05000275/LER-1992-001, :on 920214,0608,19 & 25,plant Operated Outside of Design Basis Re App R Criteria.Caused by Personnel Error Due to Lack of Attention to Detail.Fire Watches Established, Operators Notified & Design Change Initiated

From kanterella
Revision as of 04:09, 13 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
:on 920214,0608,19 & 25,plant Operated Outside of Design Basis Re App R Criteria.Caused by Personnel Error Due to Lack of Attention to Detail.Fire Watches Established, Operators Notified & Design Change Initiated
ML20101Q563
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 07/08/1992
From: Rueger G, Thierry R
PACIFIC GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
DCL-92-156, LER-92-001, LER-92-1, NUDOCS 9207150008
Download: ML20101Q563 (35)


LER-1992-001, on 920214,0608,19 & 25,plant Operated Outside of Design Basis Re App R Criteria.Caused by Personnel Error Due to Lack of Attention to Detail.Fire Watches Established, Operators Notified & Design Change Initiated
Event date:
Report date:
2751992001R00 - NRC Website

text