05000213/LER-1981-004, Forwards LER 81-004/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 81-004/03L-0
ML19345H600
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 05/18/1981
From: Graves R
CONNECTICUT YANKEE ATOMIC POWER CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19345H601 List:
References
NUDOCS 8105210349
Download: ML19345H600 (1)


LER-1981-004, Forwards LER 81-004/03L-0
Event date:
Report date:
2131981004R00 - NRC Website

text

-

s

'4 1

CONNECTICUT YANKEE ATOMIC POWER COMPANY C' '\\

HADDAM NECK PLANT RR #i. BCX 127E. EAST HAMPTON, CONN. 06424 May 18, 1981 I

p U. S. Nuclear Regul-tory Cot: mission

/f Region 1 W

g Office of Inspection and Enforcement Q'

g\\g#

631 Park Avenue King of Prussia, Pennsylvania 19406 j

~ Attn: Mr. Boyce Grier, 4 Director ,, os, 3 y Reference: Facility Operating License No. DPR-61 / Docket No. 50-213 Reportable Occurrence LER 81-04/3L

Dear Mr. Grier:

This correspondence kaards the Licensee Event Report for Reportable Occurrrence LER 81-04/3L, required to be submitted within 30 days pursuant to the requirements of Connecticut Yankee Technical Specifications, Section 6.9.2.B(3).

Late submission of the report is due to having performed an engineering This revi-w review to determine if equipment changes are warranted.

was not completed until thy 13, 1981. The NRC Resident Inspector was provided the status of the report on that date.

An additional three copies of the report are attached.

I Very truly yours,

  1. W l

Richard H. Graves Station Superintendent l

RHG:F2T/jhb Attachment: LER 81-0 4/3L i

(30)

Dir., Office of Inspection and Enforcement, Washington, D. C.

cc:

Dir., Office of Management Info. & Program Control, Wash., D. C. (3)

(1)

USNRC c/o Locument Management Branch, Washington, D. C.

\\s 8105210 M (