05000334/LER-1980-031, Updated LER 80-031/01T-1:on 800521,total Loss of Residual Heat Removal Occurred When Valves Autoclosed.Caused by False High Pressure Signal.Vent Valve Weld Leak Repaired

From kanterella
Revision as of 02:46, 23 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Updated LER 80-031/01T-1:on 800521,total Loss of Residual Heat Removal Occurred When Valves Autoclosed.Caused by False High Pressure Signal.Vent Valve Weld Leak Repaired
ML20008E231
Person / Time
Site: Beaver Valley
Issue date: 10/17/1980
From: Lacey W
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20008E226 List:
References
LER-80-031-01T, LER-80-31-1T, NUDOCS 8010240441
Download: ML20008E231 (2)


LER-1980-031, Updated LER 80-031/01T-1:on 800521,total Loss of Residual Heat Removal Occurred When Valves Autoclosed.Caused by False High Pressure Signal.Vent Valve Weld Leak Repaired
Event date:
Report date:
3341980031R00 - NRC Website

text

_

10.

~

Report Dated 6/4/. NQCLEA3 RE2ULATCRY COMMISSION Us NaC Kam ase 80 rim Updata Rspart - Previou)

LICENSEE EVENT REPORT l

ieLEast pa:Nr on TveE au. aEcuiaEo iNeon=4 riom CoNraot sloCx: I I

I I

I I

i ITTTl i P l A l 5 l V l 5 l 1 l@l 0 l 0 l-l 0 l0 l 0 l 0 l 0 l-l0 l 0 l@l4 l1 l1 l1 l 1 l@l l

l si car se @

i 8 9 UCth8et Coog is 18 uCENSENumesm 24

s uCENSE Tveg 40
- CCN'T loIil l'*No I t @l 0 I 510 l 010 i 313 l4 QI OI 5; 21 li al 0@l1 1011 l 7 l 8 l 0 l@
  • i8 60 Se ooCKET Nuustm 64 49

'avtNroAfg 74 7S AtPoAr oATE 80 EVENT DESCMIPTION ANO PMo8ASLE CONSEQUENCES Oio l Upon finding a tenking Residual IIcat Remove.1 (RHR) System vent valve weld, an l

lo l 2l lT771lcvolution was commenced to reenergize the RHR iso 1'ation valves to permit rapid g

ITTT1 I isolation can ibility in case of a gross failure. A total loss of RER occurred when,

lthe" valves auto-closed due to a false high pressure signal from a deenergized i

io esl lo,s1Ichannel. Safety 2 plications were minimal since the leakage was contained and Che

[

[TTTl l system was capable of total isolation.

[

I lo is t i so E

E CoMPCNENT CooE SUS E

SU t

I cl Fl@ Lx,,j@ l z l@ l z i z i z i z i z l z i@ l x i@ l z ! @

laist 7

8 9

10 li i2 i2 te i9 20 SEQuGNTIAL oCOURRENCE RfMMiT REV'S8cN LER/mo CVENTYEAR REPORT No.

CooE TYPE No.

Oi7 l8 l0 l 8

l 0 l 3 l 1l

,y l0l1l lTl j

_l J

a ar zi 22 22 2s 27

s as 20 si 22 C
  • T E1.to MouRS SUS FoM 8.

SUP UE MANuF REM l B l@(,,z,,j@

lzl@

lzl@

l Oi 0l 0l 0l Q@

l N[@

lz l@

I z l 9 l 9 l 9 [g 24 23 24 27 40 ai 42 43 de 47 22 CAUSE oESCMiPTION ANO CORRECTIVE ACT10NS O27

,,,o,lThe RHR isolation valves closed due to a false high pressure signal. The vent valve,

g Iweld leak vas repaired and the system returned to service. An engineerin

iew I

g ]has been done of the RHR and Safety Injection vent and drain installations and l

g l necessarv supports have been added.

l I

mi h uY ofwensTArus @ E oN N vowen oescovanY es5CnierioM IiI5l W @ l0l0l0l@l Design l

lAl@lOperatorobservation l

8,jny,,,

e,'ETNT

$ !afr,e "'*@" "

tocarioN on metsass @

7 anuAsso on aet Ase AmouNros ACriviry li Isl W @ J@l N/A l

l N/A l

7 8 9 to i.

44 44 30 PenSoNNEL EXPOSURES Nuwetm TYPE otSCRIPTICM I W 1010101@lzi@l N/A i

N.",,uu'ais me:Cni,rioN@

Nu..

l,,LL!,,1101010l@l N/A l

. 2 ii i

,o

    • .*' ** **",'Ne'N* '" " @

[,l l 9 I l z l@l N/A 4 9 10

,o

,,,u,'"@lo','7C.,, Tion @

NRC USE CNLY N/A l

llllllll1lll l{

Q'WTO 241 f'/r/-

2 o 4

"5 412-643-8525

_g W* S* EdC'?

pNaNE:

NAuf o p=EpanEn

s.

Attachment To LER 80-31/01T-1 Beaver Valley Power Station Duquesne Light Company Docket No. 50'334 The engineering review package of modifications is available but is too lengthy to include in this report.

e 9