ML23307A077

From kanterella
Revision as of 09:07, 13 November 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
301 ADAMS 2B
ML23307A077
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 11/03/2023
From:
NRC/RGN-II
To:
References
50-369/23-301, 50-370/23-301 50-369/OL-23, 50-370/OL-23
Download: ML23307A077 (1)


Text

Form 2.1-1 Examination Preparation Checklist

Facility: ____McGuire __________________________ Date of Examination: _Jul/Aug2023 ___

Developed by: Written: Facility x NRC // Operating: Facility x NRC Target Chief Date* Task Description Examiners Initials

1. Examination administration date confirmed (A.1-5). For NRC-prepared examinations, MB

-240 arrangements are made for the facility licensee to submit reference materials (B.4, C.4.g and F).

-210 2. NRC examiners and facility licensee contact assigned (B.1 and C.1-3). MB

3. Facility licensee contact briefed on examination security and other requirements (D.4). As MB

-210 applicable, the facility licensee contact submits to the NRC any prescreened K/As for elimination from the written examination outline, with a description of the facility licensees prescreening process (ES-4.1 A.1.a and ES-4.1 B.2).

-210 4. Reference material due for NRC-prepared examinations (F). MB

-210 5. Examination kick-o ff call held (C.4). The NRC sends the c orporate notification letter (A.5). MB

-195 6. Written examination outline developed by the NRC and sent to the facility licensee contact MB (must be on the examination security agreement) (B.2, ES-4.1 A.1.b and ES-4.1 A.2.a).

7. Operating test outlines and checklists due: Forms 1.3-1, 2.3-1, 3.2-1, 3.2-2, 3.3-1, and 3.4-1, as MB

-150 applicable (B.6). Facility licensee provides a draft operating test administration schedule to the NRC (B.18).

-136 8. Operating test outlines reviewed by the NRC and feedback provided to the facility licensee MB (ES-2.3).

-100 9. NRC-prepared examinations approved by the NRC supervisor and forwarded for facility MB licensee review (ES-2.3).

10. Proposed examinations (written, JPMs, and scenarios, as applicable) and outline forms; MB

-75 quality checklists and supporting documentation (including Forms 2.3-2 and 2.3-4 and any Form 2.3-1, 1.3-1, and 3.4-1 updates); and reference materials due.

-60 11. Preliminary waiver/excusal requests due (ES-2.2 E.1). MB

-50 12. Written examination and operating test reviews completed (ES-2.3). The NRC supervisors MB authorization to proceed with the facility review granted (ES-2.3 D).

-50 13. Examination review results discussed between the NRC and the facility licensee (B.14). MB

-35 14. Examination preparatory week conducted by the NRC and the facility licensee (I). MB

-30 15. Preliminary license applications, including any waiver/excusal requests, due (ES-2 -2 C.1). MB

-14 16. Final license applications, including any waiver/excusal requests, due and Form 2.2-1 MB prepared (ES-2.2 C and E).

-7 17. Written examinations and operating tests approved by the NRC supervisor (C.9) MB

-7 18. Facility licensee management feedback on the examination requested by the NRC MB supervisor (C.10).

-7 19. Final applications reviewed; 10% of applications audited to confirm qualifications/eligibility MB (ES-2.2 G); and examination approval letter (Letter 2.3-1) and waiver/excusal letters sent.

-7 20. Written examination administration guidelines reviewed with the facility licensee (D.14). MB

-7 21. Approved scenarios and job performance measures distributed to NRC examiners (D.12). MB

  • Target dates are based on facility licensee-prepared examinations and the examination date identified in the corporate notification letter. These dates are for planning purposes and may be adjusted in coordination with the facility licensee.

Form 5.1-1 Post examination Check Sheet

Postexamination Check Sheet

Facility: McGuire Dates of Examination: Jul/Aug 2023

Activity Description Date Complete

1. *Received poste xamination package from f acility licensee and verified complete. (ES-4.4) 8/23/23
2. *Reviewed and incorporated any necessary facility and applicant written examination comments. NRC grading of written examination 9/19/23 completed. (ES-4.4)
3. *Reviewed and incorporated any necessary facility and applicant operating test comments. NRC grading of operating test completed. 9/19/23 (ES-3.6)
4. *Completed NRC chief examiner review of operating test and written examination grading. (ES-3.6 and ES-4.4) 9/19/23
5. Completed licensing official review. 9/20/23
6. Mailed licenses, preliminary results, and p ass letters. 9/20/23
7. Notified facility licensee of results. 9/20/23
8. Issued the examination report (refer to Operator Licensing Manual 9/20/23 Chapter (OLMC) 510, Operator Licensing Examination Reports ).
9. Returned reference material after final resolution of any informal 10/6/23 NRC staff reviews, hearing demands, or both.
10. Performed examination recordkeeping activities (refer to OLMC 520, Operator Licensing Examination Records and Documentation, and 10/10/23 Management Directive 3.53, NRC Records and Document Management Program).
  • Activity may not be applicable for a retake examination. If this activity does not apply, place an N/A in the Date Complete column.

J_DUKEEdward R. Pigott Site Vice President McGuire Nuclear Station ENERGY Duke Energy MG01VP 112700 Hagers Ferry Road Huntersville, NC 28078 o: 980.875.4805 Edward.Pigott@duke-energy.com deleted RA-23-0220 August 23, 2023 Laura A. Dudes, Regional Administrator U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257

SUBJECT:

Duke Energy Carolinas, LLC (Duke Energy)

McGuire Nuclear Station (MNS), Units 1 and 2 Docket Numbers: 50-369, 50-370 Reactor and Senior Reactor Operator Initial Examination 05000369/2023301 and 05000370/2023301 10 CFR 55.5 Pursuant to the requirements of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Duke Energy hereby provides submission of post-examination documentation for the McGuire licensed operator examination administered July/August, 2023.

Specific items attached include:

  • Student answer sheets and Exam cover pages
  • Master copy of the RO and SRO examinations and answer keys
  • Student questions/proctor responses during the written examination
  • Student Seating Chart
  • ES-1.3-1, Examination Security Agreement
  • Post Exam Comments Questions or comments should be directed to Steven Mosteller at (980) 875-5981 or Jeff Thomas at (980) 875-4499.

Sincerely, Edward R. Pigott Duke Energy McGuire Nuclear Station Site Vice President