ENS 42397
From kanterella
Revision as of 21:19, 1 March 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
ENS Event | |
---|---|
13:00 Mar 8, 2006 | |
Title | 24-Hour Condition of License Report Due to Failure to Submit Ts Required Exposure Report |
Event Description | At 0800 on March 8, 2006, FPL Energy Seabrook discovered a failure to comply with administrative Technical Specification (TS) 6.8.1.2.a. This TS requires submittal of a radiation occupational exposure report by March 1 of each year. On March 8, FPL Energy Seabrook discovered that the report for 2005 had not been submitted and, consequently, failed to meet the March 1st submittal date specified by TS 6.8.1.2.a. This condition is being reported in accordance with the Seabrook Station Facility Operating License, condition 2.G, which requires a 24-hour notification of any violations of section 2.C.(2) of the operating license (FPL Energy Seabrook, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan).
The licensee notified the NRC Resident Inspector. |
Where | |
---|---|
Seabrook New Hampshire (NRC Region 1) | |
Reporting | |
Other Unspec Reqmnt | |
LER: | 05000443/LER-2006-002 |
Time - Person (Reporting Time:+4.43 h0.185 days <br />0.0264 weeks <br />0.00607 months <br />) | |
Opened: | Paul Dundin 17:26 Mar 8, 2006 |
NRC Officer: | Mike Ripley |
Last Updated: | Mar 8, 2006 |
42397 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 42397\u003C/a\u003E - \u003Ca href=\"/Seabrook\" title=\"Seabrook\"\u003ESeabrook\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E24-Hour Condition of License Report Due to Failure to Submit Ts Required Exposure Report\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 42397 - Seabrook\n","link":"","lat":42.89886111111111,"lon":-70.85284722222222,"icon":"/w/images/9/9b/NextEra_Energy_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
WEEKMONTHYEARENS 457382010-02-26T04:15:00026 February 2010 04:15:00
[Table view]Other Unspec Reqmnt Discovery of an After-The-Fact Unusual Event ENS 426842006-06-30T23:49:00030 June 2006 23:49:00 Other Unspec Reqmnt 24 Hour License Condition Report - Main Steam Isolation Valve Inoperable Greater than 4 Hours ENS 426602006-06-22T10:20:00022 June 2006 10:20:00 Other Unspec Reqmnt 24 Hour License Condition Report of Operation in a Condition Prohibited by Technical Specification ENS 423972006-03-08T13:00:0008 March 2006 13:00:00 Other Unspec Reqmnt 24-Hour Condition of License Report Due to Failure to Submit Ts Required Exposure Report ENS 421782005-11-30T08:24:00030 November 2005 08:24:00 Other Unspec Reqmnt Inverter Inoperable for Greater than Allowed Time Per Technical Specifications ENS 418242005-07-07T14:17:0007 July 2005 14:17:00 Other Unspec Reqmnt License Condition Report Due to Exceeding Technical Specification Inoperability Time ENS 415432005-03-29T19:00:00029 March 2005 19:00:00 Other Unspec Reqmnt 24 - Hr Condition of License Report Due to T.S. Not Met ENS 413402005-01-15T05:00:00015 January 2005 05:00:00 Other Unspec Reqmnt Unspecified Requirement ENS 410952004-10-05T22:30:0005 October 2004 22:30:00 Other Unspec Reqmnt One of Two Pressurizer Level Instrumentation Channels Found to Be Inoperable. ENS 408422004-06-25T14:50:00025 June 2004 14:50:00 Other Unspec Reqmnt Plant Exceeded Lco Action Statement Limits 2010-02-26T04:15:00 | |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_42397&oldid=427497"