05000324/LER-1981-033-03, /03L-0:on 810224,diesel Unavailable Annunciator Received for Diesel Generator 4.Caused by Diesel Jacket Water Heater Power Supply Contractor Stuck in Energized Position,Resulting in Jacket Water Temp Over Setpoint

From kanterella
Revision as of 20:42, 23 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
/03L-0:on 810224,diesel Unavailable Annunciator Received for Diesel Generator 4.Caused by Diesel Jacket Water Heater Power Supply Contractor Stuck in Energized Position,Resulting in Jacket Water Temp Over Setpoint
ML19350C733
Person / Time
Site: Brunswick 
Issue date: 03/24/1981
From: Pastva M
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19350C723 List:
References
LER-81-033-03L, LER-81-33-3L, NUDOCS 8104060642
Download: ML19350C733 (2)


LER-1981-033, /03L-0:on 810224,diesel Unavailable Annunciator Received for Diesel Generator 4.Caused by Diesel Jacket Water Heater Power Supply Contractor Stuck in Energized Position,Resulting in Jacket Water Temp Over Setpoint
Event date:
Report date:
3241981033R03 - NRC Website

text

U. S. NUCLEAR REGULATORY COMMISSION NRC PC.

366 (7.7 71 LICENSEE EVENT REPORT CONTROL BLOCK: l l

l l

l l lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION)

~

foTil l N l C l B l E lP l 2l@l 0 l Ol -l O l 0 l 0 l 0 l O l - l O l 0 l@l 4 l 1 l1 l1l1l@l si.AT ;d @

l l

7 e s ucENsEE ccoE i4

S uCEssE Nuveta a

2.

uctsst rvPE a lalil y,'f,"cj l L @ l 0l 5l 0l -l 0l ?! 214 @l 01212 l 4l 8l 1l@l 01312l 4l S l 1l@

CON'T le 7S REPQRT D ATE 60 64 69 EVENT D ATE 60 61 OOCK ET Nove E R 7

6 EVENT OESCRIPTION AND PROS ABLE CONSEQUENCES h ITTTI I hile performing normal RTGB surveillance, a " Diesel Unavailable" annunciator was I

W An iC=ediate investigation of the annunciator j

g ; received for No. 4 diesel generator.

h jacket water temperature.

]

g l revealed that the diesel had a local lockout due to hAi go,33 ;The No. 4 diesel generator was then declared inoperable in accordance with technical l

goggy l specifications. This event did not affect the health or safety of the public.

1

~~'

I o 7 i

g, Technical Specifications 3.8.1.1, 6.9.1.9b l

s.%'aE s2ME

  • en"
  • ^i!

s!!Ci'E Cov,o~ENT Coot Cc lE lE l@ y@ l Bl@ lC lKlT lB lR lK l@ y@ ]@

o 9 7

8 9

10 11 12 13 18 19 20 REVISION SEQUENTIAL OCCUR R ENCE REPORT LER RO EVENTYEAR REPORT NO.

CCCE TYPE No.

O sf.gg l8l11 l-l l0l3l31 l/]

10 13 ]

I t!

[-j l0 l a

_3, a

u 3

u u

n n

u 2,

n N A 7 C ~

T VE

= CURS 39 t 8C#

8.

5 **L E MANUFACT RER lA igl Z j@

lZ l@

l Z l@

l0I0l010l l Y l@

l Y l@

lNl@

l G l 0 l 5 l 0 l@

3J 34 M

36 3?

40 el 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h l

I g lThe diesel jacket water heater oower supoly contactor had stuck in the enereized

'l position and caused the iacket water tecoerature to exceed the diesel hich temoerneure 1 i i The contactor was replaced and the heater observed for preoer I

g l lockout setpoint.

The diesel was then satisfactorily tested for l

g ] operation and declared operable.

I l

g loperability and returned to normal availabilitv.

a0 DISCOVERY 0ESCRIPTICN h 7

ae

'sTh 4 power OTHERSTATUS OtSCO Y

NA l

lAl@l Operational Event l

y @ l0]Ol0l@l i s l

ACTivlTV CO TENT LOCATION OF RELEASE AMOUNT oF ACTIVITY l

l RELEASED @OF RELEASE lZl@l NA l

l NA y

i 6

,ERsoNNEL ExPosuSEs oEsCR, Tion @

l Nuv.m Tv,E NA

]O l 0 l0 l@l Z l@l i 7

,ERso~~E'L imu'4Es otsCR, Tion @

l

~uo.E R NA l01010 l@l i x 80 7

8 9 11 12 LOSS OF OR O& MAGE TO FACILITY l

TYPE

DESCRIPTION

NA (Z_J@l

9 7

8 9 to NA l

llllllll]l l!lj D

R t* TION ISSUEf8l E (N

2 o 68 69 80 3 919-457-9521 i

NAME OP PREPARER l 810 4 o e o(oq's

o

~

LER ATTAC10fENT - LER NO. 2-81-33 Facility: BSEP Unit No. 2 Date:

2-24-81 An investigation of the problem revealed that the General Electric Model No. CR206E000AAFN, 480V, ND!A size 3 contactor was energized at a tem-perature greater than the high temperature lockout. Manual operation of this contactor determined that it was extremely difficult to operate. This contactor was replaced and the system returned to normal. The defective contactor was disassembled and inspected in an attempt to determine the cause for its stiffness. A thorough inspection could not determine a cause for this event. The contactors on the remaining three diesel generators were tested and found to operate satisfactorily. This is considered an isolated event.

-~

- e

$m We m-e me.