required to allow the line movement in the direction of thermal l

o 6 l expansion. The plant was at about 35% reactor power when Technical Specification i

o 7 l 3.03 was invoked. Any additional details will be reported in the final IE Bulletin l I

l o is t l 79-14 report.

8o sV8 o'OE sV1 EE TooY seCNE CoupoNENT COOS

~

E foTTI l S l r l@ W@ l A lh l S l U l P l 0 l R I T lh [Bjh l Z l h i

8 9

to si 12 12 18 89 20 stoVENTIAL OCCURRENCE REPORT REVts30M LER EVENTYEAR REPORT NO.

COoE TYPE NO.

@,ay,/Ro 18 10 l l-l l018l81

,l /l 10l1l LTJ L--J l 0l g

_2i 22 a

2 as 27 2s 2s n

si 22 N A oN CNP T

u MouRs 22 s$ shin pon s.

svPpL uANUF C RER lF [gl2Zl@

lZl@

W@

l0l010l l

[]Jg [2NJg l42 Zlg lZ l9 l9 l9 [g 22 as 26 si 4o

.i a

er CAUSE OESCRIPTION AND CORRECTIVE ACTIONS l i g o ; I No cause description is known at this time.

Immediate steps were taken directing

(

how to operate the LHSI pumps in the event of an accident and to remove t

i i l restrictions on pipe thermal expansion. These steps were designed to ensure a safe,

,,,,,g At 1235 hours0.0143 days <br />0.343 hours <br />0.00204 weeks <br />4.699175e-4 months <br />

,,, g j system condition until permanent modifications could be completed.

on November 26, tliese modifications were verified as complete.

,,,,,g Bo i

8 9

$T

  • % power oTHER$rATUS Das o R oISCovERY OEsCRIPTION Ii is l l F lh 10 l 3 l 5 lhl N/A l

l C Ihl Special investication l

'5 a

8a

  • JT,y,r.

Care.T 7

soCAriou os RnE AsE @

AmouuT os Activery @ I aELEasto or anEasE N/A l

N/A l

U_li] L:J @ LzJ@SEs l

,ERso~~d E..os oEsCRieriew h nuueEn tves l

t i l 71 l o l o l o l@l z l@l N/A

,ERso~~E't ~u2Es Esca.,rio~@

su

.E.

I li l 41 l o l o l o l@l N/A to i

4 9 it

'2 to'.s os CR oauaCE to FACILiry

  • iv*E CE sca.ortoN lZl@l N/A l

i,

so 7

8 9

'O fgRC USE ONLY ITT'OUd@c'Ese..riou@

,ssd"*

l N/A I

IIII!IIIIIIIl}

68 69

80. ;

I 4 3 10 acey PHONE:

NAME OF PREPARER 801 a 1 e o$h

b t

i e

Attachment To LER 80-88/01T i

Beaver Valley Power Station i

Duquesne Light Company Docket No. 50-334 I

~

No further information is available or needed to satisfy the reporting requirement.

i I

1 l

4 a

e 1

I i

l i

I 1

+

e i

i i

h 1 -

e I.

- = -

.-~

m..-

-.. _,..._ _. _,--,,,,... _,.,.,..,,,_.-..~,.,,-...-,.. -.,,-...- _,.,-..-,,,, -.--.-_ _ -, -..