/03L-0:on 810610,reactor Bldg to Torus Vacuum Breaker Isolation Valve 2T48-F310 Failed Open.Caused by Sticking Switch Reset.Switch Cleaned,Lubricated & Tested
ML20009F619
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 06/30/1981
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20009F608 List:
References
LER-81-051-03L-01, LER-81-51-3L-1, NUDOCS 8107310358
Download: ML20009F619 (2)


LER-1981-051, /03L-0:on 810610,reactor Bldg to Torus Vacuum Breaker Isolation Valve 2T48-F310 Failed Open.Caused by Sticking Switch Reset.Switch Cleaned,Lubricated & Tested
Event date:
Report date:
3661981051R03 - NRC Website

text

7'".76 LICENSEE EVENT REPORT coa 5VROL 8 LOC %: l l

l l

l 1

lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATICN) e I i l l G I A I E l I l H l 2 l@[0 l0 l-l0 l0 l0 l0 10 l-l0 10 l@l 4 l 1 l 1 l ll 11@l l

l@

8 9 LICENSEE CODE 14 15 '

LICENSE NUMBER 25 26 LICENSE TYPE JO 57 CAT 58 olil lo RC l L l@l 0 l 5 l 0 l 0 l0 l 3 16 l6 }@g 16 Il 10 l8 11 l@l01613101811l@

orr EO 8

60 61 COCKET NUMBER 68 69 EVENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBA8LE CONSEQUdNCES h While the plant was in steady state operation at 2400 MWt, Reactor Build-oJ } [_

ing to Torus Vacuum Breaker Isolation Valve, 2T48-F310, failed open. Tech l

g33 l Specs 3.6.3 requires that Primary Containment Isolation Valves be operable.

I o141 1 Redundant Reactor Building to Torus Vacuum Breaker Isolation Valve, 2T48-l o Isl l l

Neither plant operation nor public health and safe-l J o is l l F311, was operable.

l This is a repetitive event as reported on Renortable l

lol7}l ty were affected.

Occurr ve Report No. 50-366/1981-035.

I 0m,;

DE ODE SUSC E COMPONENT CODE SUSCODE SU E

tit}

l S 10.j@ IE l@ lE l@ l : l NI S l T l R l U l@ I S l@ l Z l @

8 9

10 11 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION VENT YEAR REPORT NO.

CODE TYPE N O.

@ yu'ER/ROa E llSlil l-l i 0151 11 l/l 1013l lL l l-l 10l L

L.,,21 22 23 24 26 27 28 29 30 31 32 A N AC ON ON PL NT ME HOURS S8 IT FOR b B.

E UPPLIE MA UF CTURER l El@l Zl@

l Zl@

l Zi@

l 01 Ol 0! O f I Yl@

L"jQ lAl@

lSl3l8l2l@

33 34 35 36 31 40 41 42 43 44 47 CAUSE DESCRIPTION AND COR AECTIVE ACTIONS The cause of the event has been attribtued to Reactor Ruildina to Torus I

Iilo1 I li li i i Differential Pressure Switch. 2Ta8-N210.

The failure was due to the I

switch reset stickina. The switch was cleaned, lubricated and functionally I

l i 6 21 I l

li13l l tested satisfactoril y.

l li l41 I 80 ST JS

% POWER OTHER STATUS OtS O RY DISCOVERY DESCRIPTtON l i l 5 l [,E,j@ l 0l 91 8l@l NA l

l A l@l Operator observation l

'8 8

COTTENT ACTIVITY RELEASED OF RELEASE AMOUNT OF ACTIVITY LOCATION OF RELEASE NA l

l NA l

Ii 16 l l Z l @ l Zl@l PERSONNEL EXPOS ES NUMBER TYPE

DESCRIPTION

NA l

li 171 l 0 l 0 id@lZl@l eRSO iN;uWiES P

NUM86.

DESCRIPTION

li la l l O l 0 l

,@l NA l

80

'7 8 9 41 12 LOSS OF OR OAMAGE TO FACILITY TYDE

DESCRIPTION

li 191 l Z [@l NA l

80 7

8 9 10 NRC UsE ONW DESCRIPTION h8107310358 810630 PDR ADOCK 05000366 l

llllll(([f(ll3 I 2 l a l l N f@l

,SsV E 80i S

PDR 68 s9 7

8 9 10 R. T. Nix, Supt. of Maint.

pgayg; EW-N

{

m w egg

e LER No.:

50-366/1981-051 Licensee:

Georgia Power Company Facility:

Edwin I. Hatch Docket No. :

50-366

Narrative

Report i

for LER 50-366/1981-051 On June 10, 1981, while the plant was.in steady state operation at 2400 PWt, Reactor Building to Torus Vacuum Breaker Isolation Valve, 2T48-F310, failed Tech Specs 3.6.3 requires that Frimary Containment Isolation Valves open.

be ope"able.

Redundant Reactor Building to Torus Vacuum Breaker Isolation Valve, 2T48-F311, was operable.

Neither plant operation nor public health and safety were affeuted.

This is a repetitive event as last reported on Reportable Occurrenc t Report No. 50-366/1981-035.

4 The cause of the event has been attributed to Reactor Building to. Torus Differential Pressure Switch, 2T48-N210.

The failure was due to the switch, 2T48-N210.

The failure was due to the switch reset sticking.

The switch was cleaned, lubricated and functionally tested satisfactorily.

A generic review revealed no inherent problems with this type switch.