Responds to NRC Re Violations Noted in IE Insp Repts 50-348/82-13 & 50-364/82-12.Corrective Actions: Containment Spray Suction Valves from Refueling Water Storage Tank Opened & Personnel Counseled
ML20058G539
Person / Time
Site: Farley  
Issue date: 07/07/1982
From: Clayton F
ALABAMA POWER CO.
To: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20058G532 List:
References
NUDOCS 8208030356
Download: ML20058G539 (2)


Text

r 1

\\

M;il!ng Addr;ss

/

Alabama Power Company 600 North 18th Street Post Off:ce Dox 2G41 Birmmgham. Alat'ama 35291

N O U !

! $ II Telephoon 205 783-6081 t'

F. L Clayton, Jr.

b Senior Vice President gg ()

Flintodge Duildmg qry 9; ;

a 8 10 e

ne svu.u.cn racee s, stem July 7, 1982 Docket Nos. 50-348 50-364 Mr. R. C. Lewis U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N.W.

Suite 3100 Atlanta, Georgia 30303

Dear Mr. Lewis:

RE:

J. M. Farley Nuclear Plant NRC Inspection April 16 - May 15, 1982 Report Nos. 50-348/82-13 and 50-364/82-1 [

This letter refers to the violation in the subject inspection re-port which states:

"As a result of the inspection conducted on April 16-May 15,1982, and in accordance with the NRC Enforcement Policy, 47 FR 9987 (March 9, 1982), the following violation was identified.

Technical Specification 6.8.1.a requires that written pro-cedures shall be established and implemented. Adrinistra-tive Procedure No. 16 " Conduct of Operation - Operations Group" states that plant procedures shall be adhered to in the conduct of all plant operations.

Contrary to the above, on May 10, 1982 plant procedure FNP-1-ARP-1 " Annunciator Response Procedure" for annuncia-tor alarm " Monitor Light Box, Engineered Safety System (ES$)

Valves off-normal position" on the main control board was not utilized to determine which ESS valves were in the off-normal position. This resulted in the centainment spray system being inoperable for six hours and fif ty-five minutes."

Admission or Denial The above violation occurred as described in the subject report.

Reason for Violation The violation was caused by personnel error. The alarm (M.L.B.

  1. 2 ESS Valve Of f Normal) was not investigated properly as required by the Annunciator Response Procedure.

Ip -/oA B2C8030356 ago7g3

{DRADOCK05000 iCIAL COPY

l

  • l Mr. R. C. Lewis Page 2 July 7, 1982 Corrective Actions Taken and Results Achieved 1.

The Containment Spray Suction Valves from the Refueling Water Storage Tank were opened.

2.

A verification of all accessible Containment Spray System valves was conducted. No discrepancies were fcund.

3.

This incident has been discussed with all Licensed Operations per-sonnel. The importance of insuring that the correct switches are actuated when placing equipment in service, removing equipment fro +

service or repositioning valves was emphasized. The importance of recognizing which annunciator alarms are acknowledged and correctly interpreting the information given by the alarmed annunciator and the use of the Annunciator Response Procedure was stressed.

4.

Shift personnel involved were counseled concerning their lack of proper follow up action and apparent lack of attention to detail.

Corrective Steps Taken to Avoid Further Violations See items 3 and 4 above.

Date of Full Compliance All corrective action was completed by May 24, 1982.

Affirmation I affirm that this response is true and correct to the best of my knowledge, information and belief.

The information contained in this letter is not considered to be of a proprietary nature.

Yours very truly, k

Y24 62t F.L.blayton, r.

FLCJr/KWM:bhj w

-