ML24159A217

From kanterella
Revision as of 18:19, 5 November 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 8, Figures
ML24159A217
Person / Time
Site: Cook  
Issue date: 05/30/2024
From:
Indiana Michigan Power Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML24159A261 List: ... further results
References
AEP-NRC-2024-20
Download: ML24159A217 (1)


Text

...\\RLR\\fsar-fig-8.1-2a_27.dgn 11/6/2017 9:18:19 AM

...\\fsar-fig-8.1-2B_27.dgn 8/28/2017 3:18:27 PM VITAL INSTRUMENT BUS DISTRIBUTION SYSTEM

FSAR FIG. 8.3 - 1 A B C D E F G H J K L M N O

600V AUX. BUS 600V AUX. BUS 250V DC DISTRIBUTION 600V AUX. BUS 600V AUX. BUS

1 1 FED FROM BUS '11A' FED FROM BUS '11B' FED FROM BUS '11C' FED FROM BUS '11D'

2 2

3 BATTERY "AB" CHARGER BATTERY "CD" CHARGER 3 TRANSF. CABINET TRANSF. CABINET

4 4

5 5

REFERENCES:

OP-1-12003

18.0 18.0

6 6

18.0 18.0 18.0

7 7

18.0REVISED: PER UCR-1603.

DATE NO. DESCRIPTION APPD.

REVISIONS FILENAME : fsar-fig-8-3-2_18-0.dwg

"THIS DRAWING IS THE PROPERTY OF THE AMERICAN ELECTRIC POWER SERVICE CORP AND IS LOANED UPON CONDITION THAT IT IS NOT TO BE REPRODUCED OR 8 COPIED, IN WHOLE OR IN PART, OR USED FOR 8 FURNISHING INFORMATION TO ANY PERSON WITHOUT THE CONSENT OF THE AEP SERVICE CORP, OR FOR ANY PURPOSE DETRIMENTAL TO THEIR INTEREST, AND IS TO BE RETURNED UPON REQUEST" INDIANA MICHIGAN POWER COMPANY DONALD C. COOK NUCLEAR PLANT BRIDGMAN MICHIGAN

9 9

SCALE: DR:NONE

DATE: CH:

BATTERY '1AB' BATTERY '1CD'

A B C D E CM 1 2 3 4 5 6 7FG 316INCH 4 H 12 16 TENTHS 10 K 20 30 3LINCHES1M2NO 600 V AUX BUS 600 V AUX BUS

FED FROM BUS "IID" 250 V DC FED FROM BUS "IIB"

BATTERY "I N"

BATTERY BATTERY CHARGER CHARGER TRAIN A TRAIN B FRV - 256 POSITION INDICATION CTL BUS FAILURE

250 V DC DISTRIBUTION CAB.

"DCN"

VCC "AB-N"

17 REVISED PER UCR 620 FMO-211 TURBINE DRIVEN AMSAC FMO-221 AUX FEED WATER INVERTER CONTROL BUS FMO-231

FMO-241

INDIANA MICHIGAN POWER COMPANY QT-506 DONALD C. COOK NUCLEAR PLANT

BRIDGMAN MICHIGAN UNITS NO. 1 & 2 250 V Distribution "IN" N Battery

FSAR FIG. 8.3 - 3

ARCH ELEC MECH STR

AEP SERVICE CORP.1 RIVERSIDE PLAZA COLUMBUS, OH 43215 NOTE:

VALVE POSITIONS ARE NOT GOVERNED BY THE UFSAR FIGURES BUT RATHER BY STATION PROCEDURES (EXCEPT VALVES WITH LOCKED OR SEALED, AND FAILURE POSITIONS AS INDICATED).

16.6Revised Per UCR 98-UFSAR-0458

DIESEL FUEL OIL DAY TANKS DIESEL FUEL OIL DAY TANKS (WHEN FULL, EACH DAY TANK (WHEN FULL, EACH DAY TANK CONTAINS FUEL FOR CONTAINS FUEL FOR APPROXIMATELY 87 MINUTES OF APPROXIMATELY 87 MINUTES OF DIESEL GENERATOR OPERATION AT DIESEL GENERATOR OPERATION AT FULL LOAD) FULL LOAD) 16.6 16.6

EMERGENCY DIESEL GENERATOR FUEL OIL SUPPLY UNITS NO. 1 & 2 FSAR FIG. 8.4 - 1