ML20031F878

From kanterella
Revision as of 13:04, 20 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Potential Significant Deficiency Rept Re Seismic Design Analysis Review for Suppression Chamber,Initially Reported 810904.Licensee Currently Reviewing Deficiency.Completion Expected by 811106
ML20031F878
Person / Time
Site: Hope Creek  PSEG icon.png
Issue date: 10/01/1981
From: Martin T
Public Service Enterprise Group
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8110200506
Download: ML20031F878 (1)


Text

p.3S %

Thomas J. Martin Public Service Electric and Gas Company 80 Park Plaza Newark, N.J. 07101 201/4304316 Vice Presdent Engineering and Construction October 1, 1981 l

~

,/Q r b#

'e~'

,a

,i ss) v - >[r/j/

~

N L Mr. Ronald C. Haynes, Director w,

b 007 f p, 4 U.S. Nuclear Regulatory Commission s

O Cp Office of Inspection and Enforcement 4 gh*e,gJggI4.')

Region 1

~

~

  • N %r 631 Park Avenue L

s King of Prussia, Pennsylvania 19406 8

i O

p Dear Mr.

  • 1es:

01 POTENTIAL SiGNIFICANT CONSTRUCTION DEFICIENCY SUPPRESSION CHAMBER SEISMIC ANALYSIS NO. 1 AND 2 UNITS (50-354/355)

HOPE CREEK GENERATING STATION On September 4, 1981, a verbal report was made to Region 1, Office of Inspection and Enforcement representative, Mr.

E.

Greenman, advising of a potential significant con-struction deficiency.

The reported potential deficiency concerns seismic design analysis review for the suppression chamber.

Specifically, the action of the water mass in the chamber if a seismic event occurs in a post accident condition with.the chamber completely filled with water.

The following supplemental information is submitted in ac-cordance with the requirements of 10CFR50.55(e).

PSE&G is currently reviewing this concern to deterrine I

reportability per the requirements of 10CFR50.55(e).

This I

assessment is scheduled for completion November 6, 1981, at which time a report will be made to the NRC.

Very truly yours, f'71&

110200506 8i1O01

~

(SDRADDCr,OSOOOggg.

CC:

Office of Inspection and Enforcement Division of Reactor Construction Inspection 1/

Washington, D.C.

c1% D NRC Resident Inspector - Hope Creek P.O.

Box 241

.Hancocks Bridge, N.J.

_ _ _ - _ _ _ _ _ _ _ _ - _ _