ML20058G903

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Oct 1993 for Palisades Nuclear Plant
ML20058G903
Person / Time
Site: Palisades Entergy icon.png
Issue date: 10/31/1993
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18059A558 List:
References
NUDOCS 9312100174
Download: ML20058G903 (1)


Text

. . -

~

i

SUMMARY

OF OPERATING EXPERIENCE FOR OCTOBER 1993 Initial criticality for Cycle 11 was attained on November 3, 1993 at 1109.

The plant went off-line at 0731 to repair an EHC leak on November 5, 1993. ,

Return to power took place at 0944 on November 6, 1993. On November 6 the turbine was taken off-line at 2105 to perform overspeed trip testing. The l test failed, repairs were made, and the turbine was returned to service November 8 at 0534. At 1419, the turbine was taken off-line, the overspeed -

test was reperformed satisfactorily and the turbine was back on-line at 1705. l The outage officially ended at this time. Full power was reached by approxi- ;

mately 2030 on November 13, 1993 and continued for the remainder of the month.  !

i l

l l

I a ,

F E

9312100174 931203 PDR R ADOCK 05000255 pg

__