ML24065A101

From kanterella
Revision as of 15:39, 2 September 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Kairos Power LLC, Transmittal of Reponses to NRC Requests for Confirmatory Information for the Review of the Hermes 2 Environmental Report
ML24065A101
Person / Time
Site: Hermes  File:Kairos Power icon.png
Issue date: 03/04/2024
From: Hastings P
Kairos Power
To:
Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML24065A100 List:
References
KP-NRC-2403-003
Download: ML24065A101 (1)


Text

KP-NRC-2403-003

March 4, 2024 Docket No. 50- 611 Docket No. 50-612

US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Kairos Power LLC Transmittal of Reponses to NRC Requests for Confirmatory Information for the Review of the Hermes 2 Environmental Report

References:

1. Letter, Kairos Power LLC to Document Control Desk Submittal of the Construction Permit Application for the Hermes 2 Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes 2), Revision 0, July 14, 2023 (ML23195A122)
2. Nuclear Regulatory Commission, Kairos Power, LLC Hermes 2 Environmental Report Audit Plan, January 5, 2024 (ML23353A069)
3. Email, Peyton Doub (Nuclear Regulatory Commission) to Martin Bryan (Kairos Power), RCI Confirmation Message, February 26, 2024

In Ju ly 2 023, Kairos Powe r LLC s ubmitted it s E nvironmental Report ( ER) (Reference 1) in s upport o f t he construction p ermit ap plication (CPA) for th e Hermes 2 n on-power reactor. In January 2 024, the Nuclear Regulatory C ommission p rovided th e Hermes 2 Environment al Audit P lan (Reference 2). As a result o f that a udit, the N uclear R egulatory C ommission ( NRC) provided eight requests f or c onfirmatory information ( RCIs) t hat t he s taff w ill use to evaluat e the environmental i mpacts f rom th e proposed action (Reference 3 ). The enclosur e to th is l etter p rovides Kairos P owers confirmation of each R CI.

Kairos P ower requests N RC re view o f this in formation in s upport of c ontinued r eview of th e Hermes 2 CPA.

If you have any questions or need any additional information, please contact M arty Bryan at bryan@kairospower.com or at (865) 399-1 136, or Darrell Gardner at gardner@kairospower.com or (704) 769-1 226.

I d eclare u nder p enalty o f perjury t hat t he foregoing i s t rue an d correct .

Executed o n March 4, 2 024

Peter Hastings, PE Vice President, Regulatory Affairs and Quality

Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A 5201 Hawking Dr SE 2115 Rexford Rd, Suite 325 Alameda, CA 94501 Albuquerque, NM 87106 Charlotte, NC 28211 KP-NRC-2403- 003 Page 2

Enclosures:

1) Kairos Power Response to NRC Requests for Confirmat ory Information for the Review of the Hermes 2 Environmental Report

xc (w/enclosure):

William Jessup, Chief, NRR Advanced Reactor Licensing Branch Peyton Doub, Environmental Project Manager, NMSS, Environmental Review Branch Mary Richmond, Environmental Project Manager, NMSS, Environmental Review Branch

KP-NRC-2403- 003

Enclosure 1

Kairos Power Response to NRC Requests for Confirmatory Information for the Review of the Hermes 2 Environmental Report

(Non-Proprietary)