ML23265A154

From kanterella
Revision as of 08:39, 25 November 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Email Transmitting- Revised Completeness Determination for NuScale Topical Report TR-0516-49416, Non-Loss-Of-Coolant Accident Analysis Methodology, Revision 4
ML23265A154
Person / Time
Site: 05200050
Issue date: 09/22/2023
From: Getachew Tesfaye
NRC/NRR/DNRL/NRLB
To:
NuScale
References
EPID L-2022-TOP-0017, TR-0516-49416, Rev 4
Download: ML23265A154 (1)


Text

1 Getachew Tesfaye From:

Getachew Tesfaye Sent:

Friday, September 22, 2023 3:15 PM To:

'regulatoryaffairs@nuscalepower.com' Cc:

'Griffith, Thomas'; 'Osborn, Jim'; 'Fowler, Wren'; 'Fairbanks, Elisa'; 'tcase@nuscalepower.com';

Matthew Mitchell; Thomas Hayden; Stacy Joseph; David Drucker

Subject:

Non-Loss of Coolant Accident Analysis Methodology Licensing Topical Report - Revised Completeness Review - NRC Form 898 Attachments:

Non-LOCA Revised NRC 898 for Resource Estimate signed.pdf Aached please "nd the completed NRC Form 898 for the U.S. Nuclear Regulatory Commission sta Licensing Topical Report (LTR) Completeness Determinaon for NuScale Power, LLC Topical Report TR051649416, "NonLoss of Coolant Accident Analysis Methodology, Revision 4. The LTR was submied by leer dated January 5, 2023 (Agencywide Documents Access and Management System [ADAMS] Accession Nos. ML23005A306 [proprietary] and ML23005A305

[nonproprietary]). By leer dated July 14, 2023 (ML23195A092), NuScale submied supplemental informaon to support detailed technical review of the LTR.

In the email that transmied the original NRC Form 898 on July 31, 2023 (23206A106), we commied to provide resource esmates within 60 days of the transmial of the email. Accordingly, the sta has completed its evaluaon of the resource needs and esmates the LTR review will require approximately 4,660 sta hours and $170,000 for contractor support. This resource esmate was discussed with your sta, Wren Fowler, on September 21, 2023.

If you have any quesons, please feel free to contact me at 3014158013.

Thank you, Getachew Tesfaye (He/Him)

Senior Project Manager NRC/NRR/DNRL/NRLB 301-415-8013