Forwards IE Insp Repts 50-348/82-13 & 50-364/82-12 on 820416-0515 & Notice of Violation
ML20058G563
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 06/14/1982
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20058G532 List:
References
NUDOCS 8208030361
Download: ML20058G563 (2)


See also: IR 05000348/1982013

Text

-

.<

.

.

N lDLD

JUN 1 4 1982

Alabama Power Company

ATTN: Mr. R. P. McDcnald

Vice President-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

l

'

Gentlemen:

Subject: Report Nosh 348/8 hand 50-364/82-12

This refers to the routine safety inspection conducted by Mr. W. H. Bradford of

this office on April 16 - May 15, 1982, of activities authorized by NRC Operating

License Nos. NPF-2 and NPF-8 for the Farley facility. Our preliminary findings

were discussed with Mr. W. G. Hairston, Plant Manager, at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements.

This item and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

Appendix A.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of tha date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

of this letter.

Such application must be consistent with the requirements of

2.790(b)(1).

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

f

'

R. C. Lewis, Director

Division of Project and

Resident Programs

!

Enclosures: (See page 2)

,

!

8208030361 820723

PDRADOCKOS000g

l

i

G

L

.

.

..

.

.

Alabama Power Company

2

JUN l'41982

Enclosures:

1.

Appendix A. Notice of Violation

2.

Inspection Report Nos. 50-348/82-13

and 50-364/82-12

,

1

cc w/ encl:

W. O. Whitt, Executive Vice President

F. L. Clayton, Jr. , Senior Vice President

H. O. Thrash, General Manager-Nuclear Generation

0. D. Kingsley, Jr., Manager, Nuclear Engineering

and Technical Services

J. W. McGowan, Manager-Safety Audit

and Engineering Review

W. G. Ware, Supervisor-Safety Audit

and Engineering Review

W. G. Hairston, III, Plant Manager

bec w/ encl:

NRC Resident Inspector

Document Management Branch

)

State of Alabama

.

,

hie t

s

,c

&ft

"c pv /*2

RII

RI

RII

RII

R

WBradford:dt

JRogge

VBrownlee

HCDance

L is

5/ /82

5/ \\/82

u,

5/g\\ /82

5/, /82

82

. .

-

.

_ . -