ML24150A244

From kanterella
Revision as of 18:50, 28 August 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Kairos Power, LLC - Presentation Materials for Kairos Power Briefing to the Advisory Committee on Reactor Safeguards, Kairos Power Subcommittee on Hermes 2 Preliminary Safety Analysis Report, Chapters 2, 3, 5, 9, and 13
ML24150A244
Person / Time
Site: Hermes, 99902069  File:Kairos Power icon.png
Issue date: 05/29/2024
From: Hastings P
Kairos Power
To:
Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML24150A243 List:
References
KP-NRC-2405-010
Download: ML24150A244 (1)


Text

KP-NRC -2405 -010 707 W Tower Ave , Suite A 5201 Hawking Dr SE 2115 Rexford Rd, Suite 325 Alameda, CA 94501 Albuquerque, NM 87106 Charlotte, NC 2 8211 May 29, 2024 Docket No. 50-611 Docket No. 50 -612 US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 -0001

Subject:

Kairos Power LLC Presentation Materials for Kairos Power Briefing to the Advisory Committee on Reactor Safeguards, Kairos Power Subcommittee on Hermes 2 Preliminary Safety Analysis Report Chapters 2, 3, 5, 9, and 13

Reference:

Letter, Kairos Power LLC to Document Control Desk, Submittal of the Preliminary Safety Analysis Report for the Hermes 2 Kairos Power Fluoride Salt -Cooled, High Temperature Non -Power Reactor (Hermes 2), Revision 0, July 14, 2023 (ML23195A122)

In July 2023, Kairos Power submitted Revision 0 of the Preliminary Safety Analysis Report (PSAR) as part of the Construction Permit Application for the Hermes 2 non-power reactor (referenced above). This letter transmits the presentation slides for the May 16, 2024 briefing for the Advisory Committee for Reactor Safeguards (ACRS), Kairos Power Subcommittee. During the May 16 meeting, participants will discuss Hermes PSAR Chapters 2, 3, 5, 9, and 13, which were submitted for NRC review. provides the non-proprietary slides for the June 4, 2024, briefing. Kairos Power authorizes the Nuclear Regulatory Commission to reproduce and distribute the submitted content, as necessary, to support the conduct of their regulatory responsibilities.

If you have any questions or need any additional information, please contact Drew Peebles at peebles@kairospower.com or (704) 275-5 388, or Darrell Gardner at gardner@kairospower.com or (704) 769-1226.

Sincerely, Peter Hastings, PE Vice President, Regulatory Affairs and Quality Kairos Power LLC www.kairospower.com

KP-NRC-2405-010 Page 2

Enclosure:

Presentation Slides for the June 4, 2024 ACRS Kairos Power Subcommittee Meeting (Non-Proprietary)

xc (w/enclosure):

Joshua Borromeo, Chief, NRR Advanced Reactor Licensing Branch Michael Orenak, Project Manager, NRR Advanced Reactor and Licensing Branch Matthew Hiser, Project Manager, NRR Advanced Reactor Licensing Branch Cayetano Santos, Project Manager, NRR Advanced Reactor Licensing Branch Brian Bettes, Project Manager, NRR Advanced Reactor Licensing Branch Weidong Wang, Senior Staff Engineer, Advisory Committee for Reactor Safeguards