ENS 48812
From kanterella
Revision as of 21:01, 1 March 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
ENS Event | |
---|---|
13:56 Mar 7, 2013 | |
Title | Automatic Reactor Scram on Generator Trip/Turbine Trip |
Event Description | While operating at rated electrical power, a main generator trip and subsequent turbine trip resulted in a reactor scram. The cause of the generator trip is under investigation. All systems operated as expected with no complications. The plant is stable in Mode 3.
The licensee notified the NRC Resident Inspector and the State of Illinois. |
Where | |
---|---|
Clinton Illinois (NRC Region 3) | |
Reporting | |
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation | |
LER: | 05000461/LER-2013-002 |
Time - Person (Reporting Time:+-2.07 h-0.0863 days <br />-0.0123 weeks <br />-0.00284 months <br />) | |
Opened: | Dan Hunt 11:52 Mar 7, 2013 |
NRC Officer: | Pete Snyder |
Last Updated: | Mar 7, 2013 |
48812 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 48812\u003C/a\u003E - \u003Ca href=\"/Clinton\" title=\"Clinton\"\u003EClinton\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EAutomatic Reactor Scram on Generator Trip/Turbine Trip\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 48812 - Clinton\n","link":"","lat":40.17286111111111,"lon":-88.8332,"icon":"/w/images/b/be/Constellation_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | A/R |
Before | Power Operation (97 %) |
After | Hot Shutdown (0 %) |
WEEKMONTHYEARENS 563282023-02-01T05:43:0001 February 2023 05:43:00
[Table view]10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Scram Due to Turbine Trip ENS 541972019-08-03T07:26:0003 August 2019 07:26:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge En Revision Imported Date 8/7/2019 ENS 536982018-10-28T05:00:00028 October 2018 05:00:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram During a Reactor Shutdown ENS 531102017-12-09T19:48:0009 December 2017 19:48:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition, 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Manual Reactor Scram Due to Loss of Division 1 Ac Power to Numerous Components ENS 528002017-06-11T03:56:00011 June 2017 03:56:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Scram Due to Loss of Feedwater Heating ENS 527772017-05-31T01:38:00031 May 2017 01:38:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram ENS 499582014-03-26T00:42:00026 March 2014 00:42:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Scram Due to Loss of Condenser Vacuum ENS 496322013-12-13T23:57:00013 December 2013 23:57:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Trip During Feed Pump Swap ENS 496172013-12-09T02:27:0009 December 2013 02:27:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Manual Scram Due to Loss of Division 1 480 Vac Power Causing Loss of Instrument Air to Containment and Scram Air Header ENS 489742013-04-26T13:55:00026 April 2013 13:55:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Scram Due to Rapidly Decreasing Level in the Ehc Oil Reservoir ENS 488122013-03-07T13:56:0007 March 2013 13:56:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram on Generator Trip/Turbine Trip ENS 474892011-11-29T23:28:00029 November 2011 23:28:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Unit Experienced an Automatic Reactor Scram During a Planned Shutdown ENS 454332009-10-15T10:37:00015 October 2009 10:37:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Scram Due to Reactor Recirculation Pump Trip ENS 439762008-02-11T04:07:00011 February 2008 04:07:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Scram Due to Increasing Reactor Vessel Level ENS 428072006-08-27T22:05:00027 August 2006 22:05:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Reactor Trip Due to Reactor High Water Level ENS 424302006-03-20T10:53:00020 March 2006 10:53:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Main Turbine Trip Caused Reactor Scram ENS 408682004-07-13T21:10:00013 July 2004 21:10:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram Due to Possible Adverse Weather ENS 406042004-03-23T01:31:00023 March 2004 01:31:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Reactor Scram from 93% Power Due to Generator Trip ENS 403682003-12-02T22:58:0002 December 2003 22:58:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Scram Due to Low Reactor Water Feed Pump Suction Pressure 2023-02-01T05:43:00 | |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_48812&oldid=423262"