Text
.
warg
,
C
UNITED STATES
,
~
8'
NUCLEAR REGULATORY CCMMISSION
o
A
REGION 11
"
101 MARIETTA ST., N.W.. SUITE 3100
ATLANTA, GEORGIA 30303
NAR 2 71981
Tennessee Valley Authority
ATTN:
H. G. Parris
Manager of Power
500A Chestnut Street Tower II
\\
Chattanooga, TN 37401
Gentlemen:
Subject: Report Nos. 50-327/81-12 and 50-328/81-09
This refers to the routine inspection conducted by S. D. Butler of this office on
February 1 - March 5,1981, of activities authorized by NRC Operating 1.icense
Nos. DPR-77 and CPPR-73 for the Sequoyah facility. Our preliminary findings were
discussed with J. M. Ballentine or members of his staff at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection raport.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A.
In accordance with Section 2.790 4f the NRC " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, .. copy of this letter and the enclosed inspec-
tion report will be placed in the: NRC Public Document Room.
If this report
contains any information that you believe to be proprietary, it is necessary that
you make a written application within 20 days to this office to withhold such
information from public disclosure. Any such application must include the basis
for claiming that the information is proprietary and the proprietary information
should be contained in a separate part of the document. If we do not hear fiom
you in this regard within the specified period, the report will be placed in the
Public Document Room.
l
8106100634-
-
._
.
.
.
--
.
__
- ,
.
-
-
-
.
.
4
Tennessee Valley Authority
2
RUWt2 7 ggg
1
j
Should you have any ques'tions concerning this letter, we will be glad to discuss
'
them with you.
Sincerely,
.
!
C
w
ing Director
Division of Resident and
Reactor Project Inspection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos.
50-327/81-12 and 50-328/81-09
cc w/ enc 1:
H. J. Green, Division Director
G. G. Stack, Project Manager
J. M. Ballentine, Piant
Superintendent
J. F. Cox, Supervisor, Nuclear
Licensing Section
M. J. Burzynski, Project Engineer
H. N. Culver, Chief, Nuclear Safety
Review Staff
'e