05000334/LER-1981-100, Forwards LER 81-100/03L-0

From kanterella
Revision as of 00:08, 20 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 81-100/03L-0
ML20039C063
Person / Time
Site: Beaver Valley
Issue date: 12/16/1981
From: Williams H
DUQUESNE LIGHT CO.
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20039C064 List:
References
BVPS:HPW:458, NUDOCS 8112280368
Download: ML20039C063 (2)


LER-1981-100, Forwards LER 81-100/03L-0
Event date:
Report date:
3341981100R00 - NRC Website

text

.

3 1116 pi ) 4S6000 Pittsbu gh, Pa r

'W DUQUESNE LIGHT COMDANY Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077 December 16, 1981 BVPS:HPW:458 Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 LER 81-100/03L g s \\_ L h h <%f7

.y b

pq,: y Mr. R. C. Haynes, Director N l/r..

631 Park Avenue

' Ecg /Sg7A

'7 United States Nuclear Regulatory C7mmission p'

1 Region 1 j;

3 King of Prussia, Pennsylvania 19406 6

q'

,e

\\,

,s

/

Dear Mr. Haynes:

\\

p In w cordance with Appendix A, Beaver Valley Technical Specifications, the follevi"d Licensee Evrat Report is submitted:

LER 81-100/03L, Technical Specification 3.5.4.2 Emergency Core Cooling Systems - Heat Tracing.

Ver truly yours, V,

/

<t H. P. Williams

[

Superintendent Attachment

\\* s 8112280368 811216 PDR ADOCK 05000334 S

PDR

Mr. R. C. Haynes December 16, 1981 BVPS:HFW:458 Page 2 cc:

Director Of Management & Program Analysis United States Nuclear Regulatory Commission Washington, D. C.

20555 J. Hultz, Ohio Edison Director, Office of Inspection and' Enforcement Headquarters United States Nuclear Regulatory Commission Washington, D. C.

20555 D. A. Chaney, BVPS Licensing Project Manager United States Nuclear Regulatory Commission Washington, D. C.

20555 D. A. Beckman, Nuclear Regulatory Commission, BVPS Site Inspector Mr. - Alex Timme, CAPCO Nuclear Projects Coordinator, Toledo Edison Records Center, Institute of Nuclear Power Operations, Atlanta, Georgia G. E. Muckle, Factory Mutual Engineering, Pittsburgh Arthur Alford, Stone & Webster / Boston