ML23058A013

From kanterella
Jump to navigation Jump to search

Email Transmitting NRC Form 898, Topical Report TR-124587, Extended Passive Cooling and Reactivity Control Methodology, Rev. 0
ML23058A013
Person / Time
Site: 05200050
Issue date: 03/17/2023
From: Getachew Tesfaye
NRC/NRR/DNRL/NRLB
To:
References
TR-124587, Rev. 0, EPID L-2022-TOP-0018
Download: ML23058A013 (1)


Text

Getachew Tesfaye From: Getachew Tesfaye Sent: Friday, March 17, 2023 5:52 AM To: Regulatory Affairs Cc: Griffith, Thomas; Osborn, Jim; Terwilliger, Stephanie; Scanlon, Shane; Sfowler@nuscalepower.com; Michael Dudek; Bruce Bavol; Stacy Joseph

Subject:

Completeness determination for NuScale Topical Report TR-124587, "Extended Passive Cooling and Reactivity Control Methodology, Revision 0 Attachments: Extended Passive Cooling Completeness Review NRC 898 (3) signed.pdf Attached please find the completed NRC Form 898 for the U.S. Nuclear Regulatory Commission staff Licensing Topical Report (LTR) Completeness Determination for NuScale Power, LLC Topical Report TR-124587, "Extended Passive Cooling and Reactivity Control Methodology, Revision 0. The LTR was submitted by letter dated January 5, 2023 (Agencywide Documents Access and Management System [ADAMS]

Accession Nos. ML23005A309 [proprietary] and ML23005A308 [nonproprietary]). The NRC staff has reviewed the submitted information and found that it does not provide sufficient technical information to enable the NRC staff to complete a detailed technical review.

The NRC staff requests that NuScale address the Requests for Supplemental Information (RSIs) identified in the NRC letter dated March 17, 2023 (ML23058A160) by September 15, 2023. Following receipt of the identified supplemental information, the NRC staff will establish 1) a detailed review schedule, which may be longer or shorter than the generic review schedule, and 2) a projected level of effort to complete the detailed technical review. If the information requested by the NRC staff is not received by the above date, the application will not be docketed for review.

If you have any questions, please feel free to contact me at 301-415-8013.

Getachew Tesfaye, Senior Project Manager New Reactor Licensing Branch Division of New and Renewed Licenses Office of Nuclear Reactor Regulation Docket No.: 05200050 1