ML13210A278
From kanterella
Revision as of 19:14, 1 March 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Letter Sequence Withdrawal | |
---|---|
TAC:ME9662, (Withdrawn, Closed) | |
MONTHYEARML12347A3162012-12-12012 December 2012
[Table View]Acceptance Review E-mail, License Amendment Request 12-005 for Revision to Technical Specifications 3.3.1 and 3.3.2 Project stage: Acceptance Review CP-201300927, Withdrawal of License Amendment Request 12-005, Revision to Technical Specifications 3.3.1, Reactor Trip System Instrumentation and 3.3.2, Engineered Safety Feature Actuation System Instrumentation.2013-07-25025 July 2013 Withdrawal of License Amendment Request 12-005, Revision to Technical Specifications 3.3.1, Reactor Trip System Instrumentation and 3.3.2, Engineered Safety Feature Actuation System Instrumentation. Project stage: Withdrawal ML13218A1002013-07-25025 July 2013 Withdrawal of License Amendment Request (LAR) 12-005 Revision to Technical Specifications 3.3.1, Reactor Trip System Instrumentation and 3.3.2, Engineered Safety Feature Actuation System Instrumentation. Project stage: Withdrawal ML13210A2782013-08-0606 August 2013 FRN, Withdrawal of Amendment Request, Revise Technical Specification (TS) 3.3.1, Reactor Trip System (RTS) Instrumentation, and TS 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation Project stage: Withdrawal ML13210A2772013-08-0606 August 2013 Letter, Withdrawal of Amendment Request, Revise Technical Specification (TS) 3.3.1, Reactor Trip System (RTS) Instrumentation, and TS 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation Project stage: Withdrawal 2013-07-25 |
ML13210A278 | |
Person / Time | |
---|---|
Site: | Comanche Peak |
Issue date: | 08/06/2013 |
From: | Singal B K Plant Licensing Branch IV |
To: | |
Singal B K | |
References | |
78 FR 49305; 8/13/2013, TAC ME9662, TAC ME9663 | |
Download: ML13210A278 (3) | |
Similar Documents at Comanche Peak | |
---|---|
Category:Federal Register Notice
MONTHYEARML24031A6342024-09-13013 September 2024
[Table view]Exemption from the Requirements of 10 CFR 50.71(e)(4), Final Safety Analysis Report Update Schedule (EPID L-2023-LLE-0023) - Federal Register Notice ML24136A1362024-07-30030 July 2024 Renewed License - Federal Register Notice ML24130A0012024-05-16016 May 2024 April 2024, Issuance of Multiple Exemptions Regarding Security Notifications, Reports, and Recording Keeping ML24114A3102024-05-0303 May 2024 Monthly (28-Day) Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 14, 2024 ML24074A4332024-04-26026 April 2024 License Renewal Final SEIS-Notice of Availability FRN ML23312A0292023-11-0808 November 2023 Federal Register Notice: Comanche Peak Draft Supplemental Environmental Impact Statement Comment Period Correction ML23237B4412023-09-29029 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Federal Register Notice, Direct and Indirect License Transfer Issuance Order ML23124A0772023-05-17017 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (FRN) ML23039A0532023-02-16016 February 2023 FRN - Comanche Peak Second Notice of Intent to Prepare EIS and to Conduct EIS Scoping ML22299A1792022-12-0808 December 2022 FRN - Comanche Peak Notice of Intent to Prepare EIS and to Conduct EIS Scoping ML22297A0062022-11-28028 November 2022 Notice of Acceptance and Opportunity for Federal Register Notice ML22285A0742022-10-26026 October 2022 LRA - Receipt and Availability FRN ML21147A5192021-06-24024 June 2021 FRN - Notice of Issuance of Multiple COVID-19 Exemptions Regarding Various Parts of 10 CFR Issued in May 2021 ML21060A5962021-03-0909 March 2021 FRN - Notice of Issuance of Multiple COVID-19 Exemptions Regarding 10 CFR Part 26 for February 2021 ML20255A1002020-10-0707 October 2020 Proposed Alternative to the Requirements of the ASME OM Code to Extend the Inservice Test Program Interval for Certain Check and Relief Valves (EPID L-2020-LLR-0061 and EPID L-2020-LLR-0062 (COVID-19)) ML20101P5592020-04-13013 April 2020 Public Notice of Application for Amendment to Facility Operating License ML20035C4082020-02-18018 February 2020 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 02/25/2020 ML20015A0542020-02-14014 February 2020 Federal Register Notice - Individual Notice of Consideration of Issuance of Amendments to Adopt TSTF-513, Revision 3 ML20015A3962020-02-14014 February 2020 Letter - Individual Notice of Consideration of Issuance of Amendments to Adopt TSTF-513, Revision 3 ML19122A1572019-05-15015 May 2019 Federal Register Notice: Comanche Peak Independent Spent Fuel Storage Installation - Environmental Assessment and Finding of No Significant Impact; Issues NRC-2018-0287, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 01/02/20192019-01-0202 January 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 01/02/2019 ML18351A0022019-01-0202 January 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 01/02/2019 ML18295A7442018-10-25025 October 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 11/06/18 ML18276A0262018-10-0404 October 2018 Letter - Renotice Individual 14-day Exigent Notice of Consideration of Issuance of Amendment, Revise TS 3.8.4, DC Sources - Operating, to Modify TS Actions for One Inoperable Battery ML18276A0292018-10-0404 October 2018 FRN - Renotice Individual 14-day Exigent Notice of Consideration of Issuance of Amendment, Revise TS 3.8.4, DC Sources - Operating, to Modify TS Actions for One Inoperable Battery NRC-2018-0205, FRN - Renotice Individual 14-day Exigent Notice of Consideration of Issuance of Amendment, Revise TS 3.8.4, DC Sources - Operating, to Modify TS Actions for One Inoperable Battery2018-10-0404 October 2018 FRN - Renotice Individual 14-day Exigent Notice of Consideration of Issuance of Amendment, Revise TS 3.8.4, DC Sources - Operating, to Modify TS Actions for One Inoperable Battery ML18254A0162018-09-13013 September 2018 FRN, Individual 14-day Exigent Notice of Consideration of Issuance of Amendment, Revise Technical Specification (TS) 3.8.4, DC Sources - Operating, to Modify TS Actions for One Inoperable Battery ML18173A1792018-08-0707 August 2018 OEDO-17-00070 - Notice of Issuance of Director'S Decision, 2.206 Petition for Emergency Enforcement Action Per 10 CFR 2.206 at Listed U.S. Reactors with Forged Components and Parts Manufactured at France'S AREVA-Le Creusot Forge and Japan C ML17198A3292017-08-30030 August 2017 OEDO-17-00070 - Acknowledgement Letter, Paul Gunter, Beyond Nuclear, Petition for Emergency Enforcement Action Per 10 CFR 2.206 at Listed U.S. Reactors with Forged Components and Parts Manufactured at France'S AREVA-Le Creusot Forge and Jap ML17200A0652017-08-30030 August 2017 OEDO-17-00070 - Acknowledgement FRN, Paul Gunter, Beyond Nuclear, 2.206 Petition for Emergency Enforcement Action Per 10 CFR 2.206 at Listed U.S. Reactors with Forged Components and Parts Manufactured at France'S AREVA-Le Creusot Forge and NRC-2016-0214, Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Consideration; Correction to Notice Published October 25, 20162016-10-27027 October 2016 Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Consideration; Correction to Notice Published October 25, 2016 ML16300A1772016-10-27027 October 2016 Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Consideration; Correction to Notice Published October 25, 2016 NRC-2016-0020, ISFSI - FRN, Order Approving Direct and Indirect Transfer of Licenses and Draft Conforming License Amendments (CAC Nos. MF7075 and MF7076)2016-05-0606 May 2016 ISFSI - FRN, Order Approving Direct and Indirect Transfer of Licenses and Draft Conforming License Amendments (CAC Nos. MF7075 and MF7076) ML16130A6492016-05-0606 May 2016 ISFSI - FRN, Order Approving Direct and Indirect Transfer of Licenses and Draft Conforming License Amendments ML16032A3492016-02-0202 February 2016 Independent Spent Fuel Storage Installation - Correction Letter, Notice of Consideration of Approval of Transfer of Facility Operating Licenses and Conforming Amendments, and Opportunity for a Hearing (CAC MF7075-MF7076) ML15351A0502016-01-27027 January 2016 Independent Spent Fuel Storage Installation - Letter, Notice of Consideration of Approval of Transfer of Facility Operating Licenses and Conforming Amendment, and Opportunity for a Hearing ML15351A0532016-01-27027 January 2016 Independent Spent Fuel Storage Installation - FRN, Notice of Consideration of Approval of Transfer of Facility Operating Licenses and Conforming Amendment, and Opportunity for a Hearing ML15218A6252015-08-14014 August 2015 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 14, 2015 ML14043A2032014-02-19019 February 2014 Federal Register Notice Regarding the 612th ACRS Meeting, March 6-8, 2014 ML13225A5572013-08-12012 August 2013 Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit ML13210A2782013-08-0606 August 2013 FRN, Withdrawal of Amendment Request, Revise Technical Specification (TS) 3.3.1, Reactor Trip System (RTS) Instrumentation, and TS 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation ML13210A2772013-08-0606 August 2013 Letter, Withdrawal of Amendment Request, Revise Technical Specification (TS) 3.3.1, Reactor Trip System (RTS) Instrumentation, and TS 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation ML13064A4302013-03-12012 March 2013 Correction FRN, Correct Date of Safety Evaluation in One Column; Order Approving the Proposed Internal Restructuring and Indirect Transfer of License NRC-2012-0310, FRN, Order Approving Indirect License Transfer Regarding the Proposed Energy Future Holdings Corporate Internal Restructuring (TAC Nos. ME9767 and ME9768)2013-02-22022 February 2013 FRN, Order Approving Indirect License Transfer Regarding the Proposed Energy Future Holdings Corporate Internal Restructuring (TAC Nos. ME9767 and ME9768) ML13022A3342013-02-22022 February 2013 FRN, Order Approving Indirect License Transfer Regarding the Proposed Energy Future Holdings Corporate Internal Restructuring ML12292A2022013-01-0202 January 2013 ISFSI - Notice of Consideration of Approval of Application Containing SUNSI, Opportunity for a Hearing; Indirect License Transfer, Proposed Energy Future Holdings Corporation Internal Transaction NRC-2012-0301, ISFSI - FRN, Notice of Consideration of Approval of Application Containing SUNSI, Opportunity for a Hearing - Indirect License Transfer, Proposed Energy Future Holdings Corporation Internal Transaction2012-12-26026 December 2012 ISFSI - FRN, Notice of Consideration of Approval of Application Containing SUNSI, Opportunity for a Hearing - Indirect License Transfer, Proposed Energy Future Holdings Corporation Internal Transaction ML12292A2092012-12-26026 December 2012 ISFSI - FRN, Notice of Consideration of Approval of Application Containing SUNSI, Opportunity for a Hearing - Indirect License Transfer, Proposed Energy Future Holdings Corporation Internal Transaction ML12056A0442012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status NRC-2012-0067, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status2012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status 2024-09-13 |
Retrieved from "https://kanterella.com/w/index.php?title=ML13210A278&oldid=418327"