05000213/LER-1981-014, Forwards LER 81-014/03L-0

From kanterella
Revision as of 14:39, 20 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 81-014/03L-0
ML20031B051
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 09/14/1981
From: Graves R
CONNECTICUT YANKEE ATOMIC POWER CO.
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20031B052 List:
References
NUDOCS 8109280538
Download: ML20031B051 (1)


LER-1981-014, Forwards LER 81-014/03L-0
Event date:
Report date:
2131981014R00 - NRC Website

text

e 9

CONNECTICUT YANKEE AT O M IC POWER COMPANY j

HADDAM NECK PLANT RR # 1. BOX 127E. EAST H AMPTON CONN. 06424 September 14, 1981 Y'

kO^

[

b[?

U. S. Nuclear Regulatory Commission Region 1 c

c.

{__ I Office of Inspection and Enforcement 2

h#

p 631 Park Avenue U

King of Prussia, Pennsylvania 19406

' D) df

% p%, '

(a Attn:

Mr. Ronald C. Haynes,

\\^,ff,

~

Director

'./g,

Reference:

Facility Operating License No. DPR-61 Docket No. 50-213 Reportable Occurrence LER 81-14/3L

Dear Mr. Haynes:

This correspondence forwards the Licensee Event Report for Reportable Occurrence LER 81-14/3L, required to be submitted within 30 days pursua.. to the requirements of Connecticut Yankee Technical Specifications, Section 6.9.2.b(2).

An additional three copies of the report arc attached.

Very truly yours, O%

Richard H. Graves Station Superintendent RHG:JHF/jhb Attachment LER 81-14/3L cc:

Dir., Office of Inspection and Enforcement, Washington, D. C.

(30)

Dir., Of fice of Management Info. & Program Control, Wash., D. C.

(3)

USNRC c/o Document Management Branch, Washington, D. C.

(1)

CGWk 3

/ll P'09280538 810914 FDR ADOCK 05000 S