SUMMARY
OF OPERATING EXPERIENCE FOR OCTOBER 1993 Initial criticality for Cycle 11 was attained on November 3, 1993 at 1109.
The plant went off-line at 0731 to repair an EHC leak on November 5, 1993.
Return to power took place at 0944 on November 6, 1993.
On November 6 the turbine was taken off-line at 2105 to perform overspeed trip testing.
The l
test failed, repairs were made, and the turbine was returned to service November 8 at 0534.
At 1419, the turbine was taken off-line, the overspeed test was reperformed satisfactorily and the turbine was back on-line at 1705.
l The outage officially ended at this time.
Full power was reached by approxi-mately 2030 on November 13, 1993 and continued for the remainder of the month.