Category:Fire Protection Plan
MONTHYEARML23317A1682023-11-0303 November 2023 9 to Fire Protection Safe Shutdown Capability (EC 297539, Section 3.2 and EC 296106 Section 3.2 and Section 3.4), 10CFR50, Appendix R ML22245A1002022-05-0505 May 2022 9 to Evaluation and Comparison to BTP Apcsb 9.5-1, Appendix a - Redacted ML22131A1272022-05-0505 May 2022 8 to Fire Protection of Safe Shutdown Capability (Appendix R) ML20323A1702020-10-22022 October 2020 Rev. 17 to Fire Protection Safe Shutdown Capability ML17310A4732017-10-27027 October 2017 Seabrook Station Revision 15 to Appendix R, Fire Protection of Safe Shutdown Capability ML16147A2022016-04-29029 April 2016 Revision 17 to Updated Final Safety Analysis Report, Fire Protection of Safe Shutdown Capability (10CFR50, Appendix R) ML14317A4812014-10-21021 October 2014 Updated Final Safety Analysis Report, Revision 16, Cover, Loep, and Chapter 1, Introduction and General Description of Plant ML14317A4912014-10-21021 October 2014 Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 2, Appendix 2E, Historical Earthquakes in the Site Vicinity ML14317A4952014-10-21021 October 2014 Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 2, Appendix 2C, Geologic Investigations of the Scotland Road Fault ML14317A4972014-10-21021 October 2014 Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 2, Appendix 2G, Static Dynamic Rock Properties ML14318A0242014-10-21021 October 2014 Seabrook Station Updated Final Safety Analysis Report, Revision 16, Fire Protection of Safe Shutdown Capability (10CFR50, Appendix R), Revision 13 ML14317A4962014-10-21021 October 2014 Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 2, Appendix 2D, Geologic Bedrock Logs of Boring in the Site Area ML14317A4942014-10-21021 October 2014 Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 2, Appendix 2B, Onsite Meteofological Data Summaries; April 1979 - March 1980 ML14317A4922014-10-21021 October 2014 Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 2, Appendix 2F, Geotechnical Report - Reactor Borings ML14317A4792014-10-21021 October 2014 Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 2, Figures 2.3-1 Through 2.3-11 2023-11-03
[Table view] |