Monthly Operating Rept for Oct 1983
ML20086A563
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/31/1983
From: Fields D, Graham D, Westafer G
FLORIDA POWER CORP.
To: Deyoung R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
3F1183-06, 3F1183-6, NUDOCS 8311160016
Download: ML20086A563 (5)


Text

.

+

OPERATING DATA REPORT

~

-O DOCKET NO. 50-302 DATE 11/1/83 COMPLETED BY D-Crnham.

TELEPHONE (904) 7M-6486 OPERATING STATUS

1. Unit Name:

Crystal River Unit #3 Notes

. 2. Reporting Period:

10/1/83 - 10/31/83 2544

3. Licensed Thermal Power (MWt):

890

4. Nameplate Rating (Gross MWe):

825

5. Design Electncal Rating (Net MWe):

850

6. Maximum Dependable Capacity (Gross MWe):

811

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

9. Power Level To Which Restricted,If Any (Net MWe): _.850 approximately
10. Reasons For Restrictions,1f Any:

Evaluating steam flow to HP turbine.

~

This Month Yr..to.Date Cumulative l

11. Hours In Reporting Period 745 7296 58176
12. Number Of Hours Reactor Was Critical 452.7 3910.3 36117.5
13. Reactor Reserve Shutdown Hours 0

0 1280.3

14. Hours Generator On.Line 336.8 3719.3 35186.2 -
15. Unit Reserve Shutdown Hours -

0 0

0

16. Gross Thermal Energy Generated (MWH) 793050 8005395 78530350
17. Grose Electncal Energy Generated (MWH) 276245 2755758 26722375
18. Net Electrical Energy Generated (MWH) 263080 2623308 25368188 p,
19. Unit Service Factor 45.2%

51.0%

60.5%

20. Unit Availability Factor 45.2% 3 51.0%

60.5%

21. Unit Capacity Factor (Using MDC Net) 43.5%

44.3%

55.2%

22. Unit Capacity Factor (Using DER Net) 42;8%

43.6%

52.9%

23. Unit Forced Outage Rate 22.1%

4.2%

24.2%

24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

None

.i

25. -If Shut Down At E.ed Of Report Period, Estimated Date of Startup:

N/A

26. Units in Test Status (Prior to Commercial Operation):

Forecast Aclaieved INITIAL CRITICALITY 1 /14/77.,

INITIAL ELECTRICITY 1/30/77 d

COMMERCIAL OPERATION 3/13/77'.

8311160016 831031 PDR HDOCK 05000302 9[

R PDR (9/77) i

e'+

AVERAGE DAILY UNIT POWER LEVFL O)'

DOCKET NO. 50-302 L

UNIT FLCRP-3 DATE 11/1/83 COMPLETED BY D. Graham TELEPHONE (904) 795-6486 MONTH October 1983 DAY AVERAGE DAILY POWER LEVEL DAY

. 7 RAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

842 17 0

569 2

gg 19 0

0 4

20 0

0 5

21 o

22 157 838 23 0

8 24 848 25 830 0

846 10 26 0

11 27 706 12 0

846 28 0

13 29 862 30 861 820 862 15 3g 806 16 INSTRUCTIONS On this format, list the average J ity unit power levelin MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

O (9/77)

O O

O 1

DOCKET NO. 50-302 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME FLCRP-3 DATE 11/2/83 REPORT MONTH 10/83 COMPLETED BY n_ F4olda TELEPHONE (904) 795-6486 i

e, E

E w

,$?

3 y.E 5 Licensee

,Eg f,

Cause & Corrective No.

Date 5g 2ss Event p

g{

Action to a

H jsg Report #

mU Prevent Recurrence j

i 6

83-26 831001 S

312.7 B

1 N/A CB PUMPXX Shutdown to replace seal packages in B and C RC pumps.

j 83-27 831014 F

8.3 A

4 N/A EB TRANSF Opened output breakers to replace bolting on step up transformer bushing. Reactor maintained critical.

83-28 831017 F

17.8 A

4 N/A IIA TURBIN Reduced power to minimize steam leak on HP turbine. Reactor maintained critical.

l j

83--29 831018 F

87.2 A

4 N/A IIA TURBIN Shutdown turbine to repair steam leak.

Reactor maintained critical.

i.

I i

i 1

2 3

4 F: Forced Reason:

Method:

Exhibit G - Instructions

{

S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG.

j D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & Ucense Examination d

F-Administrative 5

j G-Operational Error (Explain)

Exhibit I - Same Source 19/77)

Il-Other(Explain)

HONTHLY OPERATIONAL

SUMMARY

STATEMENT DOCKET NO. 50-302 UNIT FLCRP-3 DATE 11/2/83 COMPLETED BY D. Fields TELEPHONE (904) 795-6486 MONTH October 1983-

SUMMARY

STATEMENT: The unit was shutdown for the first 14 days of the month to replace two reactor coolant pump seals. The generator was secured for 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> on the day of startup due to an over-heated bushing on one of the step up transformers. The turbine was shut down for 4 days to repair a steam leak on the high pressure flange. Cross electrical generation is being held to 890 MW to evaluate steam flow to the HP turbine.

v

9 Power C O n P O n A T e o se November 7,1983 3F1183-06 Mr. Richard C. DeYoung, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Attn: Document Control Desk s.

Washington, D.C. 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report

Dear Mr. DeYoung:

Attached are twelve (12) copies of the Crystal River Unit 3 October 1983 Monthly Ope rating Report.

This report is submitted in accordance with Technical Specification 6.9.1.6.

Sincerely, o

Gar R. Westafe'r Manager, Nuclear Operations Licensing and Fuel Management AEF/feb Attachments cc:

Mr. 3. P. O'Reilly, Regional Administrator Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900

[t Atlanta, Ga. 30303 i

General Office 3201 Tnirty-fourtn street soutn. P.O. Box 14042, st. Petersburg. Fbrda 33733 813-806-5151