3F0184-12, Monthly Operating Rept for Dec 1983
| ML20083J084 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 12/31/1983 |
| From: | Graham D, Westafer G FLORIDA POWER CORP. |
| To: | Deyoung R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| 3F0184-12, 3F184-12, NUDOCS 8401160167 | |
| Download: ML20083J084 (5) | |
Text
.
OPERATING DATA REPORT DOCKET NO. 50-102 DATE 1/4 /84 COMPLETED BY n nenknm TELEPHONE (904) 795.-3802 OPERATING STATUS Crystal River Unit 3 N05
- 1. UrJt Name:
2 Reporting Period: 12/1/83 - 12/31/83
- 3. Licensed Thermal Power (MWt):
2544
- 4. Nameplate Rating (Gross Mhe): 890
- 5. Design Electrical Rating (Net MWe): 825
- 6. Maximum Dependable Capacity (Gross MWe): 850 8II
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A
- 9. Power Level To which Restricted. If Any (Net MWe): N/A
- 10. Reasons For Restrictions,if Any: N/A This Month Yr..to.Date Cun:ulatise i1. Hours In Reporting Period 744 8760 59640
- 12. Number Of Hours Reactor Was Critical 744 5362 37569.2
- 13. Reactor Reserve Shutdown Hours 0 0 1280.3
- 14. Hours Generator On.Line 733.2 5152.1 36619
- 15. Unit Reserve Shutdown Hours 0 0 0
- 16. Gross Thermal Energy Generated (MWH) 1768273 11439380 81964335
- 17. Gross Electrical Energy Generated (MWH) 618683_ ,,_,
3960119 27926736
- 18. Net Electrical Energy Generated (MWH) 590175 1772201 26517081
- 19. Unit Service Factor 98.5% 58.8% 61.4% _
- 20. Unit Availability Factor 58.5% 58.8% 61.4%
- 21. Unit Capacity Factor (Using MDC Net) 97.8% 53.1% 56.3%
- 32. Unit Capacity FactorIUsing DER Net) 96.2% 52.2% 53.9%
- 23. Unit Forced Outage Rate 1.5Y 1.67 21.57
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each t:
Nnno
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
- 26. Units in Test Status IPrior to Commercial Operation): Forecast Achiesed INITIA L CRITICALITY l/14/77 4 INITI A L ELECTRICITY I/30/77 COMMERCIAL OPER ATION 3/13/77 kDN O! O gyj77, 4, R
7
! AVERAGE DAILY UNIT POWER LEVEL t
DOCKET NO. 50-302 UNIT FLCRP-3 DATE 1/4/84 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 MONTH December 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY power LEVEL (MWe Neti iMWe. Net )
I 859 17 859 850 gg 846 2 _
3 8A5 19 866 4 845 _ 20 826 5 858 21 852 858 3, 866 6
7 AAC 23 825 g 843 24 875 862 817 9 25 009 % 777 10 11 825 2; 211 605 ,g 579 12 622 29 758 13 14 717 30 826 856 3, 821 15 846 16 s
INSTRUCTIONS On this format.hst the aserage dail> unit power lesel m ilWe Net for each day in the reportine m.. nth. Compute to the nearest whole megawatt.
m '77 )
.m DOCKET NO. 50-302 UNIT SHUTDOWNS AND POWER REDUCTIONS UNil'NAME FTI'RP-3 DATE 1/A/RA COMPLETED BY D_ FfalAa REPORT MON Tlg 12/83 TELEPHONE (904) 795-3802 "k 5
= en 3w I s.cernee g-t, 5% Cause & Corrective
- , 2 _:c p p E .4 Action to
%. 1).ete g 3g 4 jgy E ent =? E~$
- E Repott " '$ 0 Present Recurrence c5 3 j5C 6
N/A N/A HC HTEXCH Reduced power to clean condenser l 83-34 831211 S 37.7 B '
tubes. \
F 10.8 A N/A N/A HF HTEXCH Extreme cold weather caused an influx l
83-35 831226 of fish into the circulating water system which resulted in a failure of the traveling screens. Turbine was taken out of service.
68.3 B N/A N/A HC HTEXCH Reduced power to clean condenser 83-36 831226 F tubes following large influx of fish.
l
.I 4 2 Esinbit G Instruciions 1
Method; I: forced Reason:
I Manual for Picpasation of Data S: Stheduled A l quipment Failure (Explain) Entr> Sheets foi Licensee B-Maintenance of Test 2-Manual Scram.
1 Aianmatic Sesam. Esent Rep nl 11.1 Rll' ele INilRI G.
C-Refueling Ol t>I i 4 Other it:xpl.nn)
D-Regulator) Restriction 1 -Operator 1rainm3& lacense ITamination 5 I - Adina tiest ratise I %Inhil ! - SJme Soutte G-OperJttonJI I trol (I %plJud p /77) ll Othei lliplaini
e
- HONTHLY OPERATIONAL
SUMMARY
STATEMENT DOCKET NO. 50402 UNIT FLCRP-1 DATE 1/4/84 COMPLETED BY D. Fields TELEPHONE (904) 795-3802 MONTH December 1983
SUMMARY
STATEMENT:
The unit operated at or near full capacity for the entire month. Extreme cold weather and a resultant influx of fish forced the turbine off-line for an eleven hour period. There were no scrams or reactor shutdowns for the month.
i e
e h
cae
}
t January 9,1984 3F0184-12 Mr. Richard C. DeYoung, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Attn.: Document Control Desk Washington, DC 20555
Subject:
Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report
Dear Mr. DeYoung:
Attached are twelve (12) copies of the Crystal River Unit 3 December 1983 Monthly Operating Report. This report is submitted in accordance with Technical Specification 6.9.1.6.
Sincerely,
/ /
G. R. Westafer Manager, Nuclear Operations Licensing and Fuel Management AEFijcf Attachments cc: Mr. J.P. O'Reilly Regional Administrator, Region 11 Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30303 74 1
1 \
GENERAL OFFICE 3201 Thirty fourth Street South e P.O. Box 14042, St. Petersburg, Florida 33733 e 813-866-5151