ENS 40842
ENS Event | |
---|---|
14:50 Jun 25, 2004 | |
Title | Plant Exceeded Lco Action Statement Limits |
Event Description | FPL Energy Seabrook is currently in the action statement for Technical Specification 3.3.3.10 due to the inoperability of both Waste Gas Oxygen Monitors. The Oxygen Monitors are currently functional but inoperable. The action statement requires that grab samples be collected at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. On June 25, 2004 at 10:50 it was recognized that the elapsed time between 2 required samples had exceeded the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> requirement by 30 minutes. Pursuant to the requirements of Facility Operating License No. NPF-86, paragraph 2.G., FPL Energy Seabrook is reporting the late completion of the requirements of an action required by the Station's Technical Specifications. An investigation is being conducted in accordance with the Station's Corrective Action Program.
The NRC Resident Inspector will be notified.
On June 26, 2004, FPLE Seabrook reported to the NRC (event # 40842) that 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> and 30 minutes elapsed between obtaining waste gas system grab samples required by the action statement of TS 3.3.3.10 for inoperable waste gas oxygen monitors. Since the action statement requires obtaining grab samples every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, this condition was considered reportable under paragraph 2.G of the facility-operating license. Following further review of this condition, FPLE determined that the requirements of the action statement were met. The oxygen concentration of the waste gas system was monitored and recorded in station logs within the required 4-hour interval. As a result, FPLE Seabrook is retracting the 24-hour notification of June 26, 2004. The licensee has notified the NRC Resident Inspector. Notified R1DO (Clifford Anderson). |
Where | |
---|---|
Seabrook New Hampshire (NRC Region 1) | |
Reporting | |
Other Unspec Reqmnt | |
Time - Person (Reporting Time:+19.13 h0.797 days <br />0.114 weeks <br />0.0262 months <br />) | |
Opened: | Damon Ritter 09:58 Jun 26, 2004 |
NRC Officer: | Chauncey Gould |
Last Updated: | Jul 2, 2004 |
40842 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 40842\u003C/a\u003E - \u003Ca href=\"/Seabrook\" title=\"Seabrook\"\u003ESeabrook\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EPlant Exceeded Lco Action Statement Limits\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 40842 - Seabrook\n","link":"","lat":42.89886111111111,"lon":-70.85284722222222,"icon":"/w/images/9/9b/NextEra_Energy_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
WEEKMONTHYEARENS 457382010-02-26T04:15:00026 February 2010 04:15:00
[Table view]Other Unspec Reqmnt Discovery of an After-The-Fact Unusual Event ENS 426842006-06-30T23:49:00030 June 2006 23:49:00 Other Unspec Reqmnt 24 Hour License Condition Report - Main Steam Isolation Valve Inoperable Greater than 4 Hours ENS 426602006-06-22T10:20:00022 June 2006 10:20:00 Other Unspec Reqmnt 24 Hour License Condition Report of Operation in a Condition Prohibited by Technical Specification ENS 423972006-03-08T13:00:0008 March 2006 13:00:00 Other Unspec Reqmnt 24-Hour Condition of License Report Due to Failure to Submit Ts Required Exposure Report ENS 421782005-11-30T08:24:00030 November 2005 08:24:00 Other Unspec Reqmnt Inverter Inoperable for Greater than Allowed Time Per Technical Specifications ENS 418242005-07-07T14:17:0007 July 2005 14:17:00 Other Unspec Reqmnt License Condition Report Due to Exceeding Technical Specification Inoperability Time ENS 415432005-03-29T19:00:00029 March 2005 19:00:00 Other Unspec Reqmnt 24 - Hr Condition of License Report Due to T.S. Not Met ENS 413402005-01-15T05:00:00015 January 2005 05:00:00 Other Unspec Reqmnt Unspecified Requirement ENS 410952004-10-05T22:30:0005 October 2004 22:30:00 Other Unspec Reqmnt One of Two Pressurizer Level Instrumentation Channels Found to Be Inoperable. ENS 408422004-06-25T14:50:00025 June 2004 14:50:00 Other Unspec Reqmnt Plant Exceeded Lco Action Statement Limits 2010-02-26T04:15:00 | |