OPERATING DATA REPORT
~
-O DOCKET NO. 50-302 DATE 11/1/83 COMPLETED BY D-Crnham.
TELEPHONE (904) 7M-6486 OPERATING STATUS
- 1. Unit Name:
Crystal River Unit #3 Notes
. 2. Reporting Period:
10/1/83 - 10/31/83 2544
- 3. Licensed Thermal Power (MWt):
890
- 4. Nameplate Rating (Gross MWe):
825
- 5. Design Electncal Rating (Net MWe):
850
- 6. Maximum Dependable Capacity (Gross MWe):
811
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A
- 9. Power Level To Which Restricted,If Any (Net MWe): _.850 approximately
- 10. Reasons For Restrictions,1f Any:
Evaluating steam flow to HP turbine.
~
This Month Yr..to.Date Cumulative l
- 11. Hours In Reporting Period 745 7296 58176
- 12. Number Of Hours Reactor Was Critical 452.7 3910.3 36117.5
- 13. Reactor Reserve Shutdown Hours 0
0 1280.3
- 14. Hours Generator On.Line 336.8 3719.3 35186.2 -
- 15. Unit Reserve Shutdown Hours -
0 0
0
- 16. Gross Thermal Energy Generated (MWH) 793050 8005395 78530350
- 17. Grose Electncal Energy Generated (MWH) 276245 2755758 26722375
- 18. Net Electrical Energy Generated (MWH) 263080 2623308 25368188 p,
- 19. Unit Service Factor 45.2%
51.0%
60.5%
- 20. Unit Availability Factor 45.2% 3 51.0%
60.5%
- 21. Unit Capacity Factor (Using MDC Net) 43.5%
44.3%
55.2%
- 22. Unit Capacity Factor (Using DER Net) 42;8%
43.6%
52.9%
- 23. Unit Forced Outage Rate 22.1%
4.2%
24.2%
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
None
.i
- 25. -If Shut Down At E.ed Of Report Period, Estimated Date of Startup:
N/A
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Aclaieved INITIAL CRITICALITY 1 /14/77.,
INITIAL ELECTRICITY 1/30/77 d
COMMERCIAL OPERATION 3/13/77'.
8311160016 831031 PDR HDOCK 05000302 9[
R PDR (9/77) i
e'+
AVERAGE DAILY UNIT POWER LEVFL O)'
DOCKET NO. 50-302 L
UNIT FLCRP-3 DATE 11/1/83 COMPLETED BY D. Graham TELEPHONE (904) 795-6486 MONTH October 1983 DAY AVERAGE DAILY POWER LEVEL DAY
. 7 RAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
842 17 0
569 2
gg 19 0
0 4
20 0
0 5
21 o
22 157 838 23 0
8 24 848 25 830 0
846 10 26 0
11 27 706 12 0
846 28 0
13 29 862 30 861 820 862 15 3g 806 16 INSTRUCTIONS On this format, list the average J ity unit power levelin MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
O (9/77)
O O
O 1
DOCKET NO. 50-302 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME FLCRP-3 DATE 11/2/83 REPORT MONTH 10/83 COMPLETED BY n_ F4olda TELEPHONE (904) 795-6486 i
e, E
E w
,$?
3 y.E 5 Licensee
,Eg f,
Cause & Corrective No.
Date 5g 2ss Event p
g{
Action to a
H jsg Report #
mU Prevent Recurrence j
i 6
83-26 831001 S
312.7 B
1 N/A CB PUMPXX Shutdown to replace seal packages in B and C RC pumps.
j 83-27 831014 F
8.3 A
4 N/A EB TRANSF Opened output breakers to replace bolting on step up transformer bushing. Reactor maintained critical.
83-28 831017 F
17.8 A
4 N/A IIA TURBIN Reduced power to minimize steam leak on HP turbine. Reactor maintained critical.
l j
83--29 831018 F
87.2 A
4 N/A IIA TURBIN Shutdown turbine to repair steam leak.
Reactor maintained critical.
i.
I i
i 1
2 3
4 F: Forced Reason:
Method:
Exhibit G - Instructions
{
S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG.
j D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & Ucense Examination d
F-Administrative 5
j G-Operational Error (Explain)
Exhibit I - Same Source 19/77)
Il-Other(Explain)
HONTHLY OPERATIONAL
SUMMARY
STATEMENT DOCKET NO. 50-302 UNIT FLCRP-3 DATE 11/2/83 COMPLETED BY D. Fields TELEPHONE (904) 795-6486 MONTH October 1983-
SUMMARY
STATEMENT: The unit was shutdown for the first 14 days of the month to replace two reactor coolant pump seals. The generator was secured for 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> on the day of startup due to an over-heated bushing on one of the step up transformers. The turbine was shut down for 4 days to repair a steam leak on the high pressure flange. Cross electrical generation is being held to 890 MW to evaluate steam flow to the HP turbine.
v
9 Power C O n P O n A T e o se November 7,1983 3F1183-06 Mr. Richard C. DeYoung, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Attn: Document Control Desk s.
Washington, D.C. 20555
Subject:
Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report
Dear Mr. DeYoung:
Attached are twelve (12) copies of the Crystal River Unit 3 October 1983 Monthly Ope rating Report.
This report is submitted in accordance with Technical Specification 6.9.1.6.
Sincerely, o
Gar R. Westafe'r Manager, Nuclear Operations Licensing and Fuel Management AEF/feb Attachments cc:
Mr. 3. P. O'Reilly, Regional Administrator Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900
[t Atlanta, Ga. 30303 i
General Office 3201 Tnirty-fourtn street soutn. P.O. Box 14042, st. Petersburg. Fbrda 33733 813-806-5151